First Ideas – New Wire Scanner GUI - LHC V. Kain, G. Crockford, M. Kuhn Emittance Working Group 6/26/2013 1.

Slides:



Advertisements
Similar presentations
Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.
Advertisements

Tina design review Main design decisions. Top level modules. Responsibilities. Phases A & B. Test plan. Time table.
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team 28 January 2009 Presented by Elliott McCrory.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Beam instrumentation performance overview session 6: system operational performance Mariusz Sapinski on behalf of BE/BI LHC Beam Operation Workshop Evian.
Document Management System. Introduction How to use the Document Management System.
Off-momentum tail scraping for passive abort gap cleaning (MD 444) D. Mirarchi, R. Bruce, S. Redaelli On behalf of the LHC Collimation Team LHC Study Working.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
Wire scanner controls at SLAC. Subgroup for one emittance measurement station Wire to select Scan range Park position Selection x,y,u Single scan Start.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
LHC Coping with Emittance Measurement Challenges in the LHC after LS1 Gentner Day October 2014 An Overview of Control and Data Flow Related to LHC Emittance.
Integrating QDEC with Slicer3 Click to add subtitle.
8/12/2000Guy Crockford BI days New application software for SPS wire scanner controls G.Crockford SL/OP.
LHC LHC Emittance Measurements and Preservation LBOC Meeting July 28, 2015 Maria Kuhn – July 28, 2015 Many thanks to G. Baud, E. Bravin, B. Dehning, J.
LHC LHC Wire Scanner Application Manual oOverview: 1 M. Kuhn - 12/03/2015.
Chapter 8 (Horstmann’s Book) Frameworks Hwajung Lee.
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
PROBLEM 1 Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
LHC OP Tools - Applications (1) o2 new timing users, new dynamic destination oPower converters – settings (for base optics):  Parameters, optics, beam.
LHC LHC performance with low-emittance h=9 beam Focus on emittance preservation M. Kuhn, H. Bartosik, B. Dehning, A. Guerrero Ollacarizqueta, V. Kain,
LHC Emittance Preservation MD 3 - Preliminary Results M. Kuhn, V. Kain, G. Arduini, J. Emery, W. Hofle, A. G. Ollacarizqueta, F. Roncarolo,
SQL Query Generator User Interface Analyzer Logger DB Manager Grammar Test Framework Embedded DB Random Query GeneratorMulti DB Query Result AnalyzerAnalysis.
LHC Updates on the LHC Wire Scanner Application --- Transverse Emittance Blow-up during the LHC Ramp Verena Kain, Maria Kuhn 1 11/12/2013.
EPICS and LabVIEW Tony Vento, National Instruments
LHC First LHC Emittance Measurements at 6.5 TeV Emittance Meeting August 26, 2015 Maria Kuhn – August 26, 2015 Many thanks to G. Baud, E. Bravin, B. Dehning,
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
BWS E. Piselli – J. Emery On behalf of the BWS working group people.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Optimization of beam envelop at the injection point of PS Chenghui Yu Jan. 30, 2012.
Message Source Linguistic Channel Articulatory Channel Acoustic Channel Observable: MessageWordsSounds Features Bayesian formulation for speech recognition:
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
LHC RT feedback(s) CO Viewpoint Kris Kostro, AB/CO/FC.
LSA Core overview 6 / 11 / 2007 Wojciech Śliwiński (AB-CO-AP) on behalf of LSA team.
LHC LHC Wire Scanners: Updates on Measurement Accuracy Emittance Meeting 18 November 2015 Maria Kuhn – 18 November 2015 Many thanks to G. Baud, E. Bravin,
Statistics 2015 Fixed Target CT/MTE and LHC BRIGHTNESS Eric Veyrunes, Johan Dalla-Costa, Diego Perez.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Fabio Follin Delphine Jacquet For the LHC operation team
LHC Wire Scanner Calibration
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
Automatic emittance measurement in the CERN 1.4 GeV Booster
Slice Parameter Measurements at the SwissFEL Injector Test Facility
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
MD #453 Effect of low frequency noise
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
MD2036: UFO dynamics studies and UFO fast detection
LHC wire scanners status
Job workflow Pre production operations:
LHC Emittance Measurements and Preservation
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
BLM settings management in LSA
Transverse emittance measurements from FWS
I-LHC NOMINAL ions beam in 2007
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Commissioning Experience
Measurement of the beam (transverse) emittances
LHC An LHC OP guide… under construction J. Wenninger
Presentation transcript:

First Ideas – New Wire Scanner GUI - LHC V. Kain, G. Crockford, M. Kuhn Emittance Working Group 6/26/2013 1

Motivation  Make more user friendly for –Nominal operation –MDs  Hide expert interface 2

Improvements for nominal operation (1)  Create LSA parameter for nominal settings –Load to frontend with sequencer –Monitor on application  Injection sequencer sets circulating + next injected bunch pattern for each new injection  Automatically use optics for resident beam process. –Display used optics name –Use measured optics if available in DB for beam process.  Can launch scans for all 4 scanners in one go. –Application looks after scheduling.  To be investigated if useful/feasible: launch scans via sequencer 3

Improvements for nominal operation (2)  Average emittance of all bunches for log book.  Emittance and integral of absolute of residuals per bunch as bar graph  Automatic logging of emittance results after each scan –Also logging optics ID  Can retrieve profiles from logging and refit 4

Improvements for MDs  Launch Multiple Scans –Display emittance/beam sigma versus time (also subscribe to energy and  *, optics ID) –Display mean versus time –Or…average over multiple scans 5

GUI - mockup 6

Plans  Will work on the basis of a framework –Can be extended by plugins –Several developers can contribute…  Basic framework should be ready end of summer