1 James N. Bellinger University of Wisconsin-Madison 30 January 2008 DCOPS Software Report.

Slides:



Advertisements
Similar presentations
Electric Bus Management System
Advertisements

P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
The Control System for the ATLAS Pixel Detector
MIS 2000 Class 20 System Development Process Updated 2014.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Target Control Electronics Upgrade 08/01/2009 J. Leaver P. Smith.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
CURE International Keith Wagner Clayton Hughes Tyler Alexander Ryan Tierney.
Large Wheel Installation Helped with initial installation in 2005 Installed EML and EMS chambers in sector frame. Last chamber installed 31 October 2006.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
AS Computing Software definitions.
Software; Nature, Capabilities and Limitations: describe the need for interfacing with peripherals storage devices, input and output devices and display.
1 James N. Bellinger University of Wisconsin-Madison CMS Week June 2010 Coordination: Things to do Coordination: James N. Bellinger CMS week 2010.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
A. Aimar - EP/SFT LCG - Software Process & Infrastructure1 Software Process panel SPI GRIDPP 7 th Collaboration Meeting 30 June – 2 July 2003 A.Aimar -
EGEE is a project funded by the European Union under contract IST Build Infrastructure & Release Procedures Integration.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
4/5/2007Data handling and transfer in the LHCb experiment1 Data handling and transfer in the LHCb experiment RT NPSS Real Time 2007 FNAL - 4 th May 2007.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Module 4: Systems Development Chapter 14: Design And Implementation.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Online Reconstruction 1M.Ellis - CM th October 2008.
19/05/10FV 1 HyTec crate – DCS integration issues.
Franco Carbognani, EGO LSC-Virgo Meeting May 2007 Status and Plans LIGO-G Z Software Management.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
CMS Luigi Zangrando, Cern, 16/4/ Run Control Prototype Status M. Gulmini, M. Gaetano, N. Toniolo, S. Ventura, L. Zangrando INFN – Laboratori Nazionali.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Testing Dojo – Intelligence Information Team – 11/05/2015.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
CMS Luigi Zangrando, Cern, 16/4/ Run Control Prototype Status M. Gulmini, M. Gaetano, N. Toniolo, S. Ventura, L. Zangrando INFN – Laboratori Nazionali.
Maria del Carmen Barandela Pazos CERN CHEP 2-7 Sep 2007 Victoria LHCb Online Interface to the Conditions Database.
1 James N. Bellinger 26-Feb-2008 DCOPS DAQ Control Main DAQ Runs on Linux Data directly to Oracle Controlled via DIM Errors presented via DIM PVSS component.
Project Services and Status reports Project Leader:Penelope Constanta Stakeholders:CD Project and Activity Leaders Resources: Ruth, Pordes, Penelope Constanta,
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
University of Wisconsin at Madison
University of Wisconsin at Madison
CLAS12 DAQ & Trigger Status
Controlling a large CPU farm using industrial tools
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
EIN 6133 Enterprise Engineering
Systems Design, Implementation, and Operation
University of Wisconsin-Madison
Software Development Process
University of Wisconsin at Madison
University of Wisconsin-Madison
Presentation transcript:

1 James N. Bellinger University of Wisconsin-Madison 30 January 2008 DCOPS Software Report

2 James N. Bellinger 30-January-2008 Effort Division Main DAQ PVSS controls Supplementary programs Commissioning tests Upgrades requested

3 James N. Bellinger 30-January-2008 Main DAQ Milestones Test bug fixes Finish the day after hardware is operational Package code and libraries Requires 1 day for simple package Package accepted by DCS Final shakedown No problems expected

4 James N. Bellinger 30-January-2008 PVSS Controls Milestones Package fwDCOPS component: (Learning how) Integrated with CMS’ PVSS hierarchy: (Learning how) Install component on CMS machine: at CERN Successful DCOPS control in situ : at CERN Successful generic control by hierarchy : at CERN Successful readback of data w/ final chain Package accepted by DCS Non-expert successfully operates panel : at CERN

5 James N. Bellinger 30-January-2008 PVSS Controls Time Estimates Package fwDCOPS component Integrated with CMS’ PVSS hierarchy 1-3 days to communicate and modify. Both of the above in parallel? Install component on CMS machine Successful DCOPS control in situ Successful generic control by hierarchy Requires someone at CERN to work with me. XiaoFeng? 1 day if no problems. If hardware is working all three of these may be tested in a day. N days if have to iterate. Successful readback of data w/ final chain Day after successful test above Package accepted by DCS No idea. Non-expert successfully operates panel Need a volunteer to attempt to use the system

6 James N. Bellinger 30-January-2008 Panel In Use Communicating with fake readout at Wisconsin

7 James N. Bellinger 30-January-2008 Supplementary Software Complete and test Single-Line readout 2-3 days

8 James N. Bellinger 30-January-2008 Commissioning Tests Read out Transfer Lines Readout: day after hardware is operational Analysis: day? Depends on what we find UPDATE: Hardware is partly operational

9 James N. Bellinger 30-January-2008 Commissioning Tests: 1 Transfer Line 1 ME+4 Transfer Line 2 ME+3ME+2ME+1 No data for MABs

10 James N. Bellinger 30-January-2008 Commissioning Tests: 2 Transfer Line 3 ME+4 Transfer Line 4 ME+3ME+2ME+1 No data for MABs

11 James N. Bellinger 30-January-2008 Commissioning Tests: 3 Transfer Line 5 ME+4 Transfer Line 6 ME+3ME+2ME+1 No data for MABs

12 James N. Bellinger 30-January-2008 Upgrades Requested Online display of profiles Modify Main DAQ to support profile thumbnails Creation Buffering (present on demand) Space reserved on panel, needs coding No effort is scheduled for this project Expert control interface Turn off/on readout for unused DCOPS Turn off/on writing profiles to database Requires 1-2 days of documentation if we use DID