UDOT Approved Products List UDOT Approved Products.

Slides:



Advertisements
Similar presentations
We have developed CV easy management (CVem) a fast and effective fully automated software solution for effective and rapid management of all personnel.
Advertisements

Software for Engineers EG1003: Introduction to Engineering and Design.
County Names Beaver Box Elder Cache Carbon Daggett Davis Duchesne Emery Garfield Grand Iron Juab Kane Millard Morgan Piute Rich Salt Lake San Juan Sanpete.
REDUCING BURDEN WHILE INCREASING QUALITY AT A GOVERNMENT AGENCY David A. Marker (Westat), Mary K. Dingwall (Westat), and Marla D. Smith (U.S. EPA) Presented.
Past, Present, Future. MIOSHA – Asbestos Program Accreditation, Contractors, Training Providers Presented by Kimberly Weaver, Recordkeeping/Licensing/Accreditation.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
GEtServices Contingent Staff Training For Suppliers Blanket Order.
How to Create a Within Fund Budget Transfer Within FAST.
Map the current process
19 th Annual Audit Division Conference October 7-8, 2010 Orlando, Florida Developing a Checklist Robert Orkin Project QA/QC Manager Parsons Brinckerhoff.
CORRESPONDENCE This module is to be used in assisting associate staff members with guidelines to follow when preparing correspondence.
Petty Cash Custodian Workshop Research and Department Petty Cash Funds—from creation to close-out. A user’s guide. Controller’s Office.
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
Preparing for Title IIA Monitoring Review (FY14) February 24, 2015 Office of Educator Effectiveness Aviva Baff Isadora Choute Cynthia Mompoint Deborah.
Section 7: Completing the Hiring Proposal This section includes instructions on how to complete the Hiring Proposal.
Cochran Law Offices, LLC Patent Procedures Presented by William W. Cochran.
GRADUATION RATE Timelines and Business Rules for High School Graduation Calculations.
Sponsored Projects Office 1 U.S. DEPARTMENT OF HOMELAND SECURITY PROPOSALS WHITE PAPERS & FULL PROPOSALS SUBMISSIONS Nancy Saxer, Contracts Officer Wednesday,
INFORMATIONAL MEETING – Surface coating operations.
ESPON 2013 Programme Info Day on Calls and Partner Café Brussels, 10 May 2012 How to apply: Application Form and Eligibility A Decade of Territorial.
1 Troy McCollister, Asst. Deputy Director Bill Bone, Capital Program Administrator DODD Community Capital Program Biennium
© CoreNet Global. All rights reserved. Knowledge Center Online Tutorial Michael Anderson CoreNet Global.
GEtServices Contingent Staff Training For Suppliers.
Crystal Mountain Club Association Architectural Committee
New Registration This document takes you through the process of new registrations for the University’s online systems. A new registration is defined as.
 Overview of the Five-Year Online Strategic Plan  Accessing and developing the plan  Budget  Allowable costs  Assurances  Compliances  Practice.
East Carolina University Department of Human Resources.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
EWiSACWIS Providers PAW-TAW November Provider Changes – Part I Ability to close provider records –Provider records are no longer active and inactive.
March Utah Storm Water Advisory Committee.
State Employee Charitable Campaign Affiliate Agencies.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
Tylon Chaney Supply Management-General Procurement.
FRYSC Advisory Councils Partners in Progress
New Student Orientation Spring Three Semester Program - CES -You will get your registration info next week through Classrooms should be assigned.
Supplemental Pay Recommend for Hire Overview – A personnel requisition is used for supplemental pay vacancies when a staff member is placed in a coach.
Food $ense and EFNEP Training Evaluation of a novel, low cost, low burden, scalable technology for evaluating EFNEP and SNAP-Ed effectiveness Regional.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Fluoride Regulation Updates Updates on changes in Davis and Salt Lake Counties.
DoD Qualification Automation Update 2006 DoD Standardization Conference May 25, 2006 Briefer: Donna McMurry, DSPO.
What is ? It assists states with their coordinated evaluations on a wide array of It is a national evaluation and auditing program for manufactured products.
W&M Office of Procurement Effective February 1, 2016.
Publications Coordinators – Create and Verify a Publication.
Planning Personnel Department May 29, 2003 John UptonNicole Bennett.
PEP TRAINING: SCIQUEST INSIGHTS AND BASICS MARCH 17, 2016.
Internship at The Dennis Group LLC Kristin Walsh ’08 Architectural Studies Integrative Project.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Chemwatch FFX Gold General Wet Lab User Guide. Chemwatch is an online chemical management system database The Chemwatch database allows the user to develop.
Training Module 5: Budget Modifications Connecticut Advanced Manufacturing Initiative (CAMI) October 12, 2015 Meg Niewinski, Finance Officer Meg Niewinski.
Cayuse Link: Login username and password are your Bronco Credentials (Blackboard and Bronco Direct.
E-JPPAP User Guide _ Supplier
Create a PO-Based Invoice
Naviance Family Connections
Instructional Guide on Licensure Advancement
<NPI/Engineering Change/Phase Out>
Global iShare Database AT ACH Manual for Sales Force
Staff Training Travel Authorization electronic approvals
How to Update your Banking Information for AT&T to remit Payment
WHAT YOU NEED TO KNOW ABOUT FINANCIAL ASSURANCE
Are there different kinds of mixtures? What are they?
Records Retention.
Pioneer Overland Trails
ADRC IM Work Group Overview
Approving Teacher Created Artifacts
HERE IBC Protocol RENEWAL Last 4 MMDD
DPMS Ticket & Permission Management
Using AIM (for Instructors)
HERE IBC Protocol RENEWAL
Presentation transcript:

