Last week first slide: Planning “Best Guess” Short Plan “best guess” – collared coils 102/104 “dry test" next week – Mirror MBHSM101 : collared coils 105/101.

Slides:



Advertisements
Similar presentations
LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
Advertisements

January 6. January 7 January 8 January 9 January 10.
Christian Löffler Collaring to cold mass finishing 2 Outline Available tooling and operational status CMM of 5.5m coils Instrumentation Pairing.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
CERN 4 th /5 th December 2012 Todays speaker Paul Allen 1.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
SunSatFriThursWedTuesMon January
SBS Magnet and Infrastructure Status Robin Wines July 2015.
HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003.
SBS Magnet and Support Status Robin Wines June 2013.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
ECE 192: NATCAR Team (Triton X) Sponsored by IEEE ( Vincent Bantigue, Joseph Formanes,
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
REGULATION TIMELINE For the April 13, 2010 BOT Meeting * Regulations concerning Admissions, Tuitions & Fees and Articulation are considered select regulations.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
Chris Booth Sheffield 29th March 2006
HL-LHC Magnet components and assemblies
MQXC Nb-Ti 120mm 120T/m 2m models
Model magnet test results at FNAL
11 T Dipole Integration & Plans M. Karppinen
HQ Mirror Assembly R. Bossert
Rodger Bossert/Shlomo Caspi
11T Dipole – Single Aperture 2m Model
Teleconference ACS – FREIA 17th October 2017
FRESCA2 Update on the dipole design and new calculations
Teleconference ACS – FREIA 31st October 2017
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Glyn Kirby Magnet AssemblyTechniques.
Support Structure Fabrication
MBHSP02 test STATUS and first results
the MDP High Field Dipole Demonstrator
MKQXF FEA Model Haris Kokkinos
Teleconference ACS – FREIA 20th February 2018
QXF schedule and milestones
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
SPS Planning meeting for LS2 #18 Vacuum sectors situation
Budker Institute of Nuclear Physics,
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Presentation transcript:

Last week first slide: Planning “Best Guess” Short Plan “best guess” – collared coils 102/104 “dry test" next week – Mirror MBHSM101 : collared coils 105/101 full collaring week 09 (24 Feb- 2 March) – Will be used for mirror magnet (Mirror #1) – Magnet to be assembled ! To be checked with Friedrich – collared coils 106/107 : – Instrumented in the press for March 19 – Collaring completed on April 1 – Magnet #1 completed,being cooled down for May, 5  March 31  April 14  May 19 Please note that the talk scheduled for today’s meeting, about "magnet assembly in 180”, is postponed until next week (January 30)

Mirror MBHSM101, Coils 101 & 105 Collaring 26 feb 5 weeks Magnet Assy in 180, as from 19 March 8 weeks Bottleneck: ! Yokes ! Coil CMM

Model MBHSP101, Coils 106 & weeks BEFORE 2D COLLARING weeks BEFORE 2D COLLARING Bottlenecks: Parts Supply 2d instrumented pack 2d set of Ti poles

Splitting of Assembly Tasks More task holders, to replace missing staff due to LS1 activities: needed urgently Collared Coils Half Yokes End Plates + Bus + Instrum Magnet Assy, Shell welding QA/Testi ng Syncing 927?????? 180?Friedrich?

To do: check drawings and report status for next week!

Next Week Agenda TopicSpeakerJust-in-Time Milestone 180 Assembly ReadinessFriedrichMarch, 19 Yoke Assembly Readiness?March, 10 Mirror Collaring Readiness?Collaring starts Feb, 24