A PROCESS PERFORMANCE MEASUREMENT FRAMEWORK FOR PT. TERMINAL PETIKEMAS SURABAYA INSIGHT IN THE PROCESSES OF THE CONTAINER FREIGHT STATION Guus Aarts 23-06-2014.

Slides:



Advertisements
Similar presentations
Technical skills and competences
Advertisements

Module N° 7 – SSP training programme
[Organisation’s Title] Environmental Management System
Service Delivery – your ticket to play
Competencies Are King… Improving organizational and staff performance
Environmental Management System (EMS)
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
Internal Controls Becoming Compliant. Design & Implementation of Internal Controls. Design: Need to show that a framework is in place to establish internal.
ITIL: Service Transition
Coping with Electronic Records Setting Standards for Private Sector E-records Retention.
System Office Performance Management
Chapter 2 Succeeding as a Systems Analyst
By Saurabh Sardesai October 2014.
Quality evaluation and improvement for Internal Audit
Computer Security: Principles and Practice
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA Management Responsibility.
Top management jobs BP-Centro Finland Erno Karpoff
What is Business Analysis Planning & Monitoring?
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
CCSB223/SAD/CHAPTER141 Chapter 14 Implementing and Maintaining the System.
GWS SMS INTRODUCTION MSM Manual. 3. MISSION STATEMENT AND CORE VALUES OF THE COMPANY  MISSION  Our Mission is to provide expertise in the fields of.
Chapter 8: Systems analysis and design
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
ISO9001 Pre Assessment Team 10 PT Han Jian Da, Alphy Thomas Kanatt, Xia Xi, Wu Jun, May Lwin, Chit Khun, Mohit Srivastava, Kovalan Venkatesan.
Committee of Sponsoring Organizations of The Treadway Commission Formed in 1985 to sponsor the National Commission on Fraudulent Financial Reporting “Internal.
ITIL Overview 1 Configuration Management Working Group February 8, 2011.
Systems Analysis and Design
1 Implementing a Business Management System compliant to ISO 9001:2000.
The Balanced Score Card
D1.HRD.CL9.06 D1.HHR.CL8.07 D2.TRD.CL8.09 Slide 1.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Introduction to the Continual Service Improvement Toolkit Welcome.
QUALITY MANAGEMENT STATEMENT
African Regional Director
1. 2 Due to the pervasive nature of ICT, the new millennium will require a new breed of ICT knowledge workers with a whole range of new skill sets Training,
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Improving your Audit Process Through Technology Christopher McDonald Director of Field Loss Prevention, Babies R’ Us Inc.
Kathy Corbiere Service Delivery and Performance Commission
ISO Registration Common Areas of Nonconformances.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Discuss the analytical skills, including systems thinking, needed for a systems analyst to be successful Describe the technical skills required of a systems.
Copyright © 2007 Pearson Education Canada 9-1 Chapter 9: Internal Controls and Control Risk.
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Results Oriented Monitoring & Evaluation Model (ROMEM) Presented by Shawn Grey Ministry of Transport and Works Jamaica. Model developed by MTW and DPMI.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Chapter 15 Telecommunication Department Management.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
1 Balanced Scorecard Philosophy, Basics, Fundamentals, and Functions.
Chapter 6 Internal Control in a Financial Statement Audit McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Personnel.
UNDERSTANDING ISO 9001:2008.
Project Quality Management
ISO/IEC
PowerPoint to accompany:
Job Description – Area Manager
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
Quality Management Systems – Requirements
Performance Measurement
Across the entire value chain
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
Portfolio, Programme and Project
Presentation transcript:

A PROCESS PERFORMANCE MEASUREMENT FRAMEWORK FOR PT. TERMINAL PETIKEMAS SURABAYA INSIGHT IN THE PROCESSES OF THE CONTAINER FREIGHT STATION Guus Aarts

‘You can’t manage what you can’t measure’ - William Edwards Deming

PT. TERMINAL PETIKEMAS SURABAYA PT. Terminal Petikemas Surabaya Container terminal service provider Tanjung Perak Gateway to Eastern Indonesia Subsidiary PT Pelindo III DP world

