Breakeven & Payback. Fixed and variable costs $ o utput per period total cost fixed cost variable cost.

Slides:



Advertisements
Similar presentations
Capital Budgeting Capital Budgeting: How managers plan significant outlays on projects that have long-term implications (such as the purchase of new equipment.
Advertisements

Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
13-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 13 Breakeven and Payback Analysis © 2012 by McGraw-Hill.
McGraw-Hill/Irwin Slide 1 McGraw-Hill/Irwin Slide 1 Capital budgeting: Analyzing alternative long- term investments and deciding which assets to acquire.
Other Analysis Techniques
Capital Budgeting. The process of determining and selecting the most profitable long-term (>1 year) projects. Firm ’ s capital budgeting decisions define.
11-1 Typical Capital Budgeting Decisions Plant expansion Equipment selection Equipment replacement Lease or buy Cost reduction.
INVESTMENT APPRAISAL NON DISCOUNTING By Lucky Yona.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
11-1 Lecture 8: Capital Budgeting Decisions Chapter 12 in Brewer.
Investment Appraisal Methods L3 Business Studies.
Engineering Economy Lecture 8 Evaluating a Single Project IRR continued Payback Period.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Engineering Economics Outline Overview
1 Dr. Lotfi K.GAAFAR Eng. Ahmed Salah RIFKY ENGR 345 Engineering Economy.
Other Analysis Techniques
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
Multiple Investment Alternatives Sensitivity Analysis.
Flash back before we compare mutually exclusive alternatives.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Special Business Decisions and Capital Budgeting Chapter 25.
Operations Management Capacity Planning Supplement 7
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
26 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Chapter 26 Special Business Decisions and Capital Budgeting.
UNIT: 5.3 – Break-even Analysis pg. 642 Understand/practice break-even analysis & margin of safety IB Business Management.
5.3 Break-Even Analysis Chapter 32.
Ch11. Project Analysis and Evaluation. 1) Scenario and other what-if analyses Actual cash flows and projected cash flows. Forecasting risks (estimation.
Week 10 DIFD 321 Accounting & Finance. WHAT IS MARKETING? The action or business of promoting and selling products or services, including market research.
EPT 221 Engineering Design Introduction to Engineering Economics.
CTC 475 Review  Course Requirements  Applications  Multiple Decision Criteria  Selling The Project  PSP.
Cost Volume Profit Analysis or Break Even Analysis Dr. R. Jayaraj, M.A., Ph.D.,
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
CHAPTER 5 COST – VOLUME - PROFIT Study Objectives
9-0 Payback Period 9.2 How long does it take to get the initial cost back in a nominal sense? Computation Estimate the cash flows Subtract the future cash.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. The Capital Budgeting Decision 12.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Break Even Point and Payback Period Course Outline 11.
The Mystery of Calculating The Breakeven Point. What in the world is it? w It is the point at which a company does not make any money. w It is the calculation.
Evaluating a Single Project
Calculating Break Even When will you be independent?
Cost-Volume-Profit Analysis. CVP Scenario Cost-volume-profit (CVP) analysis is the study of the effects of output volume on revenue (sales), expenses.
Chapter 8 Capital Asset Selection and Capital Budgeting.
7-1 Break-even Example 1 A firm produces radios with a fixed cost of $7,000 per month and a variable cost of $5 per radio. If radios sell for $8 each:
The Decision Maker. Managing a Profitable Company.
DR MONIKA JAIN KEY MEASURES AND RELATIONSHIPS. REVENUE The total monetary value of the goods or services sold is called revenue. The difference between.
Multiple Product CVP Analysis The easy way. What is multiple product CVP Analysis? Sell multiple products Ratio of products sold is assumed constant Determine.
Chapter 15 Capital Budgeting. Typical Capital Budgeting Decisions Capital budgeting tends to fall into two broad categories...  Screening decisions.
Engineering Economics, Ejaz Gul, FUIEMS, 2009 Engineering Economics Lecture # 8 MARR, Analysis of Alternatives.
EGR Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms:
IENG 217 Cost Estimating for Engineers Break Even & Sensitivity.
Needles Powers Crosson Financial and Managerial Accounting 10e Capital Investment Analysis 24 C H A P T E R © human/iStockphoto ©2014 Cengage Learning.
EGR Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms:
@ 2012, Cengage Learning Cost Behavior and Cost-Volume-Profit Analysis LO 3a – Understanding Break-Even.
Investment decision making. Capital investment Capital investments are usually long term and expensive. Examples of capital investment include: Plant.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
BREAK EVEN POINT & ANALYSIS BREAK EVEN POINT & ANALYSISFROM  MANJULA ROY  AKHILESH GIRI  UDAY PRATAP SINGH  PRASHANT KUMAR.
Break Even Knowing the Numbers. Your boss asks… How many of these things do we have to sell before we start making money? If we sell 100,000 units, what.
Marketing Math Made Really Easy Copyright 2016 by John Story.
Class # 7 Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1.
Part 1 : Understanding Money And Its Management (Ch1,2,3,4) Part 2: Evaluating Business and Engineering Assets (5,6,7)
Chapter 5: Evaluating a Single Project
Lesson 15-2 Determining Breakeven
TM 661 Chapter 5 Solutions 1 5.4) Consider the net cash flows and salvage values for each of alternatives 1 and 2 having lives 3 and 5 years respectively.
Comparing Mutually Exclusive Alternatives
Chapter 5: Evaluating a Single Project
Lecture slides to accompany Engineering Economy, 8th edition
Chapter 7 Present Worth Analysis
PRESENT WORTH ANALYSIS Chapter 5
Chapter 11: Breakeven and Sensitivity Analysis
Presentation transcript:

Breakeven & Payback

Fixed and variable costs $ o utput per period total cost fixed cost variable cost

“Classical” breakeven analysis (from microeconomics) $ output/period breakeven total revenue total cost

To reduce the breakeven quantity Only three variables: reduce fixed cost indirect costs such as rent, advertising, management sometimes called “downsizing” reduce variable cost reduce direct labor (automation or efficiency) reduce energy costs (efficiency or energy conservation) use cheaper materials increase selling price

Reduce fixed cost $ output/period bB R tc TC fc FC

Reduce variable cost $ output/period bB R tc TC FC

Increase selling price $ output/period bB R tc TC FC r

Breakeven example A commuter airline has fixed operating costs of $630,000 per month. It flies 320 flights per month with a maximum of 25 passengers per flight. Tickets are sold for $120 and each passenger incurs $20 in variable costs. How many passengers must the airline serve each month to break even? Each passenger covers $ = $100 of the fixed cost. (called the “contribution”) Since the capacity is 320 * 25 = 8000 passengers per month, each flight must average 6300/8000 = 78.75% full to break even.

Breakeven for comparison between alternatives Total Cost Units per period Alternative A Alternative B Breakeven point

Breakeven with other variables Initial cost$120,000 Salvage Value40,000 Annual Revenue36,000 Annual cost20,000 If your MARR is 15% what project life is needed to break even on this project? NPW = 0 = -120, ,000 (P/F,15%,n) +16,000 (P/A,I%,n) Probably will require interpolation if you do it by hand and need a fractional year answer.

Class problem Your trucking company is considering two alternatives for saving fuel costs. Costs per truck are given. Diesel fuel costs $1 per gallon and the trucks get 5 miles per gallon. Use a planning horizon of four years. Your MARR is 10%. Over what range of mileage driven per year do you prefer each alternative? AB Initial cost$1000$400 Fuel savings16%8% Annual maintenance $10$5

Solution Use present worth. Current fuel cost is $1 * miles / 5 PW(A) = (.16 *.2 * miles)(P/A,10%,4) PW(B) = (.08 *.2 * miles) (P/A,10%,4)

Payback period How long does it take to recover your initial investment?

Simple examples If you pay $1000 now for a project which will save you $500 per year what is the “payback period?” $1000/$500 = 2 years If you pay $1000 now for a project which will save you $300 per year what is the payback period? $1000/$300 = 3.33 years

Payback is different The only method which ignores time value of money. Assumes continuous cash flows, not end of period cash flows, so that fractional years can be calculated. Ignores all cash flows after payback. Works better for yes-no decisions than for comparisons.

According to the textbooks: “Payback period should never be used as the primary measure of worth to select an alternative. Rather it should be determined in order to provide initial screening or supplemental information in conjunction with an analysis performed using present worth or another method.” “It is incorrect to use the no-return payback period to make final alternative selections…….”

Payback Very widely used in industry. Easy to compute Easy to understand Measures liquidity Usually used very conservatively typical paybacks are 12, 18 and 24 months Frequently used for small projects often has a dollar limit attached can speed implementation

Project balance example Payback period is

Using payback for comparison between alternatives Use fractional years or months to compare To select alternative A over alternative B you need to meet three criteria: A must cost less than the company-set maximum cost for use of payback. A must have a payback shorter than the company- set maximum. A must have a shorter payback than B. Requires common sense: don’t select an alternative that “pays back and quits!”

Comparison Example Payback = 4 years Payback = 1 2/3 years

Another comparison All have the same (2-year) payback period but they are not all equally desirable.