Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
SQXF Practice Winding 1 L2 winding Miao Yu 01/23/2014.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
Superconducting Large Bore Sextupole for ILC
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
Curing Mold Laminations Miao Yu 05/17/2012. QC on the cross-section 30/30 samples before production 16/500 samples during production 2.
Design and Plans for Introducing Flexible End Parts Steve Krave 15 October 2013.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
1 QXF heater parameters G. Chlachidze, M. Marchevsky March 13, 2014.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
D. Cheng Feb 11, 2014 QXF Instrumentation Trace Update.
1 Quench Protection Workshop - 04/29/2014 QXF heater design M. Marchevsky, D.W. Cheng (LBNL) E. Todesco (CERN) T. Salmi (Tampere UT) G. Chalchidze, G.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
SQXF Mirror QXFSM1 Strain Gauges
QXF Cable Winding Test and End Parts Design
Mechanical stability and QXF coil winding
the MDP High Field Dipole Demonstrator
MQXF updates P. Ferracin October 9th, 2014.
QXF schedule and milestones
Presentation transcript:

DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,

DOE Review of LARP – February 17-18, 2014 Outline Introduction QXF Coil Design – Coil Cross-section – Coil Layout – Coil Pole and End Parts QXF Coil Fabrication-Winding and Curing – Winding and Curing Tooling – Winding and Curing Procedures (Traveler) – Winding Test Summary 2

DOE Review of LARP – February 17-18, 2014 Introduction Based on LARP successful R&D Quadrupole coil TQ/LQ/HQ/LHQ experience. – Coil parts design (BEND program) – Tooling design – Fabrication technology and procedure (winding – curing – reaction – impregnation) – Coil size control at each fabrication step (insulation and shim) to reach the final coil size To meet CERN’s requirement – Field quality (x-section and end design) – Magnetic length (coil length) – Electrical requirement (plasma coating of metallic end parts) – Heat extraction (cooling channels in coil pole) 3

DOE Review of LARP – February 17-18, 2014 QXF Coil Design - Coil Cross-section 4 Magnetic designFabricated Coil Backup slides: Coil cross-section at each step for ground insulation

DOE Review of LARP – February 17-18, 2014 QXF Coil Design - QXF Coil Layout 5 Cooling channel RELE 1.51 m Ti-6Al4V pole and bronze wedge: used for LQ/HQ/LHQ. Stainless steel end spacer, saddle and splice block: used for HQ/LHQ. LQXF is 4.3 m long by adding 7 more center pole pieces.

DOE Review of LARP – February 17-18, 2014 QXF Coil Design - Coil Pole 6 > 80 % of the heat is evacuated via the pole piece with Φ8 mm holes and 50 mm spacing Strain Gauge

DOE Review of LARP – February 17-18, 2014 QXF Coil Design - Coil End Spacer and Saddle 7 End parts are designed based on the nominal coil size after coil reaction During winding, the coil is not fully constrained inside the envelope. This effect is most pronounced at the ends. Prior to curing, the cable separates from radial surface of the mandrel in these areas (springback), causing the shape of the turn to not match the shape of the end parts. The springback is larger with larger coil aperture and cable size. Therefore flexible features (slits) have been introduced in LHQ and QXF coil.  Incremental change with respect to single slit design previously used. End parts are plasma coated to increase the dielectric strength. temporary saddle during W&C QXF slits design with bridges

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - SQXF Winding and Curing Tooling Design 8 Rollover Station Curing Mold Coil Inner Layer Winding

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - SQXF Winding and Curing Tooling Design 9 Rollover Station Curing Mold Winding Coil Outer Layer

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - Winding and Curing Tooling 10 Tooling for SQXF coil was inspected and assembled. Winding and Curing Tooling Rollover Fixture Curing Mold

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - LQXF Winding and Curing Tooling 11 The design of LQXF W&C tooling was finished Procurement will start this summer Curing mold 348” long 5 sections (2: 66” and 3: 72”) Stacking, welding and inspection Final assembly and inspection Use the same rollover fixture for SQXF Winding table will be tested in April Selva winder will be commissioned by this Dec

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - Winding and Curing Procedures (Traveler) 12 Online version based on HQ/LHQ winding and curing traveler Typically, it takes 15 days for winding and curing

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - Winding Test 13 Cured Coil Coil Winding Reduce the risk of turn-turn short due to popped strands Two 1 m coils, winding-curing End parts inspection and design optimization Pre-check tooling and W&C procedures Fabrication of SQXF coils is starting this February

DOE Review of LARP – February 17-18, 2014 Summary QXF coil is designed based on HQ/LHQ coil experience Tooling is ready for SQXF coil winding and curing LQXF coil winding and curing tooling will be procured this summer. Winding and curing procedures are based on HQ/LHQ coil procedures SQXF coil fabrication is starting this month. 14

DOE Review of LARP – February 17-18, 2014 Backup Slides - Coil Size at Each Step 15

DOE Review of LARP – February 17-18, 2014 IL Winding and Curing 16 Midplane 760 µm (30 mil) = 3 layers 10 mil Mylar 250 µm (10 mil) 1.5 mm (60 mil) Curing Retainer 250 µm (10 mil) SS shim Curing Shell OR: mm IR: mm 250 µm (10 mil) Mylar µm (4mil) shrink wrap

DOE Review of LARP – February 17-18, 2014 OL Winding and Curing 17 Midplane OR: mm 760 µm (30 mil) = 100 µm shrink wrap µm SS Shim 250 µm (10 mil) 1.5 mm (60 mil) Curing Retainer 250 µm (10 mil) SS shim 250 µm (10 mil) SS shim

DOE Review of LARP – February 17-18, 2014 Coil Reaction µm (5 mil) MICA 125 µm (5 mil ) MICA 125 µm (5 mil) MICA 125 µm (5 mil) MICA Midplane 250 µm (10 mil) S2 glass 125 µm (5 mil) MICA 125 µm (5 mil) MICA

DOE Review of LARP – February 17-18, 2014 Coil Impregnation µm (6 mil) S2 glass 100 µm (4 mil ) Polyimide trace 150 µm (6 mil) S2 glass 100 µm (4 mil) Polyimide trace 250 µm (10 mil) MYLAR (mold released, removed after impregnation) 125 µm (5 mil) MYLAR (mold released, removed after impregnation) 125 µm (5 mil) G11 Midplane RTV (removed after impregnation)