Adam Karges Leader Alicia Martin Recorder Britta O’Keeffe Project Engineer Chris BattistiProject Engineer Steve Boyd Project Engineer 2011 NASA Great Moonbuggy.

Slides:



Advertisements
Similar presentations
Formula 1 Group Members: Quinn Collett Steve Godlewski Tobiah Halter Jeff Swanson Academic Advisor: Dr. Chien Wern June 4, 2003.
Advertisements

The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.
Intake & Exhaust Team James Hogge Rebekah McNally Alisa Phillips Henos Woldegiorgis Upright Team Lloyd Outten Joseph Perry Josh Carroll Taylor Watkins.
Bob cat Skid steer loader
Team UDFSAE: Suspension Group
P09221: Innovative Composite Parts for a Formula SAE Racecar Team Members: David Holland Theodore Kusnierz Anthony Salvo Ryan Baldi Charles Thomas Martin.
Rider Education Division Trailering Seminar. The Trailering Seminar should provide: Education and Information A better understanding of potential problems.
Chris McHugh Randy Fulcher
Rolling Chassis Team Todd Anderson Matt Blackwood David Hovater Josh Smith Jessica Yoho.
Parallel Parking Identify 1½ Car Lengths of Available Space
Team: Clyde Baker Ken Brown Alex Cherukara Kevin Eady Sponsor: Dr. Patrick Hollis SAE 1: Mini-Baja Four Wheel Steering.
Suspension Design Case Study
M.E. 462 Capstone Design I.U.P.U.I. Spring 2007 Bishop Steering: 1970 Lotus Europa Front Axle Re-design Aaron Emmons Phil Palmer Brad Holtsclaw Adam Spindler.
AMPHIBIOUS VEHICLE. The Team The Project Overview The Design & Prototype The Testing The Conclusion The Acknowledgements.
Starting, Moving, and Stopping the Vehicle
ME 303 PRINCIPLES OF CAE ASST.PROF.DR.HASAN HACIŞEVKİ.
Drive Train Ryan Barba Patrick Hickey Andrew Hill.
Solar Opposers Moon Buggy 2 Final Presentation Advisory Committee April 27, 2007 Presenters: Donna Durkee Jeremy Apt Charlie Tullis Craig Scholes Piyush.
Ashley Wyatt Xavier Thompson Matt Galles Bobby Costen Chris McHugh Randy Fulcher ODU FSAE Car.
SofaKing: The Lazy-Man Futon Chris Wooldridge Loren Hankla Ankur Desai JT Stukes Barrett Evans John Pendley.
Human Powered Tadpole Trike Team Members Cory Tuttle (PM) Daniel Unes Jarod Peyton Cory Schueller Dylan Polus Faculty Advisor Dr. Marek Szary S13-45-TRKE.
NASA Human Exploration Rover Challenge
Front Suspension Greg Habiak, Nicole Simon, Joe Vuto.
What Classes of Lever Do You See?
NASA moon buggy project
Design of a Robotic Manipulator for a Wheelchair Gateway Coalition Ohio State University Sinclair Community College Wright State University December.
Basic Utility Vehicle (BUV) ME 462 Capstone Design Presentation Department of Mechanical Engineering, IUPUI December 14, 2005 Presented by: Tom Peters.
Modern Automotive Technology PowerPoint for by Russell Krick
Parts of A Vehicle In this presentation you will learn the standard names of the different parts that make up a wheeled vehicle.
Suspension System Fundamentals.
Unit 4: Mechanical Systems. Topic 2: The Wheel and Axle, Gears, and Pulleys.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
CoG and Speeding Building SPEED July 28, July-2011 Center of Gravity The Center of Gravity is the point where the object/figure balances Geometry.
1 Alpha 6.5: The Great Moonbuggy Race 2006 Russell Alberts Scott Coll Haison Nguyen Jason Zaloudek Sponsored by: CBU Department of Mechanical Engineering.
Specifications for JOOLZ 409- based on the current prototype (as taken by AOK)
2011 Human Powered Vehicle Challenge 'Mjolnir' Team Members: Tad Bamford Ben Higgins Chris Schultz Aaron Stanton Neal Pang.
ME 462 Senior Design Project Design of a moonbuggy for the NASA Great Moonbuggy Race Faculty Advisor: Dr. Ramana Pidaparti Marques Franklin.
ME 489 Formal Design Review September 22nd, 2004 Garrett Davis Matt Moody Arnar Thors.
Engineering/Failure Analysis
The Journey to a West Coast Drivetrain
Adrian Garza.  Composites of structural fibers like carbon are used for the frame  Wheels, derailleurs, brakes, and chains, are made with stainless.
NASA’s MOONBUGGY STUDENT COMPETITION On the Grounds of the U.S. Space & Rocket Center Huntsville, Alabama April 8, 2000 Participated by the Senior Design.
Garage Door Design Analysis
BRAKES.
Engineering Analysis October 23, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
North Dakota Space Grant Presentation Group Members: Oliver Boeckel Jacob Hanson Paul Johnson Lance Krogh Lindsey Feyder May 5, 2014 NDSU NASA Rover Challenge.
© Goodheart-Willcox Co., Inc. Wheels and Tires Unit.
NASA Great Moonbuggy Race 2012 SpacePokes Design Lesley Young Leader Davis FayRecorder Alisa FrohbieterProject Engineer Ryan WilliamsProject Engineer.
WyoBaja 2011 SAE Mini Baja Competition Team Leader Suspension Frame
Blocking a b c d.
LAUNCH X improvements. LAUNCH ©Auto Testing Division Content Sensor headProgrammeTarget dataClampsCabinetTurn table, Side slip.
Eric McDonald Drew Krutak Jeremy Hanneman. Our objective was to design and fabricate a High-Speed Treadmill that is capable of measuring the horizontal.
HUMAN POWERED TRACTOR Team Members: Ethan Harris: Team Leader/Design Engineer Matthew Burtis: Team Reporter/Design Engineer Brandon Roberts: Design Engineer.
Suspension Cody Dykman Jesse Ramer Jesson Salyards Frame Warren Starbuck Brett Schuler Doug Romoth Drive Train Josh Voorhees Corey Saner Spencer Garland.
SAE Baja - Front Suspension Team
Roman Battisti Anthony Garcia Lori Sandberg Liz VanHoosen.
Fundamentals of Steering Systems ME5670
Reach SL(Super Light) Owner manual
Clutch Fundamentals.
Society of Women Engineers Moonbuggy Project Competition Information
End of Line “Pass Through” Conveyor
Human-Powered Transportation
BRAKES.
ISR - MOONBUGGY Advisory Committee Review BRHS/CS MONROE
Transmission system of Automobile
SAE Baja Senior Design Project
Angel Hambrecht, Justin Kibler, Nate Watts, and Maxine Laroche
Geneva Baja SAE Project Progress Report
Moonbuggy ME Capstone Design Project SP 2006
Suspension Systems - 2 Topics covered in this presentation:
Presentation transcript:

Adam Karges Leader Alicia Martin Recorder Britta O’Keeffe Project Engineer Chris BattistiProject Engineer Steve Boyd Project Engineer 2011 NASA Great Moonbuggy

 Background Information  Design Specifications  Final Design  Economic Analysis  Competition Results  Recommendations Team Photo at the Competition

 NASA competition  18 th Annual Great Moonbuggy Race  U.S. Space & Rocket Center in Huntsville, Alabama  Competition for secondary and higher education institutions  Design, build and race a human powered vehicle

 Human powered  2 person co-ed team  Maximum collapsed dimensions of a 4 foot cube  Maximum assembled width of 4 feet  Minimum rider clearance of 15 inches from the ground  Moonbuggy lifted and carried by the riders 20 feet  Safety  Seatbelts  Safety Gear  Chain clearance

 Weight goal: 120 pounds  Assembly from collapsed position without additional tools  Assembly time goal: 5 seconds  Course Time: 3 minutes  Top Speed: 20 mph  Stopping Distance: 27 feet at 16 mph

 Steering  Hinge  Transmission  Frame  Crank Arm Support  Axle  Wheels  Brakes The Moonbuggy Garage in Huntsville

Design  Predictable  Straight tracking  Corner exiting  Articulated steering  Two control levers  Hinge pin ten degrees past vertical  Adjustable turning radius and sensitivity Outcome  Straight tracking  Difficult corner exiting  Short steering levers  Adjusted to rider feel  14.5 foot turning radius

