DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

1 Group 1 Meeting, Catania, Sept,16, 2002 STATUS REPORT ON DAFNE P. Raimondi for the DAFNE team.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Wilson Lab Tour Guide Orientation 11 December 2006 CLASSE 1 Focusing and Bending Wilson Lab Tour Guide Orientation M. Forster Mike Forster 11 December.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
DA  NE Status Report P. Raimondi CSN1 Assisi,2004.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
M. Preger LNF Accelerator Division Frascati Spring School 20/5/2005
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
HERA Status Joachim Keil, DESY (MPY) 59 th Meeting of the Physics Research Committee May 26 th, 2005.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
ILC luminosity optimization in the presence of the detector solenoid and anti-DID Reine Versteegen PhD Student CEA Saclay, Irfu/SACM International Workshop.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
PETRA III, A New High Brilliant Light Source At DESY
DA  NE Status Report P. Raimondi Scientific Committee Nov-2005.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Preliminary Result on L*=1.5m CEPC Interaction Region Yiwei Wang, Dou Wang, Sha Bai Yingshun Zhu, Teng Yue CEPC acc. meeting, 5 September 2014.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
44 th LNF Scientific Committee, Frascati, 4-5 June 2012 DA  NE Status Catia Milardi (on behalf of the DA  NE Team)
Crabbed Waist Scheme at DA  NE M. Zobov for DA  NE Upgrade Team SuperB IV, November 2006 Monte Porzio Catone - Italy.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
WP11 – ANAC Report on First Semester
Riunione CSN1 del 29 settembre - 3 ottobre 2014, Catania
(on behalf of the DAFNE team)
Accelerator R&D for the Super-B Factory
Large Booster and Collider Ring
Yingshun Zhu Accelerator Center, Magnet Group
Superconductivity in the BEPCII Performance
The PEP-II Interaction e+e- Factories Workshop
Introduction to particle accelerators
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
The design of interaction region
Accelerator R&D Results from the B-factory
CLIC damping rings working plan towards the CDR
Summary of Washington DOE Review
Super-B Accelerator Overview
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Proposal for a CESR Damping Ring Test Facility
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Electron Collider Ring Magnets Preliminary Summary
IR Beam Transport Status
Status of IR / Nonlinear Dynamics Studies
Presentation transcript:

DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010

Outline Short recall of modifications to the collider for operation with KLOE Cryogenics history Beam commissioning without and with KLOE superconducting magnet Perspectives for the next KLOE run Initiatives to be overtaken for operation of Siddharta on IR2

Modifications to the Main Rings after Siddharta (already described at the last Committee) KLOE detector rolled in on IR1 new interaction region vacuum chamber to follow the vertical displacement of the beam trajectory due to the detector magnetic field orbit correction with new permanent magnet dipoles new additional skew quadrupoles insertion of superconducting solenoid compensators additional shielding near the Interaction Point stripline electrodes for electron cloud clearing improved feedback systems with new kickers

Modifications to the Main Rings after Siddharta (already described at the last Committee) - 2 modified wigglers with shifted poles to improve lattice linearity and beam lifetime and reduce power consumption: the wigglers will be powered at 400A instead of 550A, with ≈35% reduction on their operation cost and same field as at 550A. Moreover, end-poles are new powered in series with the main ones, leading to better reproducibility of the field modified collimators to reduce backgrounds in the detector and ring impedance old bellows removed and replaced by new ones IR2 vacuum chamber refurbished and realigned Beam dump kickers in IR2 RF low level and high power sections modified for better longitudinal stability and less power consumption

Cryogenic system At the time of the last Scientific Committee the KLOE superconducting magnet was cooled and energized up to 1000 A (2300A operation value). Installation of the new cooling lines for the four superconducting compensator solenoids was under way. The whole system of detector and compensator magnets was expected to be operational within two weeks. Unfortunately several problems occurred, which have strongly delayed the commissioning of DA  NE.

