1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for 2004-2005 run Multibunch.

Slides:



Advertisements
Similar presentations
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Advertisements

Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
1 ATF Status LCPAC K.KUBO Introduction Emittance Single bunch and multi-bunch in DR Extracted beam Wiggler study Other experiment, Instrumentation.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
ATF2 project in the ATF international collaboration, including coordination issues Junji Urakawa, KEK ATF2-IN2P3-KEK kick-off meeting Annecy, LAPP, for.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Linear Collider For Japan-US HEP Program Committee May, 2003 Nobu Toge (KEK, Accelerator Lab)
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
CLIC Damping ring beam transfer systems
Oversea collaborators
Fast Ion Experiments at ATF
Junji Urakawa (KEK) for ATF International Collaboration
ATF Intrabeam Scattering Results
Junji Urakawa ( for collaborators ) March KEK at LNF
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
CLIC damping rings working plan towards the CDR
Instability measurement plans at ATF
Presentation transcript:

1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch emittance Instrumentation developments Plans for run 第1回加速器学会年会 8/04/2004

2 ATF Introduction Multibunch Photo-cathode RF gun,  f-ECS S-band Linac GLCTA beam line expansion E=1.28GeV Ne=1x10 10 e-/bunch 1 ~ 20 bunches Rep=1.5Hz X emit=2.5E-6( at 0 int.) Y emit=2.5E-8( at 0 int.) E=1.28GeV Ne=1x10 10 e-/bunch 1 ~ 20 bunches Rep=1.5Hz X emit=2.5E-6( at 0 int.) Y emit=2.5E-8( at 0 int.) ATF Damping Ring

3 Single bunch Transverse Emittance by Laser wire X emittance determined by Ring Design. Measured data points are fit to simulation. Y emittance =6.5pm at GLC intensity, is below GLC design.

4 Multibunch photo-cathode RF gun Gun cavity High quality Multibunch beam is generated.

5 Multibunch emittance Beam intensity in DRBeam intensity in DR ~ 0.7 x10 10 e -, 20 bunch, 2.8ns spacing with 0.78Hz repetition Monitors of MB emittanceMonitors of MB emittance MB (or projected) Laser-wire Projected SR interference monitor, X-ray SR monitor Fast Ion effect on MB emittanceFast Ion effect on MB emittance big energy fluctuation at tail bunch big projected emittance at tail bunch Beam intensity in DRBeam intensity in DR ~ 0.7 x10 10 e -, 20 bunch, 2.8ns spacing with 0.78Hz repetition Monitors of MB emittanceMonitors of MB emittance MB (or projected) Laser-wire Projected SR interference monitor, X-ray SR monitor Fast Ion effect on MB emittanceFast Ion effect on MB emittance big energy fluctuation at tail bunch big projected emittance at tail bunch

6 Major emittance monitors Tungsten Wire Scanner Laser Wire Scanner SR Interference Monitor X-ray SR Monitor

7 Laser wire scanner in DR for X & Y scan, for single/multi-bunch TEM00 wire TEM01 wire Two optical cavity chamber For X-wire and Y-wire

8 Multibunch Vertical Emittance by Laser wire Blowup at tail bunch is seen.

9 Preliminary result of Fast Ion Instability simulation Behavior of Y emittance is very similar. Schematic of the Fast-Beam Ion Instability simulation

10 DR vacuum pressure Low emittance was observed at DR pressure < 4 x10 -7 Pa Emittance growth observed with vacuum pressure > 4 x10 -7 Pa, even small bunch charge. Low emittance was observed at DR pressure < 4 x10 -7 Pa Emittance growth observed with vacuum pressure > 4 x10 -7 Pa, even small bunch charge. 20 bunch, 1 train = 52mA ~15 A.hour (ex. 150mA.100hours)

11 DR scrubbing status GLC intensity: 20 bunch, 1 train = 52mA: 3 train = 156mA ~5.5 A.hour 45 hours 150mA EXT kicker pressure dominant 6/12/2004 ~ 6/14/2004

12 Multibunch Vertical Emittance after 9.3 A.hours scrubbing Projected Y emittance is around 1% from X, However, insufficient tuning of Y emittance.

13 Emittance of each bunch after 9.3 A.hours scrubbing No big tail rise was seen, However, insufficient tuning of Y emittance. Scrubbing seems to be effective

14 Instrumentation developments ODR beam size monitorODR beam size monitor beam size measurement was performed. FEATHER / FONT studyFEATHER / FONT study basic data taking of collision feedback nm resolution cavity-BPMnm resolution cavity-BPM 3 cavity BPM setup (SLAC, KEK) under commissioning, under installation ODR beam size monitorODR beam size monitor beam size measurement was performed. FEATHER / FONT studyFEATHER / FONT study basic data taking of collision feedback nm resolution cavity-BPMnm resolution cavity-BPM 3 cavity BPM setup (SLAC, KEK) under commissioning, under installation

15 ODR(Optical Diffraction Radiation) beam size monitor beam size monitor Achieved resolution ~10µm

16 FEATHER stripline Kicker FEATHER BPM Fast feedback control study for collision feedback for collision feedback FEATHER(KEK), FONT(UK) Collision feedback

17 Cavity BPM nm resolution study (SLAC) LLNL Design mover, Improved electronics, installed Mar Still under commissioning

18 KEK nm-BPM study 3 cavity BPM system 1 cavity BPM under checking. 1 mover stage done. 2 more under fabrication. Active mover & nm sensor are preparing. Reference monitor & optical anchor is under study. KEK cavity BPM Active Mover & nm sensor & nm sensor

19 Other Developments in ATF Wiggler studyWiggler study Additional correction PS for residual kick is preparing. Damping time and emittance will be tested in fall-run. X-Y coupling at extractionX-Y coupling at extraction Multi-pole component of kicker and septum is under study. S-band detuned structure studyS-band detuned structure study Basic study of new detuned method is now under way. Fast sweep LW at EXT plan (UK)Fast sweep LW at EXT plan (UK) Fast sweep over multibunch scan is now under planning. Laser pulse stacking method for LWLaser pulse stacking method for LW Pulse stacking chamber is now under installation. Wiggler studyWiggler study Additional correction PS for residual kick is preparing. Damping time and emittance will be tested in fall-run. X-Y coupling at extractionX-Y coupling at extraction Multi-pole component of kicker and septum is under study. S-band detuned structure studyS-band detuned structure study Basic study of new detuned method is now under way. Fast sweep LW at EXT plan (UK)Fast sweep LW at EXT plan (UK) Fast sweep over multibunch scan is now under planning. Laser pulse stacking method for LWLaser pulse stacking method for LW Pulse stacking chamber is now under installation.

20 ATF Plans for MB emittance studyMB emittance study More small Y emittance will be confirmed soon. More small Y emittance will be confirmed soon. Wiggler studyWiggler study Damping time and emittance will be confirmed with wiggler ON. Damping time and emittance will be confirmed with wiggler ON. Extraction of low emittance beamExtraction of low emittance beam multi-pole component of kicker and septum are under study. multi-pole component of kicker and septum are under study. nm resolution BPM test & demonstrationnm resolution BPM test & demonstration Development of new precise mover & new cavity-BPM electronics(SLAC). Development of new precise mover & new cavity-BPM electronics(SLAC). KEK version of cavity BPM and active mover development are under way. KEK version of cavity BPM and active mover development are under way. combination of two system for study of active stabilization. combination of two system for study of active stabilization. Fast feedback test & demonstrationFast feedback test & demonstration Basic test of feedforward and feedback are under way. (FEATHER/FONT) Basic test of feedforward and feedback are under way. (FEATHER/FONT) Fast feedback test by 3 train extraction will be done. Fast feedback test by 3 train extraction will be done. Instrumentation developmentsInstrumentation developments LW(Kyoto, UK), XSR monitor, ODR monitor, MB-BPM, etc. LW(Kyoto, UK), XSR monitor, ODR monitor, MB-BPM, etc. MB emittance studyMB emittance study More small Y emittance will be confirmed soon. More small Y emittance will be confirmed soon. Wiggler studyWiggler study Damping time and emittance will be confirmed with wiggler ON. Damping time and emittance will be confirmed with wiggler ON. Extraction of low emittance beamExtraction of low emittance beam multi-pole component of kicker and septum are under study. multi-pole component of kicker and septum are under study. nm resolution BPM test & demonstrationnm resolution BPM test & demonstration Development of new precise mover & new cavity-BPM electronics(SLAC). Development of new precise mover & new cavity-BPM electronics(SLAC). KEK version of cavity BPM and active mover development are under way. KEK version of cavity BPM and active mover development are under way. combination of two system for study of active stabilization. combination of two system for study of active stabilization. Fast feedback test & demonstrationFast feedback test & demonstration Basic test of feedforward and feedback are under way. (FEATHER/FONT) Basic test of feedforward and feedback are under way. (FEATHER/FONT) Fast feedback test by 3 train extraction will be done. Fast feedback test by 3 train extraction will be done. Instrumentation developmentsInstrumentation developments LW(Kyoto, UK), XSR monitor, ODR monitor, MB-BPM, etc. LW(Kyoto, UK), XSR monitor, ODR monitor, MB-BPM, etc.

21 endend