1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.

Slides:



Advertisements
Similar presentations
Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
Advertisements

MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/18/2008 Don Lynch.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
9/6/20121 PHENIX WEEKLY PLANNING 9/6/2012 Don Lynch.
1 9/3/2009 PHENIX WEEKLY PLANNING 9/3/2009 Don Lynch.
Technical Support /13/08 PHENIX WEEKLY PLANNING 11/13/2008 Don Lynch.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
3/29/20121 PHENIX WEEKLY PLANNING 3/29/2012 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 8/27/2009 PHENIX WEEKLY PLANNING 8/27/2009 Don Lynch.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 11/19/2009 PHENIX WEEKLY PLANNING 11/19/2009 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Radiation Laboratory Meeting
Maki KUROSAWA VTX Group 2014 Feb 20
Presentation transcript:

1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa

2 North IR this week Restore OASys cameras after scaffold disassembly, night shot. 50 ohms registers installation of calibration pulse, N.St-3,Oct-6&7,Gap-2 ADTX communication check St.2

3 Repair work Calibration Pulse (N.St-3,Oct-6&7,Gap-2) Consistent with other gaps ~ 600 -> OK!

4 North Arm Concerns LocationProblemEffectSolution St3, Oct8, Gap2 Deformed calibration pulse Time smearing test Negligible effect on gain St3, Oct6&7, Gap2 Large calibration pulse Timing different, ADC saturation Add 50 ohm registers  St3, Oct4&5 Deformed calibration pulse Time smearing test Negligible effect on gain St-3, Oct-1Noise > 5ResolutionHigher HV?

5 South IR this week Completed South power/GTM infrastructures Cathode cables, ADTX-FEE install Noise & Performance tests (HV on/off) Noise hunting after decap. Work OASys illuminator repair Inconsistent cathode cabling btwn octants Improved ground connections (Jimmy) Station-1 Scaffold Disassembly (carpenters)

6 Inconsistent Cabling Updated DB for Octant-6, station-3 [11/30/08 17:06]. North arm –station 3, octnat5, half octant 0, cathodes 0 and 2, strip#226~240  Updated DB, OK –station 1,octant0, half octant 0, gap 2, cathodes 0 and 2.  To be confirmed soon. South arm –station 3, octant 2, half octant 1, gap 1, cathode 0 and cathode 2 (counting from 0); –station 1, octant 0, half octant 0, gap 0, cathodes 0 and 2.  Consistent with Actual Cabling. OK

7 South Station-3 Noise Status Under Investigation

8 South Station-2 Noise Status ADTX Installed Under InvestigationUnder Investigation

9 South Station-1 Noise Status ADTX Installed Noise Increase after Decap

10 South, St-1, Oct-2 Strip#1~32 -> Chasis-1

11 Noise Hunting (South St-1,Oct-3) Disconnected HV cable from Gap-1

12 Noise Hunting (South, St-1, Oct-3) HV on (red) vs. HV off (black)

13 December Schedule Platform Done Plumming Power SMT4 Install South Cabling Optical chain test OASys Maintenance Board Test Noise Check Fake Hit, Calibration South Station-1 Scaffold Activity MuTRG MuTR decapacitation Absorber Install MuTR Decap. South St.1 Scaffold Disassembly North Station-1 Access & Lampshade Close Tsutomu, Itaru -> Japan ADTX-FEE Cable install St1 Cable to Rack Rack Control OASys MaintenanceNorth Scaffold Disassembly Board install LV test Board install LV test, ADTX Cable Install St-2, St-3 Board Test Noise Check Fake Hit, Calibration Noise hunt Lampshade Close -> January?

14 To be done for Station-1 East West Thermocoupe not working Noisy Signal Cable Chassis-1, Cable-4 Lost communication w/ boards Reduce elevation of chassis Noisy Signal Cable Chassis-5, Cable-8 Noisy Signal Cable Chassis-1, Cable-8,16 Man Lift Noisy Signal Cable Chassis-1, Cable-6 Fix ID bit Chs-2, B2 D3->23

15 Remaining IR North Station-1 Access (before Friday) Fix 6 dead trunk cables  Dec.29 OASys –(Temporary) remove bottom platform and stairs for Oct.6-8, possible alignment –Replace camera#41 by spare –Play with light source alignment in St-1, North? –Long data taking with lights off ADTX check, North Station-3 Noise reduction St-2&3, South South final check list, e.g. visible check, firm connections, etc.

16 Backup Slide

17 Collapsed Calibration Pulse in Station-3, Octant-8

18 Man Power

19 January Schedule PHENIX Closing EC rolls in Central Magnet in Run position