UDOT Approved Products List UDOT Approved Products

APL Contact Personnel Bin Shi Materials Implementation Engineer Tim Wozab Approved Products Coordinator Please send all submittals to - 2

Why Have an Approved Products List The main purpose of the APL is to assist construction projects by minimizing the repetitive paperwork process This would also make available a list of products meeting UDOT standard specifications for use department wide as applicable 3

4 How to Get Started (Form R-52)

5 Form R-52 Cont. (Buy America)

6 Percent of Buy America Products on the APL

This requirement went into effect on January 1, 2015: Counties within Utah that are affected by the Admin Code are as follows Box Elder, Cache, Davis, Salt Lake, Tooele, Utah, and Weber Counties UT Admin Code R , Architectural Coatings 7 Admin. Code R (VOC Requirements)

Sell-through of coatings Pg. 9/13 How to meet VOC requirements 1. Accredited lab testing results 8 (VOC Requirements) Cont.

2. "Formulation data" as shown on the MSDS Could also be a way of reporting the VOC content Pg. 6/13 how to calculate VOC R (2a) Determine VOC Content Pg. 11/13 Those products applicable to R that meet the VOC requirements will be placed on the APL 9 (VOC Requirements) Cont.

10 Last Page on the R-52 form

11 (APP) APP meetings are held quarterly Panel members review the manufacturers submitted documentation for the applicable specification under which the product was submitted Approved Products Panel

12 R-52 Form Coordinator Review Added Documentation APEP Member Assigned Review Process Time Submittal Flow Chart

13 APEP Member Recommendations NotificationsLimitations If AnyAcceptance Letter Product Placed on APL Submittal Flow Chart Cont.

The renewal process is the same process as the original product submittal Fill out the R-52 form and attach current independent lab testing results, along with the manufacturers data sheets Submit all documentation to the APL Coordinator 14 What Happens After Four Years

Ease of paper work load for the construction office and maintenance personnel Contractor and suppliers paper work load from project to project has been decreased also A reliable product database as a resource for the Project Engineer’s, Contractor’s and Shed Foreman 15 Again the Benefits of Having the APL