FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.

Slides:



Advertisements
Similar presentations
Workshop for Local Legislators and Participating Officials May 7, 2008 City of Las Cruces Doña Ana County Do ñ a Ana MDWCA Town of Mesilla Anthony WSD.
Advertisements

BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
LRGWUO New Mexico Lower Rio Grande Regional Water Plan Presentation to the Interstate Stream Commission: July 21, 2004 Lower Rio Grande Water Users Organization.
WinTR-20 Course February Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
Terrain for the Lower Colorado River Flood Damage Evaluation Project Erin Atkinson, Halff Associates, Inc. Rick Diaz, Lower Colorado River Authority Symposium.
Restoration of the Rio Grande Between El Paso, Texas and Ciudad Juarez, Chihuahua Restoration of the Rio Grande Between El Paso, Texas and Ciudad Juarez,
Water Management Section, Sacramento District, US Army Corps of Engineers Climate Impacts on Reservoir Rule Curves Stu Townsley Chief, Water Management.
US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management.
COMMUNITY PRESENTATION
Hydrology and Hydraulics. Reservoir Configuration.
Upper Brushy Creek Flood Study – Flood mapping and management Rainfall depths were derived using USGS SIR , Atlas of Depth Duration Frequency.
Long Term Storage Long term storage means to store water during high inflows years for the benefit of low inflows years. Long term storage means to store.
Hoover Dam – Colorado River. Reasons for Dams Flood Control 39,000 dams worldwide higher than 15 m (ICOLD, 1988)
Oregon Flood Hazard Data Standard v2.0 Summary of Proposed Amendment Collaborative Effort of: Jed Roberts (DOGAMI), Steve Lucker & Christine Shirley (DLCD)
BUILDING STRONG ® South Platte CWMS Model Missouri Basin Forecasters Meeting January 29, 2014 South Platte CWMS Model Missouri Basin Forecasters Meeting.
Hydraulic Screening and Analysis Needed for USACE Review
New Mexico Texas Water Commission Update for Good Neighbor Environmental Board June Bobby Creel & John Burkstaller New Mexico Water Resources Institute.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation 1-Dimensional Modeling CWPPRA Technical Committee and.
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
Hydrologic Models for Urban Floodplain Mapping and Damage Reduction in Brownsville, TX Philip Bedient Rice University CEE Department Houston, Texas March.
Nile Hydrology Preliminary Research Anthony Makana Paris
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
Use of GIS in Determination of the Probable Maximum Flood at Nuclear Plant Sites Presented by: Monica Anderson, GISP Tennessee Valley Authority Carrie.
International Boundary and Water Commission United States and Mexico Presentation to USGS Study Tour April 18, 2007 El Paso, TX.
Flow Estimation in the Wood River Sub-Basin. Study Motivation To estimate an historical record at the mouth of the Wood River. –Enables comparison of.
VILLAGE OF PATCH, NM, FEASIBILITY STUDY Village of Patch Case Study Seattle Environmen tal Planning Class June, 2009 US Army Corps of Engineers Albuquerque.
MA BF REFERENCE CURVES Objective Develop bankfull regional curves and equations for estimating bankfull width, mean depth, cross-sectional area, and discharge.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
FLASH FLOOD PREDICTION James McDonald 4/29/08. Introduction - Relevance  90% of all national disasters are weather and flood related  Central Texas.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.
March 2009WinTR-20 Course1 Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
Engineering Hydrology (ECIV 4323)
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
Channel Routing Simulate the movement of water through a channel
Channel Routing Simulate the movement of water through a channel
Analysis of Slide Impacts on the North Fork Stillaguamish River Floodplain For Snohomish County May 5, 2014.
“Update Existing Flood Inundation Mapping”
“Rio Grande del Norte”. Facts about the Rio Grande The Rio Grande is a river that flows from southwestern Colorado in the Unites States to the Gulf of.
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
New Orleans Hurricane Protection System Overview by Mike Park HPS Program Manager Task Force Hope U.S. Army Corps of Engineers March 19, 2008.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
FLO-2D Model Development Rio Grande Canalization Project Reach Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
A Sediment Budget for Two Reaches of Alameda Creek (1900s through 2006) Paul Bigelow, Sarah Pearce, Lester McKee, and Alicia Gilbreath.
Focus Group Meeting: November 12, 2013 Truckee River Water Quality Standards Review.
Introduction to Urban Hydrology
CADSWES Engineering Enhancements New Methods and Improved Functionality Steve Setzer.
U.S. Department of the Interior U.S. Geological Survey Reston, Virginia (703) NHD Flow and Velocity Project Greg Schwarz, Reston,
Impacts of Salinity on El Paso’s Surface Water Supply presented at the Annual Salinity Management and Desalination Summit December 8, 2003 Michael P. Fahy.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
Present and Future Water Supplies to Meet El Paso Demands Presentation to NM-TX Water Commission August 20, 2004 by Michael Fahy El Paso Water Utilities.
Rio Grande Rectification Reach FLO-2D Model Development Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council Project.
Scarcity on the Upper Rio Grande Valley (WORK IN PROGRESS) GIS FOR WATER RESOURCES, FALL
US Army Corps of Engineers BUILDING STRONG ® Proposed Floodplain Inundation Mapping on the Flathead River Travis Ball Hydraulic Engineer
OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA Rene Vermeeren, P.E., D.WRE Chief, Hydrology and Hydraulics Branch Los Angeles.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
2006 Flood in El Paso TX.
Channel Routing Simulate the movement of water through a channel
Channel Routing Simulate the movement of water through a channel
Introduction to Urban Hydrology
Hydrologic River Routing
Risk Mapping, Assessment, and Planning
Floods and Flood Routing
Sacramento Environmental Commission January 2019.
Presentation transcript:

FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.

Canalization Reach - Caballo to American Dam Flo-2D model development complete Tributary studies – gaging analysis

Basic (Big Flood) Results Area of Inundation Flood hydrographs every 250 ft of channel Flood wave attenuation Levee deficiency and overtopping

Area of Inundation Maps

Flood Hydrographs 2004 Calibration Results Haydon Gage

2004 Calibration Results Leasburg Gage

2004 Calibration Results Mesilla Gage

2004 Calibration Results Anthony Gage

Floodwave Attenuation

Levee Freeboard Deficiency

Levee Deficiency Code was written to track the maximum loss of levee freeboard as requested by IBWC. This can be reviewed as an option in MAXPLOT (also in Mapper by swapping files).

Potential future benefits Flood risk and hazard assessment Flood mitigation – raise levees Local flood details – levee elevations, wasteways, urban flooding Revise flood hydrology River operations River maintenance response River restoration response

Resolved Issues Which hydrology and dam release to use Diversion dam operation during flooding How do wasteways function during flooding Levee deficiency Road embankments – detail for local flooding Sediment loading

Return Period Flood Modeling The various return period tributary flood inflows using the revised hydrology were simulated with the typical irrigation release of 2,350 cfs. Return period floods were: 2-yr, 5-yr, 10-yr, 25-yr, 50-yr, 100-yr

Sediment Yield To determine an appropriate sediment supply to the RGCP, it was recommended that the sediment load analysis be refined Update the NRCS reservoir survey data

Sediment Yield from NRCS Reservoir Surveys WatershedNRCS Name Drainage Area Resurvey (yrs) Average Annual Sediment Yield Revised 2005 Average Annual Sediment Yield UnderwoodCaballo # WassonCaballo # South SalemCaballo # ApacheABM # Pena BlancaABM # MossmanABM # Bishop's CapABM # FillmoreFillmore Arroyo # SalopekFillmore Arroyo # Lower FillmoreFillmore Arroyo # Tortugas # Tortugas # Dona AnaDoña Ana # North Fork ArroyoDoña Ana # RodneyHatch Valley # Hatch Valley #5aAverage Hatch Valley #2Std. Dev Hatch Valley #30.51 Hatch Valley #60.19 Average Std. Dev

Sediment Yield Equation The equation for total sediment load Q T was of the form: Q T = A 1 + A 2 A b + A 3 Log (A b) where: A 1, A 2, and A 3 are regression coefficients and A b is the basin area.

Sediment Load Adjustment Sediment yield per unit area was plotted as f(basin area). A decreasing power function could be applied to adjust the sediment yield equation as function of the basin area. The derived adjustment equation was: F a = 5.69 * A b ( ) where: F a is the adjustment factor

Tributary Inflow Gage analysis

BI-NATIONAL PROJECT KICK-OFF MEETING October 18, El Paso, TX Rectification Reach – American Dam to Ft. Quitman

This Project Will Result In A Functional, Calibrated, Two-Dimensional Flood Routing Model For The Rio Grande Between American Dam and Fort Quitman, Texas Overall Goal Plus Ancillary Products!

Rectification Reach – Water Operations Limited to flood control operations at Caballo Dam and Reservoir Input Hydrographs at American Dam (Results from Canalization Reach FLO-2D) + Tributary Contributions

PROJECT TIMELINE  The entire project will take 1 year to complete  Hydrology – 60 days  Tributary Sediment Analysis – 90 days  Hydrographic Data Collection (Cross Sections) – 120 days  FLO-2D Model Development – 90 days  FLO-2D Model Calibration – 30 days  Final Report – On-Going throughout Study

HYDROLOGY Develop Flood Hydrographs at Significant Tributary Confluences with Rio Grande

Reach Based Effort –Tributary Models American side Mexican side

The End October 18, 2005