1 SAVANNAH RIVER SITE AIKEN, SC www.SRRemediation.com We do the right thing. SAVANNAH RIVER SITE AIKEN, SC www.SRRemediation.com SAVANNAH RIVER REMEDIATION.

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

Circulating Water System
Projectizing an Operating
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Liquid Waste Organization
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Pulse Drying What is it?. Pulse Drying Pulse drying is a relatively new technique for rapidly drying high moisture/medium solids feed streams into a much.
Utility Savings & Management “Back-to-Basics” Presented by: Clean ‘07 Las Vegas, NV / June 13, 2007.
Optimization For Existing Tilting Pan Filters Metalcraft.
Plumbing John Arent Architectural Energy Corporation © 2005 CHPS.
Driving Toward Energy Efficiency Emerson Process Management Novaspect. Inc. June 22 / 23, 2010 Steam.
Engineer Presentation
"AIR COOLER" Heat Exchanger
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Coop Training : Central Heavy Equipment Department In Aramco King Fahd.
Management training Jumeirah beach residence sector 3 Presented by November 15 th 2006.
Paint Circulation Technology Level 1 - Training Document
Diesel Generator Reliability: Lessons Learned from Storms
Microwave Soil Vapor Treatment CHA Corporation Field DemonstrationWINTER 2004 CHA Corporation 372 W. Lyon Laramie, WY Telephone:(307) Fax:(307)
Defense Waste Processing Facility 257 Actual Canisters Produced in FY05 37% Waste Loading (averaged for FY05) 1,995 Total Canisters Produced (as of the10/31/05.
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
Hydronic Mechanical Controls
Mechanical for Oil Heat
Air Conditioning EPA Type II.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
1 AFPC Norm Decontamination Facility Plant (NDF) 1.Introduction - The passage of produced water through pipe work and plants leads to the built up of Norm.
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
One Project. One Team. One Goal.
World Health Organization
U. S. Department of Energy West Valley Demonstration Project 18096_1 HLW Project Status Bryan Bower, DOE WVDP Denis Koutsandreas, DOE EM HQ Ron Farchmin,
1 Resuming Operations at WIPP Frank Marcinowski Acting Associate Principal Deputy Assistant Secretary for The Office of Environmental.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
TRENTON Casing Filler Presentation
1 Construction of Salt Waste Processing Facility (SWPF) Charting the Course for Major EM Successes in September 29, 2015 Frank.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
1 2001: WTP Construction Began. 2 WTP in 2015 Pretreatment Facility High-Level Waste Facility Low-Activity Waste Facility Analytical Lab.
Phase I Decommissioning Project Update West Valley Demonstration Project Presented by: Bryan Bower, Department of Energy November 14, 2012.
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
Facilities Management and Design Chapter 7 HVAC Systems.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
South Carolina Nuclear Advisory Council SRS Update and FY 2017 Budget Service ● Safety ● Security ● Stewardship ● SRNL ● Sustainability April 14, 2016.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
WATER SYSTEM WORKSHOP February 27, 2012
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Unit 13 Oil-Burning Equipment
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
IT-4189 Supply and installation of a cryogenic distribution system
Green With Briess A sustainability initiative
Low Level Radioactive Waste Forum, Fall 2014 Meeting
Subsea 100 Global Services Products Presentation
Radioactive Waste Processing at the Savannah River Site
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Emergency Electrical Power Supply for Buildings
TRENTON Casing Filler Presentation
Northeast High-Level Radioactive Waste Transportation Task Force
The Improvement of ALARA for the Steam Generator Maintenance
Heating, Ventilation and Air Conditioning HVAC
Mount Vernon Community School
Presentation transcript:

1 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. SAVANNAH RIVER SITE AIKEN, SC SAVANNAH RIVER REMEDIATION UPDATE April 14, 2016 Mark Schmitz Acting President and Project Manager South Carolina Nuclear Advisory Council Meeting

