POIWG 1/26/2015 Mana Vautier 01.26.15 This presentation is intended solely for the audience to which it is directed. MISSION AND PROGRAM INTEGRATION (MAPI)

Slides:



Advertisements
Similar presentations
SIM Data Infrastructure Status FFY Q1, SIM Data Infrastructure Status Driven by HealthInfoNet Overall Data Infrastructure Status:Mixed Status Summary.
Advertisements

Calibration Stand Update
Contamination Cleanup Grant Program Implementation Workshop.
Project management Topic 3 Directing a project. Overview of processes Authorise Initiation Authorisation for Initiation Stage Authorise the Project Contract.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting August 8, 2007.
1 Astronomy and Astrophysics Advisory Committee Astrophysics Division FY2008 Budget February 8, 2007 Rick Howard Astrophysics Division Director (acting)
March 8, 2011 Portfolio Analysis and Management System (PAMS) Briefing for the Fusion Energy Sciences Advisory Committee Linda G. Blevins, Office of the.
SRC Application Process Fall 2014 Version: November 12, 2014.
The Best Zoo Web Programming money can't buy. That's right. You can't buy web programming like this. That's why we're giving it away for free!!!
IT Strategic Planning From Technical Dreams to Institutional Reality
Development and Quality Plans
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April/May 2012.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – January 2013.
Strategic Plan Elements: ISRU, Analog Outpost Mike Duke November 10, 2008.
Aerosonde User’s Workshop Wallops Aerosonde UAV Facility Mission Proposing And Costing Factors Chuck Williams.
Maximizing ISS Utilization for Small Satellite Deployments and External Hardware/Sensor Testing Photo credit: NASA.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
June 5, Use of the district’s financial resources is key to the ongoing operations : Facilities Transportation Food Service Staff Development.
HUMAN SETTLEMENTS PORTFOLIO COMMITTEE MORTGAGE DEFAULT INSURANCE COMPANY (MDIC) UPDATE MARCH 2013.
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
Transition to 6-person crew ASE conference, Praha Oct 8, 2009 Andreas Schön, ESA All dates used in this presentation are examples only, they do not necessarily.
ESE System Components Knowledge Base Part of Cross-Cutting Solutions IBS Project Status Report – Feedback Welcome.
Shuttle Mission: STS-117 Atlantis Launch/Landing Date: June , 2007 Assembly Elements: S3/4 Truss Segment with Photovoltaic Radiator and 3 rd Set.
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
 Advanced Metering Working Group (AMWG) Update to RMS 1 August 5, 2014.
Page 1 ESA ODF Control Board # Mar. 04 Columbus Flight ODF Status.
S&I Standards Organization Engagement & Communication Plan DRAFT Standards Support Team 1 September 2011.
1 Business Integration Update to PRS January 19, 2012.
1 2009/10 DIVISION OF REVENUE BILL Presentation to Select Committee on Finance 24 February 2009.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
1 Based on PMI the Methodology. 2 This document has a sole propriety owner. © 2015 i-Clipse Technology, a Private Canadian Corporation. All rights reserved.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
NCI Clinical Trials Reporting Program CTRP User Meeting June 6, 2012 Gene Kraus CTRP Program Director.
MEPAG Meeting February 27, 2013 web meeting David Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
Page No. 1 ISS_CM_019 (Rev 01/2011) Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 07/27/2011 Increment Manager/Melissa Owens Increment.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Approved for Public Release; Distribution is Unlimited Ricardo Rodriguez.
Sponsoring Org/Office Code: VIPER Office / OM3 Name of Forum: POIWG Date: 07/21/2014 Significant ISS Attitude Events 06/ /2015 Presenter: Jose Ruiz.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
UNMJobs Next Steps September 30 & October 2, 2008.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Safety Review Panel (PSRP) Process Updates/Status International Space.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
GTFORCIDI Summary of mandates and proposal for streamlining sectoral ministerial processes.
Module 4: Structuring the District Implementation Team for Success
Please review these important Webinar Etiquette guidelines
Introductory Remarks and Meeting Goals
The International Space Station (ISS)
TEMPO’s Commercially Hosted Payload Concept
Building Coordinators
Procurement Updates Lynn Rodgers, USDA, FNS
Common rule update: continuing review
IRRS REFRESHER TRAINING Lecture 7
Presentation transcript:

POIWG 1/26/2015 Mana Vautier This presentation is intended solely for the audience to which it is directed. MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT Russian Module Status

MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT | 2 Purpose/Agenda Purpose: Provide updated status on Russian modules, including MLM, Node and SPM. Select the appropriate box below:  Request for Technical Concurrence  Request for Partial Implementation  Request for Full/Final Implementation  Information Only/Management Direction  Response to an Action Item Agenda: (list major topics of the presentation): MLM Node SPM Russian Module TEAs Summary MLM SPM Node

MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT | 3 Multipurpose Laboratory Module (MLM) Overview: Designed to support Russian payloads, Russian ECLSS, crew quarters and stowage locations. Will dock to Service Module (SM) Nadir port (in place of DC-1) –DC1 will be undocked from SM by departing Progress after MLM launch Status: Metal & Non-metal contaminants found in prop system (4Q 2013) MLM transferred from RSC-E testing facility to Khrunichev manufacturing facility (Dec 2013) Cleaning and repairs are underway Contam levels for external payloads from MLM have been completed by ENV team –No exceedances identified Final testing and launch prep at Baikonur launch facility will take 9 months Launch date: NET May 2017

MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT | 4 Node Module Overview: Pressurized module designed to facilitate expansion of the ISS RS Will dock to MLM Nadir port Status: Currently located at RSC-E testing facility –Node will remain at test facility until MLM transfer to Baikonur launch site Launch date: MLM launch + 6 months –Currently scheduled NET Nov 2017

MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT | 5 Science Power Module (SPM) Overview: Designed to provide power and additional scientific resources to the Russian segment Will soft dock to Node Nadir, then be relocated to a lateral port via SPM robotic arm Final docked position on Node is TBD –Existing protocol signed by NASA and RSC-E states Node port –Not yet signed by Roscosmos Status: RSC-E has agreed to Node port location with gyrodynes Roscosmos would have to approve and fund the addition of the gyrodynes for this to occur Preliminary contam levels for SPM show possible exceedances at ELC 1, 3 & 4; JEM EF 2, 4 & 6; Columbus SDN, SDX & SOX Launch date: NET 2020

MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT | 6 MLM And Node Bounding Tea Cases TEAs listed are expected ranges, however ISS can be anywhere within the ISS attitude envelope listed in SSP YawPitchRoll Pre-MLM Max: Min: Max: Min: Post-Node Max: Min: Post-MLM, Pre-Node

MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT | 7 SPM TEA Cases +XVV natural TEA ranges with SPM on Node starboard +XVV natural TEA ranges with SPM on Node port RollPitchYaw Max Min RollPitchYaw Max Min

MISSION AND PROGRAM INTEGRATION (MAPI) CONTRACT | 8 Russian Module Status Summary MLM and Node launch delays will slip TEA range updates to NET mid-2017 –Further updates to launch date will occur once MLM propellant system cleaning and repairs are closer to completion Contamination levels for external payloads from MLM have been completed by environments team –No exceedances identified Contamination levels for Node and SPM are in work by environments team –Completion date TBD SPM launch date is now NET 2020 Discussions with NASA and Roscosmos on SPM final dock location are ongoing –Final decision will be released via SPM integration CR