SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

An SiPM Based Readout for the sPHENIX Calorimeters Eric J. Mannel IEEE NSS/MIC October 30, 2013.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
6/7/20121 PHENIX WEEKLY PLANNING 6/7/2012 Don Lynch.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
The Tungsten-Scintillating Fiber Accordion Electromagnetic Calorimeter for the sPHENIX Detector Craig Woody, for the PHENIX Collaboration Physics Department,
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
3/29/20121 PHENIX WEEKLY PLANNING 3/29/2012 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
4/5/20121 PHENIX WEEKLY PLANNING 4/5/2012 Don Lynch.
5/3/20121 PHENIX WEEKLY PLANNING 5/3/2012 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
Aki Maki1 GLD Costing Aki Maki KEK 27/4/2006. Aki Maki2 Cost Summary 27/04/06 GLD COST SUMMARY –Solenoid Magnet**-** B JPY –Cryogenic System***** B JPY.
7/31/2014 PHENIX WEEKLY PLANNING July 31, 2014 Don Lynch 1.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
3/8/20121 PHENIX WEEKLY PLANNING 3/8/2012 Don Lynch.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
3/22/20121 PHENIX WEEKLY PLANNING 3/22/2012 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
6/5/ PHENIX WEEKLY PLANNING June 5, 2014 Don Lynch.
3/1/20121 PHENIX WEEKLY PLANNING 3/1/2012 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
4/19/20121 PHENIX WEEKLY PLANNING 4/19/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
NUMI Update on Steel, Coils, Fixtures, and Prototyping J.K. Nelson 12/98 MINOS Meeting.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
DON LYNCH DECEMBER 4, AGENDA December 4, BABAR Magnet Update Outer HCal Structural Analysis (Assembly and Support) sPHENIX Project Management.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Roberto Calabrese Ferrara University and INFN
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Presentation transcript:

sPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014

sPHENIX Mechanical Design sPHENIX “Outie” Concept

April 10, 2014sPHENIX Mechanical Design sPHENIX “Innie” Concept

April 10, 2014sPHENIX Mechanical Design HCal Central Pedestal V1 “Outie” V2 “Innie”

April 10, 2014sPHENIX Mechanical Design sPHENIX Engineering: Major Subsystems/Subtopics: Magnet (BABAR) (Magnet Div) Hadronic Calorimeter (HCAL) (PHENIX) EM Calorimeter EMCal (PHENIX) VTX (RIKEN) DIRC (?) VTX additional layers (RIKEN) Carriage Support structure (PHENIX) Readout Electronics (PHENIX) Infrastructure (PHENIX ++) Electrical Power Services (PHENIX) Instrumentation Support (Signal trays & Racks) (PHENIX) Cryo Services (CAD) Cooling water (CAD) Safety Systems (PHENIX ) Work Platforms and Access/Egress Structures (CAD) HVAC (CAD) PHENIX Decommissioning (CAD, PHENIX) System Integration (PHENIX) Testing (PHENIX) Analyze requirements Installation (PHENIX, CAD) commissioning (PHENIX)

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Conceptual design options tradeoff studies innie vs outie including cost estimates initial prototype(s) final design concept production estimates Production prototype design/drawings (single module) production prototype tools, techniques, procedures and fixtures production prototype test planning production prototype fabrication & procurement production prototype test(s) assembly final design assembly tools, techniques, procedures and fixtures assembly fabrication & procurement assembly planning final assembly of all modules acceptance/qualification testing 4/1-5/1/14 5/1-11/1/14 11/1-12/1/14 3/1/15 4/1/15 7/1/15 9/1/15 10/1/15 11/1/15 2/1/16 4/1/16 6/1/16 12/1/16 12/1/17 2/1/17

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Conceptual design options Innie (only if selected) Inner Steel Plate Outer Steel Plate Inner Scintillator Outer Scintillator Inner steel Inner connection/spacer bars Inner steel Outer connection/spacer bars Outer steel Inner connection/spacer bars Outer steel Outer connection/spacer bars Light collection module Test LED holder Light tightness Detector local electronics Inner HCal Module end steel plates Inner HCal Module connection inner Inner HCal Module connection outer Outer HCal Module end steel plates Outer HCal Module connection inner Outer HCal Module connection outer Basic HCal structural Support concept Outie Inner Steel Plate Outer Steel Plate Inner Scintillator Outer Scintillator Inner connection bars Outer connection bars Light collection module Test LED holder Light tightness Detector local electronics Module end steel plates Module connection inner Module connection outer Basic HCal structural Support concept

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) tradeoff studies innie vs outie including cost estimates Physics performance studies FEA stress and magnetic force analyses Cost quotations Steel Scintillator Electronics Light collection modules HCal basic structural support Decision point

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Initial prototype(s) Design Analyses and calculations Drawings Procurement & Fabrication Assembly Test Planning Testing Evaluation

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) final design concept Final design, analyses and calculations Drawings

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Production estimates Procurement/Fabrication documentation Solicit Bids Evaluate Bids

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Production prototype design/drawings (single module) Layout Module Assembly Detail drawings Inner Steel Outer Steel Ends Connction brackets Inner Scintillator Outer Scintillator Light Collection Test signal distribution

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Production prototype tools, techniques, procedures and fixtures Assembly Plan Module stacking fixture(s) Handling fixtures Alignment tools

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Production prototype test planning identify facility for test test facility prep planning documentation and review (WP’s/ESR’s)

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Production prototype fabrication & procurement

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Production prototype test(s)

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Assembly final design

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Assembly tools, techniques, procedures and fixtures

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Assembly fabrication & procurement

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Assembly planning

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Final assembly of all modules

April 10, 2014sPHENIX Mechanical Design Hadronic Calorimeter (HCAL) (PHENIX) Acceptance/qualification testing