2 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. Safety: Perspective/Awards Construction forces (legacy and current) accumulated over 28 million safe hours SRR operations accumulated over 1 million safe hours since the last injury requiring a day away from work –Reached contract-high 9.8 million safe hours in 2015 Recipient of National and State Awards in recognition of safety performance (National Safety Council Industry Leader, S.C. Chamber of Commerce and S.C. Department of Labor, Licensing and Regulation Awards) Our Focus: Safety Industrial SafetyRadiological Safety Environmental Safety Chemical Safety 2

3 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. High-Hazard Operations ARP/MCU = Actinide Removal Process and Modular Caustic Side Solvent Extraction Unit 4,000 th canister poured 12/31/15 4,000 th canister poured 12/31/ Interim canister storage positions are being modified; scheduled to start double stacking in June 2.6 million gallons of tank space gain (36 million gallon inventory) in FY % radionuclide removal with Next Generation Solvent 86 % construction complete on 30-million gallon capacity Saltstone Disposal Unit 60 % reduction in decontaminated salt solution disposal costs

4 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. Closing Waste Tanks Bulk Waste Removal Bulk Waste Removal Heel Removal Annulus Cleaning Isolation & Final Sampling Grout Tank Grout Tank Cooling Coil Flushing Safe Storage Safe Storage Operationally Closed Tank 12 Grouting 16 Tank 12 so far… Overall grouting 97% complete Items remaining: tanks risers, equipment and cooling coils 908,580 gallons of grout used so far Grouting complete by late April; FFA Deadline: May 31, 2016  Tank Closures Five tank closures completed during the past 6 years; One in progress now

5 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. SRR Technical Issue: 3H Evaporator  3H Evaporator Mission: Evaporating liquids generated during: Sludge batch washing Receipts from H Canyon Tank waste removal and cleaning  Leak discovered on Feb 17, 2016, contained in stainless steel lined cell  System Plan revision supports continued H Canyon, DWPF, and MCU operations for up to 3 years without 3H Evaporator operating  Strategy Currently feeding Sludge Batch 8 to DWPF Sludge Batch 9 has already been washed Sludge Batch 10 washing was to have begun in March 2017, will be deferred Insertion of a Sludge Batch 9B (Tank 22 does not require washing) Decrease canister loading from 36 wt% to 32 wt% (ensures no “salt only” processing at end of campaign)  Estimate for evaporator replacement is 3 years and ~$18M  Recovery Teams evaluating repair vs. replacement 5

6 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. SRR Technical Issue: SDU 6  Leak Repairs 30 million gallon construction Unable to pass water-tightness test with dye Install a liner Retest tank Under budget On track to meet system plan need date