CONTAINER FREIGHT STATION Container freight station (CFS): ‘a place where containers are stuffed, de-stuffed and consolidation/deconsolidation of export/import goods takes place’ Services: General cargo receiving and stuffing service Stripping and general cargo delivery service Customs inspection

MOTIVATION Management of TPS concluded that: The CFS is an unprofitable department Goal TPS: Make CFS into a profitable department by operating more efficient Increased competition by opening PT. Terminal Teluk Lamong Goal TPS: Enhance service excellence and reliability to improve competitive position Optimize processes in the CFS

MOTIVATION TPS states that to optimize, the following is needed: Insight in the processes Ability to measure performance of the processes Knowledge of the current performance

RESEARCH OBJECTIVE “The objective of this research is to develop a process performance measurement framework which will give TPS the ability to identify performance measures to be able to measure the performance of the processes in the Container Freight Station and to be able to control and monitor the processes continuously”

CURRENT SITUATION CFS processes Stripping Stuffing Receiving Delivery Customs inspection Operations department Support manager ultimately responsible

CURRENT SITUATION Current insight and ability to measure 4 Key Performance Indicators: % Achieved against jobs ordered % of Cases closed 72 hours after receiving complaint Time taken per transaction minutes Number of processes reviewed per month 1 fully dedicated to the CFS: KPI: % Achieved against jobs ordered Controlling and monitoring is lacking since October 2013

CURRENT SITUATION Current insight and ability to measure: Barely ability to measure 1 KPI dedicated to CFS  only customs inspection No insight in other four processes CFS is unable to measure the performance of the processes which results in insufficient insight in the processes.

PROCESS PERFORMANCE MEASUREMENT FRAMEWORK Need: Identification KPI’s Secure controlling of KPI Prevent lacking of monitoring KPI Requirements TPS: Identification of KPI’s KPI’s linked to strategy KPI’s based on operational processes Plan to secure controlling of KPI’s Plan to monitor KPI’s

PROCESS PERFORMANCE MEASUREMENT FRAMEWORK Requirements Frameworks Identification of KPI’s KPI’s linked to strategy KPI’s based on operational processes Plan to secure controlling of KPI’s Plan to monitor KPI’s Desk research Literature study - KPI’s based on operational processes

PROCESS PERFORMANCE MEASUREMENT FRAMEWORK Requirements Identification of KPI’s KPI’s linked to strategy KPI’s based on operational processes Plan to secure controlling of KPI’s Plan to monitor KPI’s Vitale logistiek Identification of KPI’s KPI’s linked to strategy KPI’s based on operational processes Plan to secure controlling of KPI’s Plan to monitor KPI’s 1.Project Sheet 2.Blue print 3.Strategic window 4.Longlist 5.Shortlist 6.AImplementation proposal B Implementation 7.Control plan 8.Training 9.Evaluation 1.Project Sheet 2.Blue print 3.Strategic window 4.Longlist 5.Shortlist 6.AImplementation proposal B Implementation 7.Control plan 8.Training 9.Evaluation

VITALE LOGISTIEK 6B Implementation 8 Training 9Evaluation

PROCESS PERFORMANCE MEASUREMENT FRAMEWORK Detailed description framework: 1.Project sheet 2.Blue print 3.Strategic window 4.Longlist 5.Shortlist 6.Implementation proposal 7.Control plan 8.Monitor plan Step-by-step guidance to identify, control and monitor KPI’s

CASE STUDY 1 Project sheet – Plan of Approach and chapter 1 2 Blue print: The process description including the data structure Mother flowchart Process hierarchy diagram – Main process, processes and procedures Process overview flowchart and data structure Detailed process flowchart and data structure Overview of the information systems and their interrelationship Description of the financial structure. IDName of documentProviderReceiver D1 Letter of Stuff Request( original document, advance payment and goods list) CustomerDocument Service Staff D2 Job order(CEIR) Document Service Staff Customer D3 Two job order copies Document Service Staff CFS administration D4 Tally Sheet – signCFSCustomer D5 exported container removal sheet CFS Operations Assistant Manager - Yard and Gate Operations Staff - Yard & Berth Planning Staff - Administration & Document Staff D6 Good stuffing and receiving document CFSAdministration & Document Staff

