Development Status of Periodic Verification Program for Safety-Related Motor-Operated Valves Shin-Cheul Kang, Sung-Keun Park, Do-Hwan Lee Korea Electric.

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

Progress on Risk Assessment......continued Ms. Albana Gjinopulli, MPA Mr. Stanislav Buchkov.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
ISTOG MOV TESTING TRANSITION Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to develop implementation guidance for ASME Code Case.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
1 Software Testing and Quality Assurance Lecture 1 Software Verification & Validation.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Research Activities of HFCV Rule-making in Korea Sept. 24 ~ 26, th HFCV-SGS Meeting Ministry of Land, Transport and Maritime Affairs, Korea Transportation.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs.
Veterans in Business – Still Serving America Verification Assistance Program Part One Preparing for Verification.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Maintenance Optimisation At Rovno NPP Robert Hudson.
Looking At Your Assessment System: A Graphical Perspective Michigan Educational Research Association Fall Conference 2012 Monday, November 19, 2012.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Supervising and Regulating the Use of Credit Repository Data Raphael W. Bostic Federal Reserve Board June 18, 2001.
NIST Special Publication Revision 1
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Development of Cyber ALARA Program 2012 ISOE Asian ALARA Symposium Choi, Hoon Radiation Health Research Institute Korea Hydro-Nuclear Power Company.
Korea Rail Network Authority, Republic of Korea. Contents Introduction Organizations - KRNA Overview of KOREA’s High Speed Rail development Background.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Patterns of Event Causality Suggest More Effective Corrective Actions Abstract: The Occurrence Reporting and Processing System (ORPS) has used a consistent.
Software Testing. What is Testing? The process consisting of all life cycle activities, both static and dynamic, concerned with planning, preparation.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Quality Evaluation methodologies for e-Learning systems (in the frame of the EC Project UNITE) Tatiana Rikure Researcher, Riga Technical University (RTU),
Operating Experience Feedback Process in Korea May 30, 2006 Korea Institute of Nuclear Safety – focusing on closing the feedback loop - Kim, MinChull Operational.
1 Commonwealth Project Management Division Bob Haugh Project Management Division November 15, 2010 Revision of.
Managing Rotorcraft Safety During Frequently Performed Unique Missions September 28, 2005 AHS International Helicopter Safety Symposium 2005 Philip G.
MODES-650 Advanced System Simulation Presented by Olgun Karademirci VERIFICATION AND VALIDATION OF SIMULATION MODELS.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
ISTOG INDUSTRY ISSUES Interactive Session Gregg Joss (Ginna Station Vice Chair ISTOG) Ron Lippy (True North Consulting ISTOG Facilitator)
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
Albany Bank Corporation Security Incident Management Program.
AOV Software ACE Fundamentals QUIKLOOK Users' Group 2011 Annual Meeting August 18-19,2011 Tabor Academy Marion, MA.
6/11/04Part 11 Public Meeting1 Risk-Based Approach Scott M Revolinski Washington Safety Management Solutions Carolyn Apperson-Hansen Cleveland Clinic Foundation.
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
Short overview of the legal framework of protected sites and status of existing ecological networks in Serbia.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
I. UML Tool review (Rhapsody) and II. Requirement and TEST in UML modeling May 31th 2005 KIM, YUN GOO Lab Seminar.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
What is a software? Computer Software, or just Software, is the collection of computer programs and related data that provide the instructions telling.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
ISO Session 3 Environmental Management and Ethics in Management.
Human Performance Enhancement System Park Young Ho Dept. of Nuclear & Quantum Engineering Korea Advanced Institute of Science and Technology December 23.
SQA project process standards IEEE software engineering standards
Status and Prospect of Korean Korea Electric Power Research Institute
Electricity & Regulatory Overview of Korea
Wind Composite Services Group/WindCom
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
SQA project process standards IEEE software engineering standards
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
Developing Information Systems
Flooding Walkdown Guidance
Yihan Xu and Chang-Soo Kim
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
How to conduct Effective Stage-1 Audit
doc.: IEEE <doc#>
Test Process “V” Diagram
doc.: IEEE <doc#>
Presentation transcript:

Development Status of Periodic Verification Program for Safety-Related Motor-Operated Valves Shin-Cheul Kang, Sung-Keun Park, Do-Hwan Lee Korea Electric Power Research Institute Korea Electric Power Corporation

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 2 Contents oIntroduction oDevelopment status of PV program oConcluding Remarks