7 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. Infrastructure Improvements Mercury Scoping Slurry Mix Evaporator (SME) Bubbler improvement Coils Inspect/Clean Sludge Receipt and Adjustment Tank (SRAT)/SME Blowdown Auto Melter Off-gas restoration Lab Motor Control Center separation New Laboratory trailer New Instrument air dryers New cooling tower pumps Obsolete acid pumps replacement Smear Test Station Exit Pedestal Refurbishment Vault 4 cap & roof coating Basin 4 expansion SDU fill height increase Saltstone Disposal Unit (SDU) 6 construction Salt Solution Receipt Tanks construction Weigh hopper weather protection Wireless infrastructure installation at Saltstone Delta V control system upgrade Replaced 4 obsolete fire system monitoring panels Lab flooring FOS 7 and FOS 18 HVAC units Replace obsolete Moore Controllers Breathing Air manifolds Grout line replacement Elimination of cement from Saltstone recipe Saltstone Disposal Unit (SDU) 6 construction Slurry Mix Evaporator Condensate Tank (SMECT) Sample Pump DCS Melter Feed Tank (MFT) Kurz maintenance Shielded Canister Transporter (SCT) zero level switches SCT wheel bearings Rev. E Documented Safety Analysis (DSA) purge mods Upgrade 3 Canister Decontamination Cell Decon Valves Grout pump hoses Saltstone core sampling Antifoam DSA development Purge instrumentation DSA development Redesign CDC nozzles Evaluate elimination of cement from Saltstone recipe Decon frit valves replacement Melter bubbler replacements Purge system modifications (SC) 512-S secondary filter modifications 512-SW cross flow filter redesign Saltstone Mixer refurbishment Salt feed tank downcomer PVV Mercury Transfer Header flush PVV jumper cleanouts SCT uninterruptable power supply CPC purge air filter sight glasses Process frit line cleanout capability MFT feed pump VFD PVV blower VFD Lab flush 3-way valve Lab cell winch & hoist Diesel Generator 100 Loss of Power Surveillance Melter off-gas Surveillance SRAT/SME interlock Surveillance B8 5 Year Preventive Maintenance (PM) Lab cell window cleaning Field Operating Station PMs Grout process lines Chute inspections Pig valve refurbishment Vault 4 weather enclosures 512-S valve repairs Improve spare parts availability Load center preventive maintenance Steam system repairs Flush water to grout line valve repair Film cooler and quencher cleaning Manipulator arm spare parts Reduced Corrective Maintenance Backlog for SS/SC items SC-1 pump return to service (Spare) TB-6 pump return to service (Spare) SMECT pH probe Process Steam Generator Level Indicating Transmitter Cold Feed Vent SRAT scrubber valve SME Agitator jumper Interim Canister Closure Station heater AA2 Agitator SME Scrubber Melter Transformer SME transfer pump Frit Slurry Makeup Tank sparger Fire System Valve Outfall Soil Removal Victaulic valve covers Saltstone Control room alarm reduction Saltstone Air system piping Fire pump rebuilds Clean capped Vault 4 cells Grout pump motor support Melter cell auxiliary hoist SRAT condenser temperature indication DWTT condenser temperature indication MFT recirculation loop insert Lab drain jumper to RCT Gas Chromatographs NCR KKV temp mod removal 13 Ton motor on main canyon crane Replace Flush Water Valves V-13 & 19 Install new independent SHT sampler to reduce organic cross-contamination Repair / Replace Waste Transfer V-201 Reseal Tank 32 Pump Riser Removal Solids Tank 22 6 Reel Tape Repairs Repair VAMPS/ CAMs Repair Heat Tracing/ Insulation Relocate HLLCPs Upgrade VFDs 16H Evaporator gravity drain line cleanout Tank 30 Back Flush Valve repair Replaced three cooling towers at ETF Replaced the Tank 48 purge ventilation ductwork (SS) Replaced Tanks 1, 3, 7 and 8 purge ventilation fans (SC) Replace Tanks 1, 2, 3, 9, 10 and 23 purge ventilation reheaters (SC) Removal (D&R) of the 704-8H trailer Inter-Area transfer line repairs Installed 15 ARGOS Monitors 3 Tank Vent Reheater Replacements 4 Ducts Replacements 2 Stacks Extensions Tk 15 New HEPA House Replace HDB-8 Crane Wire Rope Repair Tank Transfer Line Jacket Integrity inspection of MCU cell coating Tank 37 Salt Dissolution MCU Coalescer filter replacement 16H evaporator feed pump repair Installed new SS diesel generator for H-Diversion Box (HDB)-8 (SS) Fire Impairment reduction Replaced the Inter-Area Transfer Line (IAL) transfer pump MCU caustic wash mods  MCU Intek flow meters Functional Test of UPS Rebuild Tk 30/37 BFVs Rebuild 2H Feed Pump Perform 20 Instrument PMs on 3H Perform Cooling Tower PMs Rebuild Cooling Tower Pump(s) Repair 2H/3H Steam Leaks Replace DSS coalescer and pre-filter Replace SE coalescer Replace MCU PVV HEPA filters Perform annual PMs/CMs for electrical, instruments and HVAC Replace Tank 49 Transfer Pump Repair Underground Domestic and Well Water Leaks Repair Chromate Water Pumps Replace 3H Building Vent Fan and VFD Replaced Tank 43 Feed Pump Salt Dissolution in Tank 37 Modified Tank 39 Transfer Jet Reduced the Corrective Maintenance Backlog for SS/SC items Replaced 15 conductivity probe junction boxes (SS/SC) Repaired jacket for the Tank 38 gravity drain line (GDL) Repaired transfer line jackets at F-Diversion Box (FDB)-2 Unplugged Drain Line for HDB-2 HDB6 valve repairs and actuator upgrades Fabricated a spare Type III Telescoping Transfer Jet 3H Deliqouring PT-1 Pump Repair Replace DB-8 DG Install MCU rain cover Restore Tank 22 Mixing Capabilities Building Replacement Type III and IIIA TTJs Replace Tank 41 Transfer Pump Replace Tank 4 Transfer Pump and Install valve flushing manifold Tank 37 Back flush valve replacement HDB4 valve repairs and actuator upgrades  Procurement of 3 Slurry Pumps, 5 SMPs & 6 CSMPs Completed cleanout of Leak Detection Box (LDB) Drain Cell Removed temporary modification from F-Catch Tank Installed new air compressors at H and HDB-8 Reestablished stream to the Tank 43 Transfer Jet MCU duct replacement with flush capability  Tank 32 Feed Pump diamond bearings  Tank 37 Transfer Jet  MCU PVV shielding DWPF/Saltstone Tank Farms Completed in FY14 Continued /Coimpleted in FY15 Completed in FY15 Continues in FY16 Focus on: Infrastructure condition improvements Work Around removal Maintenance of Safety System/Safety Class items and transfer capability Reliability improvements A lot accomplished to lengthen the life and increase reliability of SRS Liquid Waste facilities…more to do