CASE STUDY 2 Blue print Process description based on process business superintendent Data structure not completed Financial structure not completed No bottlenecks found and eliminated

CASE STUDY 3. Strategic window Strategic objectives: No defined strategic objectives o Increase profitability O Improve service excellence o Improve reliability o Improve efficiency o Maintain zero-accident policy

CASE STUDY 3. Strategic window Critical success factors Increase profitability Improve service excellence Improve reliability Improve efficiency Maintain zero- accident policy Maximize revenue Reduce unachieved services Maintain consistent delivery of services Reducing cycle time for each operation Zero accidents Attracting new customers Reduce defects Accurate information delivery Competent personnel Cost effectiveness Sufficient availability equipment Correct execution procedures Retention customers Minimize equipment downtime Improve safety Ensure equipment reliability Sufficient availability space Sufficient availability Labor

CASY STUDY Key Performance Indicators

CASY STUDY 4. Longlist Blue print and strategic window combined List of possible performance indicators 5. Shortlist PIs fromlong list scored on: Effectiveness Correctness Usefulness

CASY STUDY 5. Short list

CASY STUDY 5. Short list

CASE STUDY 6 Implementation proposal Technical design ‘Good’ KPI Functional design What should the information describe? Dashboard

CASE STUDY 7 Control plan Delivery of valid data Processing data into KPIS and dashboard Use of KPIs and dashboards oDescribe for each KPI who is responsible for the delivery of the data oDescribe to whom and on which fixed date the data should be delivered oAppoint one responsible person to collect all the data oAppoint one responsible person to deliver the reports oDescribe to who and on which fixed data the reports have to be delivered

CASE STUDY 7 Control plan

CASE STUDY 8 Monitoring plan Support manager responsible

CONCLUSIONS CFS is unable to measure performance and has insufficient insight Process performance measurement framework is needed to identify, control and monitor KPI’s Framework Vitale Logistiek is chosen based on requirements Step-by-step guidance to identify, control and monitor KPI’s described Case study: By making use of the framework KPI’s are identified Blue print not completed No strategic objectives

CONCLUSIONS The process performance measurement framework gives the CFS: The ability to identify relevant KPI’s based on the requirements A plan to control the usage of the KPI’s A plan to monitor the KPI’s Framework considered as suitable

CONCLUSIONS The identified KPI’s give the CFS: The ability to get insight in the processes The ability to measure the performance of the processes The ability to set the current performance The identified KPI’s give the CFS the ability to start optimizing the processes once these are implemented and functioning

RECOMMENDATIONS Complete framework 1 Complete blue print Data structure Financial structure 2 Eliminate bottlenecks Implementation 3 Implement KPIs from shortlist 4 Develop a dashboard 5 Test KPIs 6 Measure current performance 7 Define specific strategic objectives 8 Set targets for the KPIs 9 Use monitoring plan

RECOMMENDATIONS Anchorage KPIs 10 Use control plan 11 Training KPIs General Users Management Administrator 12 KPI Awareness 13 Automation data entry

MOTIVATION Goal TPS: Make CFS into a profitable department by operating more efficient Goal TPS: Enhance service excellence and reliability to improve competitive position Optimize processes in the CFS Implement and use the identified KPIs

RECOMMENDATIONS 15 Use framework to identify KPIs for new processes 16 Use framework to assess changes in strategy Use framework to adjust or identify new KPI when necessary 17 Use framework to identify KPI for new goals, objectives or critical success factors 18 Use framework to identify KPIs for processes outside CFS

REFLECTION Roadmap to achieve research objective Deliverables Current situation Interviews and desk research Focus on strategy Requirement framework Framework Requirements Based on operational processes Vitale Logistiek suitable Combination frameworks Adjusting framework – process description

REFLECTION Vitale logistiek Blue print Observing and interviews Business process superintendent Bottlenecks Outsourcing Strategic window Critical success factors Interviews board  strategic objectives Short list Assessment Usefulness Effective and correct but not useful Not effective and/or incorrect but useful

REFLECTION Implementation proposal Abstract  PMRS Control plan Report template Appoint responsible persons Monitoring Roadmap Scenario

‘You can’t manage what you can’t measure’ - William Edwards Deming