Arete-Zoe: Lessons from TMI Lessons from big industrial accidents and their relevance for the Pharma industry.

Slides:



Advertisements
Similar presentations
Accident and Incident Investigation
Advertisements

Three Mile Island (TMI-2)
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
Safety Implications of the Fukushima Nuclear Accident Sheldon L. Trubatch, Ph.D., J.D. Vice-Chairman Arizona Section American Nuclear Society.
Industrial Health & Safety
Capturing and Reporting Adverse Events in Clinical Research
Accidents Happen But Nuclear Accidents Require Special Skill!
MIS 5241 Three Mile Island What Happened, What Worked, What Didn’t.
Nuclear Power Plants Disasters and their possible meltdowns.
The Australian/New Zealand Standard on Risk Management
Tony Gould Quality Risk Management. 2 | PQ Workshop, Abu Dhabi | October 2010 Introduction Risk management is not new – we do it informally all the time.
Nuclear Power.
Quality Risk Management ICH Q9 Annex I: Methods & Tools
Safety of Nuclear Power Reactors Final Presentation ESL Fall 2006 Anatoliy Borodin.
Clinical Pharmacy Basma Y. Kentab MSc..
Codex Guidelines for the Application of HACCP
Nuclear Fission & Fusion Nuclear Fusion - Energy released when two light nuclei combine or fuse However, a large amount of energy is required to start.
Regulatory Update Ellen Leinfuss SVP, Life Sciences.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Nuclear Power Dylan Waybright Kendall Caminiti Gina Raimondo Susan Ellington Paige Urbanovsky.
Facilitating Safe and Reliable Operations! MME-1 Managing Maintenance Error Using Human Performance Improvement Department of Energy Human Performance.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Performance Measurement and Analysis for Health Organizations
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
Preventing Surgical Complications Prevent Harm from High Alert Medication- Anticoagulants in Primary Care Insert Date here Presenter:
Nuclear Power as a High Risk System And the Accident at Three Mile Island Discussing Perrow Chapters 1 and 2 Presented by Gus Scheidt Friday the Thirteenth.
Local Public Health System Assessment using the NPHPSP Local Instrument Essential Service 6 Enforce Laws and Regulations that Protect Health and Ensure.
Nuclear Energy Chapter 12. Nuclear Fuel Cycle Uranium mines and mills U-235 enrichment Fabrication of fuel assemblies Nuclear power plant Uranium tailings.
1 Human Performance in Reactor Safety George E. Apostolakis Massachusetts Institute of Technology Presented at the Quality Colloquium,
Investigation of Accelerator Incidents – Regulatory Perspective Abdul Alwani Canadian Nuclear Safety Commission.
Daniel Stewart.  Accidents in a nuclear plant can range from minor emissions of radioactivity to catastrophic releases such as: - widespread radiation.
By Matt Douglass.  The Three Mile Island accident was a partial nuclear meltdown which occurred in one of the two Three Mile Island nuclear reactors.
QUALITY RISK MANAGEMENT RASHID MAHMOOD MSc. Analytical Chemistry MS in Total Quality Management Senior Manager Quality Assurance Nabiqasim Group of Industries.
1 IE 590D Applied Ergonomics Lecture 26 – Ergonomics in Manufacturing & Automation Vincent G. Duffy Associate Prof. School of IE and ABE Thursday April.
Worldwide Commercial Energy Production. Nuclear Power Countries.
Nuclear Power Generation In The United States. 103 Nuclear Power Reactors.
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
1 Safety - definitions Accident - an unanticipated loss of life, injury, or other cost beyond a pre-determined threshhold.  If you expect it, it’s not.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
Responsible Care® Health & Safety Task Force – 06 H&S.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
Chernobyl Sydney Curley.
Chapter 12 Nuclear Energy.
Measuring Results of Improvement Actions Márcio Rodrigues, Tallin, 13/01/2015.
Kathy Corbiere Service Delivery and Performance Commission
Chernobyl Nuclear Power Plant Accident April
Presented to: By: Date: Federal Aviation Administration AIRWORTHINESS Positive Safety Culture Failure to Follow Procedures 1 R1.
BY: Zach Alexander JT Bagwell Bobby Dini Nixy Osorio Darren Ringer Trent Roling CHERNOBYL.
Behind the Mirror of Safety Steve Danon Director, Risk Control Services Marcotte Insurance Agency.
1 Presentation of the Pharmaceutical Research and Manufacturers of America at FDA Part 15 Hearing on Communication of Drug Safety Information December.
Ta’Juan Dutrieuille November 4, 2009 Period 1
Applying New Science to Drug Safety Janet Woodcock, M.D. Acting Deputy Commissioner for Operations April 15, 2005.
1 Compliance vs. the Law Department: How to Work Together Michael Dusseau Senior Director, Compliance North America Schering-Plough David Ralston, Esq.
Domino B. Puson Instructor I Cebu Normal University.
Methodological Issues in Implantable Medical Device(IMDs) Studies Abdallah ABOUIHIA Senior Statistician, Medtronic.
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
Failure Modes, Effects and Criticality Analysis
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
KEVIN BEDAL LISA CARLIN MATT CARROLL ERIN NICHOLS Product Safety & Failure Analysis.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
DATA COLLECTION METHODS IN NURSING RESEARCH
Chernobyl disaster The worst manmade disaster in human history
Czech Technical University in Prague
By: Brandy Lathrop December 6th 2016 December 16th 2016.
Chapter 3: risk measurement
Quality Risk Management
9.5 Nuclear Power Although nuclear power does not come from a fossil fuel, it is fueled by uranium, which is obtained from mining and is non-renewable.
Presentation transcript:

Lessons from TMI Lessons from big industrial accidents and their relevance for the Pharma industry

ARETE-ZOE, LLC Registered address: 1334 E Chandler Blvd 5A-19, Phoenix AZ, USA Solutions to complex problems in the high stakes and high consequence environment of Global Pharmaceuticals, including clinical research, healthcare informatics, and public health. We blend established, Pharma sector methodologies, innovation, and adaptations/transfers from other sectors to identify and resolve consequential practices that pose risk and often result in avoidable patient casualty.

Three Mile Island, PA, USA (1979)

Reactor Cadmium rods Steam generator Cooling circuit

Turbines Steam pipes

03:58 AM, March 28, 1979 Routine repair of clogged filter Trace of water left inside air circuit

Alarms went off …causing confusion in the operating room

Computers interpreted “water in air system” as “dangerous invader” and shut down the pumps in cooling circuit

Steam generator Nuclear reactor Pumps in cooling circuit shut down Why: Misinterpreted information from the air circuit Consequence: Cooling system disabled, reactor heating up

Operators faced situation they were not trained for and was not covered by their procedures

Pressure is building up in primary cooling system within the reactor

Computer ordered cadmium rods to plunge into the reactor and stopped chain reaction Pressure and heat within the reactor continues to build

Pressure operator relief valve (P.O.R.V.) opened to vent the pressure and failed to reclose

Indicator incorrectly shows that the valve has now reclosed Design: Indicator correctly shows that the control order has been “sent”, not “obeyed”

Surrogate endpoint In clinical trials, a surrogate endpoint (or marker) is a measure of effect of a specific treatment that may correlate with a real clinical endpoint but does not necessarily have a guaranteed relationship. Disease Surrogate endpoint True clinical endpoint Intervention

Valve open, reactor coolant leaking out without anyone’s knowledge

Stuck valve undetected Why: Misinterpreted information from indicators Consequence: cooling system disabled, reactor heating up

Communication failure Single phone line in the operating room Key people unable to get through 1

Overheated reactor Incorrect readings from instruments Volume of coolant measured indirectly Decision: to turn off reactor pumps  Incorrect conclusions Loss of trust in the instruments System did not behave as expected OBSERVE ORIENT DECIDE

Training Decisions based on incorrect, misleading or no information

7:15 AM stuck valve finally discovered Pumps were finally restarted  Reactor still overheating  Misleading temperature readings Why: Instruments not designed for temperatures this high Radiation in operating room  Mounting pressure

8:33 AM – General emergency Misleading and deceptive information provided to the public by the company Minimum information provided to state administration and regulators Partial evacuation within 5 mile radius

Freedom of speech, anyone? U.S. v. Caronia Amarin v. FDA Not an issue during TMI Real concern now in off-label promotion (Must be “truthful”)

Reactor cracked Sample of contaminated coolant

Basement full of contaminated water Radioactive gas was eventually released into the atmosphere

Oh, BTW, it can blow up because of accumulated hydrogen Fierce dispute within the NRC whether this can happen or not This risk did not materialize. Partial reactor meltdown did not result in any additional release of radiation.

Complex combination of minor equipment failures and major inappropriate human actions

Risk = Probability x Consequence 1973 oil crisis Cheap power needed Political topic Gov’t subsidies Probability assessment flawed “That can’t happen here” mindset

Root cause: Human factors Combination of lesser events Misjudged probability Misinformation Confusion Inadequate training Inappropriate human response Ordinary mistakes in high stakes environment Probability Consequence X X X ? ? ? ?

The need for change RECOMMENDATIONS Fundamental changes in Organizational procedures and practices The attitude of regulators Operator training, updates Emergency response and planning Organization failed to learn from previous failures

The need for change RECOMMENDATIONS More attention to human factors Combination of lesser events (slower to develop, more likely) Training, fitness for duty Organizational structure Communication Focus on equipment safety and large break accidents

Compliance v. Safety culture “It is the responsibility of the NRC to issue regulations to assure the safety of nuclear power plants. However, regulations alone cannot assure safety. Once regulations become as voluminous and complex as those now in place, they can serve as a negative factor in nuclear safety. The complexity requires immense efforts to assure compliance. Requirement v. Consequence The satisfaction of regulatory requirements is equated with safety.

Focus on compliance with regulations instead of intrinsic system safety Inspection manual voluminous and complex – unclear to many inspectors Enforcement actions limited/unused Reliance on industry own data No systematic evaluation of patterns Unclear Roles & Responsibilities The role of regulators

NRC has erred on the side of the industry's convenience rather than its primary mission of assuring safety The role of regulators HUMAN FACTORS Fiduciary responsibilities of public servants

Worst problem: Loss of public trust Misinformation Deception Misunderstanding Fear & Confusion

Outcome Transformation of the industry Major regulatory reform

Chernobyl, Ukraine, USSR (1986)

Orders received to carry out tests to find out how much energy can be saved during routine maintenance shut down. Numerous safety mechanisms had to be turned off to make this test possible

Power levels lowered to perform tests Emergency core cooling system shut off Operator failed to program computer to prevent power from dropping below minimum safe level Automatic scram devices an alarms switched off Control rods withdrawn too far to reinsert quickly = Bad idea = Very bad idea

Chernobyl nuclear plant, unit 4 April 26, AM 1:23 AM

Study into systemic factors

Systemic factors Long record of sometimes fatal accidents  ACCIDENT WAITING TO HAPPEN National 5-year production goals oblivious to reality Training often suspect and shoddy Lax observance of rules and regulations Causes of disaster Irresponsibility Negligence Indiscipline Flawed performance metrics HUMAN FACTORS

Outcome Sweeping changes in Soviet society Disintegration of the Empire due to loss of credibility

Volkswagen, Germany (2015)

Martin Winterkorn, CEO of Volkswagen, AG acknowledged that 11 million vehicles were equipped with diesel engines with defeat devices to cheat pollution tests

…And spreading

Criminal probe underway

Root cause Cause entirely internal Flawed performance metrics VW very sensitive to its own image Internal pressures to improve metrics caused someone to manipulate the system – in a manner that amounted to conspiracy

Lessons learned? Behavior of organizations follows the same principles regardless industry

Common attributes Formally regulated industries High-stakes, high consequence environment Information flow within organization Communication with stakeholders Public trust essential TMIVWChernobyl Accident caused by systemic factors impacts the whole industry

Common root cause? Requirement v. Consequence Individual and collective accountability Poor leadership Flawed performance metrics Failure to learn from previous errors Communication with stakeholders / public Regulatory response Delivery/enforcement of regulation TMIVWChernobyl HUMAN FACTORS

Regulators and elected officials Subject to the same human frailties Oblivious to ambiguity Requirement v. Consequence Public trust essential TMIVWChernobyl HUMAN FACTORS

Experience, training, education CapabilitiesDemographicsFrailtiesValues Organizational culture Reporting structure Leadership Ethical

What is risk? Probability of detrimental consequence Risk Vulnerability in process Probability Threat Capability Intent / Ability Detrimental consequence Accidental Malicious

Qualifying consequence Safety signal: It takes significant number of casualties with attributed causal relationship to produce a signal Statistically significant cause attributed to a drug Patient injury Qualifying consequence

Attribution Dispensing error / incorrect substitution) Non-compliance with treatment Self-medication (OTC, Rx, illicit) Atypical manifestation of disease Misdiagnosis Prescribing error Wrong dose (predictable, unpredictable) Individual variability in response Misleading information on drug Drug interactions (known, unknown) Off-label use (appropriate, inappropriate) Counterfeit medications Limitation of science Honest mistake Omission Commission Deception False Claim PATIENT INJURY

Adverse outcome: Consequences Patient Clinician Pharmacist Regulator Drug manufacturer Healthcare facility Insurer Elected officials Individual Population COMMON CONSEQUENCE The only way how to change behavior of organizations is… …to create

Detection of vulnerabilitites Probability of detrimental consequence Risk Vulnerability in process Probability Threat Capability Intent / ability Detrimental Consequence Accidental Malicious

Quality risk management Record of past events (EV, FAERS) FTA, FMEA, FMECA HAZOP, HACCP, PHA Systems modeling Identify Vulnerabilities Impose safety Constraints Enforce these constraints By Design By Operations Risk assessment ICH Q9 ICH E2E Define Accountability for control of vulnerabilities and acting upon them (R&R) Enable decision-makers

Systems theoretic accident process and modeling (STAMP) Imposing constraints on a system whilst ensuring enforceability of these constraints by design and operations Human supervisor (Controller) Model of process Model of automation Automated Controller Model of process Model of interfaces Controlled process Sensor Displays Controls Process inputs Disturbances Process outputs Actuators Controlled variables Measurable variables

System models Simplified models of complex environment Tools to enable decision-makers Reduce ambiguity and uncertainty Accountability for acting upon vulnerabilities Limit liability HUMAN FACTORS Tools do not substitute good leadership PUBLIC TRUST

Training Correct input – accurate and timely orientation

Download presentation Thank you