Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
SESAME Storage Ring RF-System
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
X-ray Booster IR Linac Harmonic RF RF Systems for NSLS-II J. Rose, A. Blednykh, N. Towne With help from many others at BNL and other institutions.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
ANNEX. WP 1.04, Michael Ebert2MAC PETRA-III Review Meeting, DESY,29th November 2006 Sandblasted Center Conductor of a Cavity Input Coupler R a =
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
SESAME STORAGE RING RF-SYSTEM SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
RF systems for NSLS-II J. Rose, A. Blednykh, P. Mortazavi and Nathan Towne BROOKHAVEN SCIENCE ASSOCIATES.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
February 2010 ALBA Synchrotron Light Source Francis Perez.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
PETRA III, A New High Brilliant Light Source At DESY
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
650 MHz Solid State RF Power development at RRCAT
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
ALBA RF Systems Francis Perez.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015.
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
Areal RF Station A. Vardanyan
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Report Technical Director Storage-Ring-Installation Completed
Status of BESSY II and bERLinPro
PETRA III at DESY Hamburg/Germany
PETRA III, Status and Upgrade
High Energy Proton Synchrotrons
Notkestrasse 85, Hamburg, Germany
BEPCII RF POWER SOURCE AND INPUT COUPLER
Accelerator Layout and Parameters
An overview the ASTRID2 storage ring and its RF system
Machine Operation and Progresses in SSRF
CEPC RF Power Sources System
PETRA IV System design concept Old and new machine
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Status of the ASTRID2 RF systems
Accelerator Physics Particle Acceleration
RF introduction Anders Sunesson RF group leader
ERL Director’s Review Main Linac
Status and New Developments of ALBA RF Systems
CEPC SRF Parameters (100 km Main Ring)
Parameters Changed in New MEIC Design
RF Parameters for New 2.2 km MEIC Design
JLEIC electron ring with damping wigglers
Presentation transcript:

Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA III RF: Frequency: f RF = MHz Beam Power (100mA) : P beam = 759 kW (dipol, undulators, damping wigglers and HOM losses) Circumferencial Voltage:U c = 20 MV (in 12 7-cell cavities, power per coupler: 124 kW) rf-Power (100mA) : P rf = 1573 kW (2 transmitter á 786 kW) Mashine: Beam Energy: E 0 = 6 GeV Beam Energy: E 0 = 6 GeV Length: l = 2304 m Length: l = 2304 m Arc radius m and m Arc radius m and m Beam Current: I 0 = 100 mA (200 mA) Beam Current: I 0 = 100 mA (200 mA) loss per turnU l = MeV loss per turnU l = MeV Emittance (hor)ε = 1 nmrad ! Emittance (hor)ε = 1 nmrad ! Topping up Topping up Main parameter:

Stefan Wilke, DESY MHF-e 2 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND the new experiment hall one of 34 moduls on girder 1m grounding: >6000 m 3 concrete Around 850 concrete mixers came to DESY when the concrete monolithic slab (280 m x 24 m x 1 m) of the new PETRA III experimental hall was poured. It took nearly 60 hours without any interruption.

Stefan Wilke, DESY MHF-e 3 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Changes at the RF system - removal of all 16 cavities and reinstallation of 12 cavities - assembly of new klystron modulators (HV power supplies instead of tubes) - removal of all old electronic and cables and replace by new technique (ELWIS) - reconstruction of the waveguide distribution system - development, test, assembly and commissioning of new control-, regulation- and diagnostictechnique - new high voltage power supply - commissioning of both 500 MHz systems design and construction of feedback-cavities assembly and commissioning of the feedback-system

Stefan Wilke, DESY MHF-e 4 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND changes by time hall SL tunnel SL

Stefan Wilke, DESY MHF-e 5 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND transmitter power supply klystrons outdoor equipment hall SL hall SL new crowbar data of 1 system: 80kV / 38A data of 1 system: 80kV / 38A work largely done work largely done system tested as possible yet system tested as possible yet tested with klystrons at 60kV / 20A tested with klystrons at 60kV / 20A

Stefan Wilke, DESY MHF-e 6 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND RF-system of PETRA III Waveguide Power Distribution 7-cell cavities MT Waveguide Power Distribution 400 kW Load Interconnection Line MT. WG-Shutter 100 kW Load 400 kW Load 800 kW Klystron 4-Port Circulator Phase- Shifter Transmitter Hall PETRA-SRTransmitter Hall PETRA-SL PETRA Tunnel 3 dB Hybr. Coupler Normally each transmitter drives its own 6 cavities. Option to run one transmitter on all 12 cavities. 800 kW Klystron 3 dB Hybr. Coupler 100 kW Load WG-Shutter Phase- Shifter 3 dB Hybr. Coupler Waveguide-Shutter 7-cell cavities WG-Shutter 800 kW Klystron 4-Port Circulator 100 kW Load 400 kW Load Phase- Shifter Phase- Shifter prototype

Stefan Wilke, DESY MHF-e 7 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Waveguide Power Distribution 3,04,86,07,07,8 to SR from transmitter SL Interconnection Line

Stefan Wilke, DESY MHF-e 8 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Feedback Kicker-Cavity Modified DAΦNE / PSI design - 8 ports - tuneable: 1315 – 1435 MHz - bandwidth: 140 MHz - R/Q: 73 Ω - quality factor (unloaded): pieces made at DESY 1435 MHz 1315 MHz 6 14

Stefan Wilke, DESY MHF-e 9 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Feedback Kicker-Cavity

Stefan Wilke, DESY MHF-e 10 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Feedback Kicker-Cavity

Stefan Wilke, DESY MHF-e 11 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND next steps tunnel closed: 27 st oct. (for magnet power supply tests) testing the software system commisioning of llrf system interlock tests conditioning of the cavities high power tests adjustment of waveguide system at high power 2009: feedback adjustment with beam beam for users

Stefan Wilke, DESY MHF-e 12 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND The MHF-e team thank you