Top View Side View Input Lever Connecting Rod Hinge Point To other half

Design  Light weight  3.5 pounds  Minimal deflection  inches  Allow for fast assembly  Minimum assembly time: 7.5 seconds  Made of three ¼ inch 4130 Chromoly Steel plates Outcome  6 pounds lighter than the 2010 design  No measured deflection  No failure or yielding

Swivel (rear frame attachment) To articulation hinge (front frame attachment) Spring loaded bolt

/truvativ-hammerschmidt-am-crankset Design  High chain security  Truvativ HammerSchmidt coupled with Single Speed Freewheel Hub Outcome  Top speed of 16.5 mph  Missed design goal of 20 mph  Unreasonable pedaling force needed for required gearing  Saved 6 pounds over 2010 transmission  Achieved high chain security HammerSchmidt AM Crankset Single Speed Hub

Design  Strong yet lightweight  Chromoly 4130 tubing  1.26 Factor of Safety  High stiffness  Immeasurable Deflection  Swivel  Reused previous swivel design Outcome  Total weight: 19.3 pounds  Frame Deflection: Immeasurable  No failure or yielding

Design  Adjustable  Adjustable pedal angle  Adjustable telescoping length  Material: 4130 Chromoly Steel Tubing  Connects to frame via 5/16” grade 5 bolts Outcome  No failure or yielding  Weight Reduction: 2 pounds  Adjustability  Cable failure Crank Arm Support Telescoping Crank Set Tubing Insert Mount to Frame

Design  Weight Reduction Outcome  Use of the DE Goodman Criteria determined a necessary axle diameter of 1 inch  Original axle reused Differential mounted here. D=1 inch d=.75 inches Diameter (in)FOS Mass of Axle (lbs) Fatigue Life (Cycles) x Stepped Axle Design

Wheel Hubs Design  Designed to withstand high lateral loads  Brass Nipples  Custom machined 6061 T6 AL hubs  Sun Ringle Double Track rims Outcome  Manufacturing Error  Aluminum nipples installed opposed to specified Brass nipples leading to wheel failure in Day 1 run  Wheel was rebuilt with brass nipples, and did not fail in Day 2 run

Design  Stopping Distance: 27 feet at 16 mph  Calipers mechanically activated:  Avid mechanical disk brakes  Rotor radius: 3.64 inches  Front Rider Control  Splitter beneath front rider’s seat Outcome  Stopping distance: 37 feet at 16 mph  Missed design goal due to mechanical losses in the splitter Brake Rotor Brake Cable Splitter

EXPENSEQTYTOTAL COST Student Engineering (varying rate) hours$43, Engineering Shop ($60/hr) 103 hours$6,180 Purchased Materials-$1, Competition (Travel)-$3, TOTAL COST-$53, Production Cost/Unit1$2,500 Retail Price1$3,750

Non Technical Considerations  Aesthetics  New Seat Covers  Painted white  Gold brake and shift housing  Updated fenders  Safety  New helmets were purchased  No sharp edges

Pre Race Tasks:  Volume Requirement - 4 foot cube  Weight Requirement  Carried 20 feet by the riders  Final weight -146 lbs  Timed assembly – 10.5 seconds  Goal assembly time – 5 seconds

Day One:  Front half roll-over  Front Right Wheel Nipple Failure  No serious injuries! Source: Moonbuggy Race Facebook Page Before the Crash Front Roll-Over

Day Two:  Successful cornering in day one problem-area  In-air instability  Crank arm cable failure  Completed race time: 6:58  18 th place Day One Crash Location

Problems  Not enough practice time  Poor terrain simulations Solutions  Early approval for construction  Communicate with past teams  Replicate race obstacles Back Alley Practice

Problem  In Air Instability Solutions  Reverse hinge angle  Lengthen steering levers

Problem  Unlimited rotation  Solution  Limit rotation using springs or stops

Design Summary  Design Positives  Gearing  Optimal Low and High Gearing for Course Terrain  Adjustable Crank Arm  5 inches of Length Adjustability  Weight Reduction  22 pounds Lighter than 2010 Moonbuggy  Hinge  6 pounds Lighter than 2010 Moonbuggy  No Yielding or Failure  Tire Choice  Low Rolling Resistance and High Volume  Frame  No Yielding or Failure

 Wyoming NASA Space Grant Consortium  Dr. Dennis Coon  College of Engineering shop personnel  Mr. Scott Morton  Dr. Matt Bundle

Questions?