Cryogenic system history the first cool-down started on April 20th on May 13th the magnet reached 4.4 K° on June 26th the magnet was partially heated (to ≈80 K°) to install the cooling lines for the compensator solenoids on July 13th the magnet was cold again between July 27th and August 12th there were three fridge-out events (turbine low T, cooling water interruption and compressed air lack) on August 23rd new cool-down started but three days after stopped again due to maintenance of the lab electric power distribution system on August 30th cool-down resumed, but the coil temperature does not go below 15 K° and for the first time an excessive cooling of the screens is observed on September 10th it is decided to warm-up the magnet to 110 K° and clean the coooling lines

Cryogenic system history - 2 cool-down after cleaning is again not successful, and on September 24th WEKA AG and Space Cryomagnetics (ex Oxford) are contacted: an intervention on a valve of the system is suggested and the leakage repaired, but again cool-down is not successful. Steve Harrison (responsible for the Oxford cryogenic project of KLOE) arrives on October 4th and suggests to perform a series of tests at 110 K° and then warm-up the magnet at room temperature and perform additional tests. following a suggestion of WEKA staff, all valve housings of the system are rectified. An O-ring wrongly mounted is found on one of the valves, but it was so since All the lines are carefully cleaned. on October 25th cool-down starts again and on November 14th the magnet is cold again (after the fastest cool- down of his history,16 days) and energized. Two days after also the compensators are operational.

20 Apr - 1° cool down 22 Giu- Installazione Comp 17 Ago- fridge out 10 Set warm up 110 K

DAFNE commissioning To avoid loosing too much time, a solution to store the beams without the KLOE solenoid was found, where the beams do not cross at the IP The lack of focusing from the KLOE solenoid has a strong impact on the ring optics, which had to be deeply modified. A structure without KLOE, but with the compensators has also been designed Horizontal Vertical

First positron stored beam September 15th

First electron stored beam September 24th

110 mA electron beam September 27th limited by beam coupling and beam size growth due to ion trapping

First measurement of the optical functions in the electron ring

220 mA in the positron ring October 4th

First measurement of the optical functions in the positron ring

1.06 A in the positron ring October 9th START of RING CONDITIONING WITH BEAM !!

Ring conditioning with beams without KLOE solenoid 14/10/ /10/2010

Electron bunch length measurement

Electron beam chromaticity measurement

Effect of electron cloud clearing electrodes on growth rate of positron beam instability

Finally, we have KLOE solenoid and compensators ON !! November 16th

Conditioning with electrons November 18th ALL SC MAGNETS ON

Conditioning with positrons November 19th ALL SC MAGNETS ON

Optics optimization with the electron beam

Perspectives for the next KLOE run Conditioning of both rings with high current beams to improve vacuum conditions and minimize beam size growth and backgrounds in KLOE Closed orbit correction and beam functions optimization Horizontal-vertical coupling minimization (already less than 1%) Optimization of beam-beam interaction and luminosity Optimization of beam collimation with the scrapers to minimize background in KLOE also during injection To do list: Start of KLOE data taking foreseen for mid January

Second Siddharta run The Accelerator Division is studying the possibility of inserting the Siddharta experiment on the second interaction region (IR2) Operation in this configuration will be alternative to the KLOE one. However, the KLOE detector and its superconducting solenoid will not be rolled out during operation of Siddharta. Each cycle of data taking for one of the two experiments will last at least 10÷12 months A new layout with low-  insertion and Crab-waist will be realized on IR2. Due to the presence of the low-  insertion in IR1 a luminosity 30÷50% lower than that obtainable with a single low-  insertion is expected

Hardware Due to the necessity to keep KLOE in place during Siddharta operation we need: two QD0 (first quadrupole around the Interaction point common to both beams) permanent magnet quadrupoles four QF1 permanent magnet quadrupoles two new electromagnetic sextupoles for the realization of the Crab-waist configuration Most of the vacuum chamber components of the previous Siddharta interaction region can be reused The overall cost is estimated in 0.5 M€

Time scale 3 months for the technical design 6 months for the construction of the permanent magnet quadrupoles and electromagnetic sextupoles: during this first period (9 months) KLOE will be operational 1 month for the installation of new hardware 2 months for commissioning with beams after the run 1 month is needed to reinstall the present interaction region and start KLOE operation again at the maximum luminosity From the OK to the project we need: