Texas Nodal © 2005 - 2006 Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.

Slides:



Advertisements
Similar presentations
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 RT Energy Settlements Mini Market Examples Formulas.
Advertisements

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Market Ancillary Services Business Requirements.
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
CSWG Update Blake Holt ERCOT CSWG 02/23/ CRR Balancing Account $2,179, CRRBACRTOT $67,789.11CRRFEETOT DACRRSAMTTOT $500, $1,747,349.16CRRBAF.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Reliability Must Run Settlements Business Requirements.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Lead from the front Texas Nodal 1 Texas Nodal Day-Ahead CRR Settlements Business Requirements TPTF Presentation ERCOT Settlements.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
NPRR 617 Overview and Justifications. Overview Current protocols place restrictions on Day-Ahead Three-Part Supply Offers – Part 1 (Startup Offer) – capped.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
Settlement Update Blake Holt ERCOT 2/15/2016. Agenda NPRR689 – R1 – 02/10/16 NPRR744 – Buy-Back notification NPRR746 – Negative load impacts 2016 Settlement.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
RUC Startup Discussion. Problem The RUC language in the Nodal Protocols allows little or no ability for a generator to recover risk associated with operating.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ORDC Settlements Overview Matthew Tozer & Blake Holt ERCOT CSWG 4/21/2014.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Operations Energy Settlements Business Requirements.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
Nodal Settlement Status and Observations Jim Galvin, SEWG Chair.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Market Energy Settlements Business Requirements.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
COMS Nodal Commercial Systems Project TPTF Meeting September 2007 Raj Chudgar.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
ERCOT Market Design & Operations
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Ancillary Service Trades and Ancillary Service Settlement
Vendor Definition of DAM Commitment
Presentation transcript:

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements Settlements and Billing August 8, 2006

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 2 Agenda Relevant Charge Type & Related Calculations Highlights of Business Requirements –Calculation Maps –Calculations –Outstanding Issues or Assumptions

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 3 RUC Charge Types Charge Type Calculations: –RUC Make-Whole Payment (PR and PR (a)) –RUC Clawback Charge (PR and PR (b)) –RUC Decommitment Payment (PR and PR (c)) –RUC Capacity-Short Charge (PR and PR (d)) –RUC Make-Whole Uplift Charge (PR and PR (e)) –RUC Clawback Payment (PR and PR (f)) –RUC Decommitment Charge (PR and PR (g))

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 4 RUC Related Calculations Related Calculations: –Startup Price (PR , PR 5.7.3) –Minimum-Energy Price (PR , PR , PR 5.7.3) –RUC Guarantee (PR ) –RUC Minimum-Energy Revenue (PR ) –Revenue Less Cost Above LSL During RUC-Committed Hours (PR ) –Revenue Less Cost During QSE Clawback Intervals (PR ) –RUC Shortfall (PR ) which includes: RUC Capacity at Snapshot and Adjustment Period RUC Shortfall at Snapshot and Adjustment Period RUC Shortfall and RUC Shortfall Total RUC Shortfall Ratio Share –RUC Capacity Credit (PR )

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 5 RUC Make-Whole Payment Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 6 RUC Make-Whole Payment Highlights (2) Requirement IDFR91 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR 5.7.1, PR (a) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Make-Whole Payment Amount by QSE and Resource for each Hour of the Operating Day. RUCMWAMT_ _ = (-1) * MAX(0, RUCG_ _ - RUCMEREV_ _ - RUCEXRR_ _ - RUCEXRQC_ _ ) / RUCHR_ _ Requirement IDFR92 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Make-Whole Payment Amount RUC Total by RUC Process for each Hour of the Operating Day. RUCMWAMTRUCTOT_ = RUCMWAMT_ _ Requirement IDFR93 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Make-Whole Payment Amount Total for each Hour of the Operating Day. RUCMWAMTTOT = RUCMWAMTRUCTOT_

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 7 RUC Clawback Charge Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 8 RUC Clawback Charge Highlights (2) Requirement IDFR111 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Clawback Factors by QSE and Resource for each Operating Day. If QSE submits a Three-Part Supply (SUO, MEO and Energy) into the DAM for the Resource, Then, RUCCBFR_ _ = 0.5 for the Operating Day If EECP is in effect for any hour of the Operating Day: RUCCBFR_ _ = 0.0 for the Operating Day RUCCBFC_ _ = 0.0 for the Operating Day Otherwise, RUCCBFR_ _ = 1.0 for the Operating Day If EECP is in effect for any hour of the Operating Day: RUCCBFR_ _ = 0.5 for the Operating Day RUCCBFC_ _ = for each hour of the Operating Day

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 9 RUC Clawback Charge Highlights (2) Requirement IDFR113 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Clawback Charge Amount Total for each Hour of the Operating Day. RUCCBAMTTOT = RUCCBAMT_ _ Requirement IDFR112 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR 5.7.2, PR (b) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Clawback Charge Amount by QSE and Resource for each Hour of the Operating Day. If (RUCMEREV_ _ + RUCEXRR_ _ - RUCG_ _ ) > 0, Then, RUCCBAMT_ _ = [(RUCMEREV_ _ + RUCEXRR_ _ - RUCG_ _ ) * RUCCBFR_ _ + RUCEXRQC_ _ * RUCCBFC_ _ _ Otherwise, RUCCBAMT_ _ = [Max (0, RUCMEREV_ _ + RUCEXRR_ _ + RUCEXRQC_ _ - RUCG_ _ ) * RUCCBFC_ _ ] / RUCHR_ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 10 RUC Clawback Charge Highlights (3) Issues: 1.The calculation in the Protocols allows for only one (1) daily Clawback factor for RUC-Committed hours per Operating Day but the paragraphs above the calculation in the Protocols imply that the Clawback factor for RUC-Committed hours can change if EECP is in effect. –Can EECP be in effect a certain time period that may not equal an entire Operating Day? –Assumption made: If EECP is in effect for any part of the Operating Day then ERCOT will use the EECP Clawback factor for the entire Operating Day. This issue may need an NPRR to clarify and state the wishes of TPTF. 2.Assumption made: The valid Three-Part Supply Offer submitted for use in the DAM will be used to determine Clawback factors.

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 11 RUC Decommitment Payment Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 12 RUC Decommitment Payment Highlights (2) Requirement IDFR130 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR 5.7.3, PR (c) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Decommitment Payment Amount by QSE and Resource for each Hour of the Operating Day. RUCDCAMT_ _ = (-1) * Max (0, (SUPR_ _ _ - (Max (0, MEPR_ _ - RTSPP_ ) * (LSL_ _ * (¼))))) / NCDCHR_ _ Requirement IDFR131 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Decommitment Payment Amount Total for each Hour of the Operating Day. RUCDCAMTTOT = RUCDCAMT_ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 13 RUC Decommitment Payment Highlights (3) Issues: 1.What STARTTYPE (hot, intermediate, cold) is used to pay startup costs for the RUC Decommitment Payment? –Assumption made: The STARTTYPE for RUC Decommitment Payments can be hot, intermediate or cold and is determined by the length of the Decommitment and the parameters of the Resource.

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 14 RUC Capacity-Short Charge Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 15 RUC Capacity-Short Charge Highlights (2) Requirement IDFR147 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR , PR (d) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Capacity-Short Charge Amount by QSE and RUC Process for each 15-minute Settlement Interval of the Operating Day. RUCCSAMT_ _ = (-1) * Max [(RUCSFRS_ _ * RUCMWAMTRUCTOT_ ), (2 * RUCSF_ _ * RUCMWAMTRUCTOT_ / RUCCAPTOT_ )] / 4 Where: RUCCAPTOT_ = HSL_ _>R>_ Requirement IDFR148 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Capacity-Short Charge Amount Total for each Hour of the Operating Day. RUCCSAMTTOT = RUCCBAMT_ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 16 RUC Make-Whole Uplift Charge Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 17 RUC Make-Whole Uplift Charge Highlights (2) Requirement IDFR194 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR , PR (e) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Make-Whole Uplift Charge Amount by QSE for each 15-minute Settlement Interval of the Operating Day. LARUCAMT_ = (-1) * ( RUCMWAMTTOT / 4 + RUCCSAMTTOT) * LRS_

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 18 RUC Clawback Payment Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 19 RUC Clawback Payment Highlights (2) Requirement IDFR203 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR 5.7.5, PR (f) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Clawback Payment Amount by QSE for each 15-minute Settlement Interval of the Operating Day. LARUCCBAMT_ = (-1) * [(RUCCBAMTTOT / 4) * LRS_ ]

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 20 RUC Decommitment Charge Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 21 RUC Decommitment Charge Highlights (2) Requirement IDFR211 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR 5.7.6, PR (g) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Decommitment Charge Amount by QSE for each 15-minute Settlement Interval of the Operating Day. LARUCDCAMT_ = (-1) * [(RUCDCAMTTOT / 4) * LRS_ ]

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 22 Startup Price Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 23 Startup Price Highlights (2) Requirement IDFR211 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR , PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the SUPR by QSE and Resource, for each Start Type, for each Resource with a RUC commitment within the Operating Day. If, SUO for the Resource exists in the settlement system for the calculated Operating Day, SUPR_ _ _ _ = SUO_ _ _ _ Else, If VERISU for the Resource is available in the settlement system for the calculated Operating Day, SUPR_ _ _ _ = VERISU_ _ _ _ Else, SUPR_ _ _ _ = RCGSC (resource category for the Resource) End

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 24 Startup Price Highlights (3) Issues: 1.Settlements requires instruction on how to settle Combined Cycle resources based on Combined Cycle configurations. More information is needed. Until more information is available: –Assumption made: When no offer is submitted and no verifiable exists, the generic value for Combined Cycle Resources will be determined using the existing table in Section (1) for calculation of Startup Price (SUPR).

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 25 Minimum-Energy Price Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 26 Minimum-Energy Price Highlights (2) Requirement IDFR211 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR , PR , PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the MEPR by QSE and Resource for each Resource with a RUC commitment within the Operating Day. If, MEO for the Resource exists in the settlement system for the calculated Operating Day, MEPR_ _ _ = MEO_ _ _ Else, If VERIME for the Resource is available in the settlement system for the calculated Operating Day, MEPR_ _ _ = VERIME_ _ _ Else, MEPR_ _ _ = RCGMEC (resource category for the Resource) End

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 27 Minimum-Energy Price Highlights (3) Issues: 1.The Resource Category Generic Minimum-Energy Cap is dependant on information submitted in the Three-Part Supply Offer. Settlements will only use the cap if no offer is submitted therefore the dependency does not allow settlements to calculate the cap. –Assumption made: Settlements will only use the cap if no offer is submitted therefore Settlements shall use 100% of the minimum of FIP or FOP. 2.Settlements requires instruction on how to settle Combined Cycle resources based on Combined Cycle configurations. More information is needed. Until more information is available: –Assumption made: When no offer is submitted and no verifiable exists, the generic value for Combined Cycle Resources will be determined using the existing table in Section (2) for calculation of Minimum-Energy Price (MEPR).

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 28 RUC Guarantee Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 29 RUC Guarantee Highlights (2) Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the RUCG by QSE and Resource, for each Resource with a RUC commitment within the Operating Day. RUCG_ _ _ = (SUPR_ _ _ _ * RUCSUFLAG_ _ _ ) + (MEPR_ _ _ * Min ((LSL_ _ _ * (¼)), RTMG_ _ _ ) Note: Startup portion of the RUCG calculation For each contiguous RUC-Commitment; If startup is eligible (RUCSUFLAG = 1 in hour one of the contiguous RUC Commitment), determine the type of start (hot, intermediate, cold) based on the STARTTYPE bill determinant. STARTTYPES: Not Eligible = 0 Hot = 1 Intermediate = 2 Cold = 3 If STARTTYPE = 0 for a contiguous RUC Commitment, then use zero (0) in place of SUPR when calculating RUCG. Multiply the SUPR for the type of start indicated on the STARTTYPE bill determinant and the RUCSUFLAG (which will be one (1)). Then sum all eligible starts for the Operating Day. There can be more than one (1) contiguous RUC-Commitment within an Operating Day therefore it is possible to have more than one (1) eligible startup for an Operating Day. For each Resource, only one Startup Cost is eligible per block of contiguous RUC-Committed Hours. PR (2)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 30 RUC Minimum-Energy Revenue Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 31 RUC Minimum-Energy Revenue Highlights (2) Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the RUCMEREV by QSE and Resource, for each Resource with a RUC commitment within the Operating Day. RUCMEREV_ _ _ = (RTSPP_ * Min (RTMG_ _ _, (LSL_ _ _ * (¼))))

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 32 Revenue Less Cost Above LSL During RUC-Committed Hours Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 33 Revenue Less Cost Above LSL During RUC-Committed Hours Highlights (2) Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the RUCEXRR by QSE and Resource, for each Resource with a RUC commitment within the Operating Day. RUCEXRR_ _ _ = Max {0, [RTSPP_ * Max (0, RTMG_ _ _ – (LSL_ _ _ * (¼))) + (-1) * (VSSVARAMT_ _ _ + VSSEAMT_ _ _ ) + (-1) * EMREAMT_ _ _ – RTAIEC_ _ _ * Max (0, RTMG_ _ _ – (LSL_ _ _ * (¼)))]}

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 34 Revenue Less Cost During QSE Clawback Hours Highlights (1)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 35 Revenue Less Cost During QSE Clawback Hours Highlights (2) Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate the RUCEXRQC by QSE and Resource, for each Resource with a RUC commitment within the Operating Day. RUCEXRQC_ _ _ = Max {0, [(RTSPP_ * RTMG_ _ _ ) + (-1) * (VSSVARAMT_ _ _ + VSSEAMT_ _ _ ) + (-1) * EMREAMT_ _ _ – [MEPR_ _ _ * Min (RTMG_ _ _, (LSL_ _ _ * (¼)))] – [RTAIEC_ _ _ * Max (0, RTMG_ _ _ – (LSL_ _ _ * (¼)))]]}

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 36 RUC Shortfall Highlights (1) RUC Capacity at Snapshot / RUC Capacity at Adjustment Period / RUC Capacity Total

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 37 RUC Shortfall Highlights (2) Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Capacity at Snapshot by QSE, for each RUC Process, for each 15-minute Settlement Interval of the Operating Day. RUCCAPSNAP_ _ = HASLSNAP_ _ _ _ + (RUCCPSNAP_ _ – RUCCSSNAP_ _ ) + ( DAEP_ _ – DAES_ _ )+ ( RTQQEPSNAP_ _ _ – RTQQESSNAP_ _ _ ) Requirement IDFR3 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Capacity Total for each RUC Process of the Operating Day. RUCCAPTOT_ = HSL_ _>R>_ _ Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Capacity at Adjustment Period by QSE, for each RUC Process, for each 15-minute Settlement Interval of the Operating Day. RUCCAPADJ_ = HASLADJ_ _ _ + (RUCCPADJ_ – RUCCSADJ_ ) + ( DAEP_ _ – DAES_ _ ) + ( RTQQEPADJ_ _ – RTQQESADJ_ _ )

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 38 RUC Shortfall Highlights (3) RUC Shortfall at Snapshot / RUC Shortfall at Adjustment Period

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 39 RUC Shortfall Highlights (4) Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Shortfall at Snapshot by QSE, for each RUC Process, for each 15-minute Settlement Interval of the Operating Day. RUCSFSNAP_ _ = Max (0, (( RTAML_ _ ) *4) – RUCCAPSNAP_ _ )) Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Shortfall at Adjustment Period by QSE, for each RUC Process, for each 15-minute Settlement Interval of the Operating Day. RUCSFADJ_ = Max (0, (( RTAML_ _ ) *4) – RUCCAPADJ_ ))

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 40 RUC Shortfall Highlights (5) RUC Shortfall / RUC Shortfall Total / RUC Shortfall Ratio Share

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 41 RUC Shortfall Highlights (6) Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Shortfall by QSE, for each RUC Process, for each 15-minute Settlement Interval of the Operating Day. RUCSF_ _ = Max (0, Max (RUCSFSNAP_ _, RUCSFADJ_ ) – RUCCAPCREDIT_ z ) This calculation must be calculated for each RUC Process. The RUCCAPCREDIT used for the QSE must be the sum of all RUCCAPCREDIT, for that QSE, from all previous RUC Processes calculated for the Operating Day. Requirement IDFR3 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #)PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Shortfall Ratio Share by QSE, for each RUC Process, for each 15-minute Settlement Interval of the Operating Day. RUCSFRS_ _ = RUCSF_ _ / RUCSFTOT_ Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Shortfall Total for each RUC Process, for each 15-minute Settlement Interval of the Operating Day. RUCSFTOT_ = RUCSF_ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 42 RUC Shortfall Highlights (7) RUC Capacity Credit

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 43 RUC Shortfall Highlights (8) Requirement IDFR1 Source Mapping (Protocol/NERC/FERC and other binding documents Ref #) PR (1), PR (a) Traceability to Sub-Process MapsWill be completed August 31, 2006 Description: Calculate RUC Capacity Credit by QSE for each RUC Process of the Operating Day. RUCCAPCREDIT_ _ = Min [RUCSF_ _, (RUCCAPTOT_ * RUCSFRS_ _ )] This calculation must be calculated for each RUC Process. The value calculated will be used in the RUCSF calculation of all future RUC Processes for the Operating Day if the shortfall of that RUC Process resulted in a RUC Capacity-Short Charge for the QSE.

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 44 Summary The following Protocol versions were used as the basis of Reliability Unit Commitment (RUC) Settlements requirements: –Section 4 (006NPRR as approved by BOD on 07/18/2006) –Section 5 (003NPRR as approved by PRS on 06/22/2006) –Section 6 (009NPRR as approved by PRS on 07/20/2006) –Section 9 (007NPRR as approved by BOD on 07/18/2006)