8 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. Canister Double Stack Update  Canister Double Stack Project Work includes: –Modify existing locations to store two canisters each (from 2,254 to 4,508) –Remove existing crossbar canister support; lower canister supported on vault floor –Upper canister placed on top of lower canister –Upper canister Shield plug redesigned for equivalent radiological protection –Scheduled to begin double stacking in June Glass Waste Storage Building 1 Canister Double Stack

9 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. Two Projects: No MST Demonstration / Salt Solution Receipt Tanks  No MST Demonstration SRR team continues to refine the system used to process salt waste Eliminating the addition of monosodium titanate (MST) from the salt waste processing system improves ARP filtration rate Successfully processed approximately 200,000 gallons of the salt waste to date Demonstration will continue for several more months  Preparing for Salt Waste Processing Facility In May, one of the two newly constructed Salt Solution Receipt Tanks (SSRT) will begin a Readiness Review –There are two 60,000-gallon SSRTs –Provides 4 days of space for salt operation Liquid waste-wide outage June-September 2017 –Install underground transfer lines for SWPF tie-ins Modular Caustic Side Solvent Extraction Unit Actinide Removal Process SSRT under construction SSRT construction complete

10 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. Tank Closure Cesium Removal  Objective Pursue ion exchange technology to enhance tank closure capabilities Leverage commercial ion exchange supplier expertise and Fukushima experience Improve flexibility by exploring alternatives for spent resin disposal Simple, modular, affordable  Status Best & Final Offer Request for Proposal sent to Suppliers Final Proposals received SRR Proposal evaluation complete – 2/18/16 TCCR Subcontract Award

11 SAVANNAH RIVER SITE AIKEN, SC We do the right thing. Summary  Focus continues on Safe work to protect workers, public, environment Close Tank 12 by May 31, 2016 Continue salt waste processing with ARP/MCU > 1M gallons per year Prepare for Salt Waste Processing Facility startup  Innovative SRR Team continues to provide unique solutions to the liquid waste work No MST demonstration Canister double stack Tank Closure Cesium Removal Many others  Questions?