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 3 Introduction oStatus of regulatory recommendation for MOV JOG : Joint Owners’ Group KHNP : Korea Hydro & Nuclear Power Company MOST : Ministry of Science & Technology U.S 1989: GL89-10 (U.S NRC) 1996: GL96-05 (U.S NRC) Korea 1997: Recommendation (MOST) To be issued To evaluate operability To evaluate operability periodically JOG PV program KHNP & KEPRI

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 4 Introduction (Cont’d) oNecessity of PV  Continuous degradations with time oDegradation Mechanism Actuator Valve Motor Stem/stem nut Disk seating surface Disk Guide Rail Disk slot Guide contact surface Decrease of Operability Actuator capability Requirement force

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 5 Concluding Remarks Introduction (Cont’d) oRelationship between degradation and operability * PV : Periodic Verification acceptance criteria Test interval Present Operability Time Expected Operability Interim PV program PV

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 6 Development status of PV program oFinal objective of PV program Static test Dynamic test - Impractical to some MOVs - Good for observation of actuator & valve degradations - Available to all MOVs - Good for observation of actuator degradation For test practicability, Static test is selected as PV method

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 7 Development status of PV program (Cont’d) oDevelopment steps of PV program Implementation of PV Step 2: Dynamic testing program (during 5 years) Step 3 : Final program Step 1: Interim static testing program

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 8 Development status of PV program(Cont’d) oInterim static testing program  Purpose  To provide interim PV implementation basis  To evaluate degradation of actuators  Populations  1775 MOVs at 18 Units  Main interim PV implementation basis  Test method : Static test At-the-valve test MCC(Motor Control Center) test  Margin evaluation method At-the-valve test : Same with current method MCC test : Newly developed method  Basis to determine test frequency Operational Margin criteria Safety significance categories

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 9 Development status of PV program(Cont’d) oInterim static testing program(Cont’d)  Test frequency * Categorization of safety significance by PSA(Probabilistic Safety Assessment), etc. Safety Significance category* Operational Margin Low(>5%) Operational Margin Medium(5~10%) Operational Margin High(>=10%) High123 Medium233 Low333 Static test frequency(refueling cycle) At-the-valve testMCC test Operational Margin High(>=25%) 2 3 3

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 10 Development status of PV program(Cont’d) oInterim static testing program  Procedures  Periodic verification implementation(PV-01, Rev. 0) Diagnostic method based on MCC and At-the Valve test results Operational margin determination method for each stroke and test Stem lubricant injection steps Determination method of test frequency As-found condition monitoring methods  Evaluation of periodic verification results(PV-03, Rev.0) Evaluation methods of operational margin and test frequency  Computational software development for procedures  MOVIDIK  MOVIDIK is web-based software for MOV performance evaluation developed KEPRI and stands for MOV Integrated Database Information of KHNP & KEPRI

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 11 Development status of PV program(Cont’d) oDynamic testing program  Purpose * Valve degradation Force requirement Margin Actuator capability - Force Requirement Force Requirement Margin(%) =* 100 Prediction of degradation during valve lifetime

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 12 Development status of PV program(Cont’d) oDynamic testing program(Cont’d) Dynamic testing Selection of representative MOVs - Service conditions - Design characteristics - Service conditions - Design characteristics

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 13 Development status of PV program(Cont’d) oDynamic testing program(Cont’d)  Major selection process for representative MOVs Step 1. Analysis of degradation mechanism of valves Step 2. Study of design characteristics & service conditions potentially affecting the degradation Step 3. Examination of design characteristics & service conditions of 1775 MOVs Step 4. Grouping of representative valves : To be selected one valve per group(ongoing) Step 4. Grouping of representative valves : To be selected one valve per group(ongoing)

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 14 Development status of PV program(Cont’d) oDynamic testing program(Cont’d)  Grouping results  DT Methodology  At-the-Valve test  Test 3 times for 5 years  Test interval : at least 1 year  Procedure  Standard dynamic test specification(PV-02, Rev. 0)  Computational software development for procedure  MOVIDIK  MOVIDIK program 999 gate valves 447 butterfly valves 336 globe valves 48 Groups 21 Groups N/A(No balanced disk valves)

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 15 Final Program Development status of PV program(Cont’d) oFinal program Interim ST Program Degradation rate of actuators DT Program Degradation rate of valves Final PV implementation basis - Margin evaluation method - Basis to determine test interval Reevaluation of margin Equation & interim PV interval

KEPCO - KEPRI Korea Electric Power Company - Korea Electric Power Research Institute 16 Completed Ongoing and planned Concluding remarks Implementation methodology development of Interim static testing program Implementation methodology development of Dynamic testing program o Implementation plan preparation o Discussion with KINS on the detailed implementation method o Submittal of the plan to MOST o Selection of valves to be tested dynamically based on the validation analysis of JOG PV program results