Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.

Slides:



Advertisements
Similar presentations
Handling Liquid Cryogens Safely Tony Kent School of Physics and Astronomy.
Advertisements

Oxygen Deficiency Hazards ODH SAF 103 Patty Hunt.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Ana-Paula Bernardes EN-STI-RBS
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
Overview of the HVAC system of the Accelerator tunnel Duy Phan Accelerator Safety Engineer Reviewed by Mikael Kelfve (CF)
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Patrick Thornton, SNS/FPE June 9, 2008
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
NATIONAL INSTITUTE OF AEROSPACE TECHNOLOGY Rosa Mª Rengel Gálvez Marina B. Gutiérrez García-Arias 11/09/2007 Rosa Mª Rengel Gálvez Marina B. Gutiérrez.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
Hall D Target System Review J. FochtmanSeptember 28,2011 Preliminary Design Work.
Task Force on Safety of Personnel in LHC underground areas following the sector 34 accident of 19-Sep-2008 Status report LPC 07/05/2009 B. Delille, S.
Spectrometer Solenoid Test Plan Workshop: Safety Considerations Steve Virostek - LBNL February 17, 2012.
PRESENTATION OF CFD ACTIVITIES IN CV GROUP Daniel Gasser.
Safety Concept and Tests Fakultaet Maschinenwesen, Institut fuer Energietechnik, Bitzer-Stiftungsprofessur für Kaelte-, Kryo- und Kompressorentechnik Jülich,
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
Sandra Nilsen et. al Determination of Hazardous Zones Case study: Generic Hydrogen Refuelling Station.
ORNL is managed by UT-Battelle for the US Department of Energy Considerations for Engineering (and other) Controls for Oxygen Deficiency Safety Kelly Mahoney.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Safety related issues of the unexpected Argon release into the tunnel Maciej Chorowski, Ziemowit Malecha, Jarosław Poliński.
Numerical modelling of cold helium safety discharges from the cryogenic distribution line Jonathan Persson MSc. Engineering Physics AD and ICS Retreat.
Vacuum tank relief for Super-FRS long multiplet cryostat CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang.
UITF ODH Assessment UITF Safety Review May 10, 2016.
E. Da Riva, S. E. Wojnarska PS Ventilation - Smoke extraction -
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Overview of the ESS Linac Cryogenic Distribution System
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
First Outcome of the Task Force on Safety of Personnel in LHC underground areas following the sector 34 accident of 19-Sep-2008 R. Trant on behalf of the.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
2 K Coldbox Safety and ESH
EHN 1 CO2 Leaks inside the beam lines
Neutrino Platform Overall Protodune Risk Mitigation Plan O
HEL – Safety aspects Christelle Gaignant
Keeping LHC cold during LS periods Preliminary proposal
Block 4 and Cluster D - Safety
Ana-Paula Bernardes EN-STI-RBS
Sandia National Laboratories
ESS elliptical cryomodule
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Jaroslaw Fydrych SHC Lead Engineer
Helium collector CFD analysis
Summary of the presentation:
Burst Disc Experiences at CEA Test Stand
J. Fleiter, S. C. Hopkins, A. Ballarino
Design and integration of safety equipment and safety aspects in the LHC tunnel (cryogenic safety only) Vittorio Parma Th.Otto.
Presentation transcript:

Duy Phan, EN-STI-RBS

Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns are burns that take place as the result of skin coming in contact with an object or a fluid that is extremely cold Why assessing these hazards?  Presence of a cryogenic installation involving helium inside the HIE-ISOLDE facility  Several people working in the vicinity of cryogenic fluids  Request from the HSE Unit to carry out a Risk Assessment How assessing these hazards?  Calculation tool provided by the HSE Unit and based on REFPROP (EDMS )  Visits on site  Computational Fluid Dynamics simulations (CFD)

ODH ANALYSIS OF THE HIE-ISOLDE FACILITY 3

Main Objectives Determine the concentration of O2 that would remain in the atmosphere in case of accidental release of Helium (liquid or gas) Step 1 Define the location and the number of ODH equipment (sirens, alarms, etc.) to be installed in the areas subject to potential oxygen deficiency Step 2

Scope of the ODH analysis Bldg. 198 Compressor building Bldg. 199 Cold box building Bldg. 170 LINAC tunnel Case 1 Case 2 Case 3 [Acknowledgement: S. Maridor]

Methodology chosen Name: Safety Form OHS – ODH Calculation (EDMS ) Purpose: Preliminary analysis used to calculate the quantity of fluid that could be accidentally released in an installation and define, with the help of the HSE Unit, adequate control measures to mitigate the risks or reduce their consequences. Room properties Fluid properties O2 concentration and volume released

1st case – bldg compressor building NameStateVolumePressureTemperature Heliumgas 2*80 m 3 2 bars ≤ P ≤ 15 bars 300 K PROPERTIES OF THE FLUID SurfaceHeightVolumeFree volume 218 m²7.34 m1600 m 3 75 % PROPERTIES OF THE ROOM HYPOTHESIS CONSIDERED FOR THE ODH ANALYSIS The worst case scenario concerning pressure has been considered for the analysis  Pressure = 15 bars The ventilation system is not taken into consideration No interlock considered to stop the release of helium SCENARIO CONSIDERED Leak on the transfer line connecting the helium buffer tanks to the compressors Ground level Platform Helium compressor station Working platform Crane Outside Helium tanks [Acknowledgement: S. Maridor]

1st case – bldg compressor building RESULTS (cf. ODH Preliminary Assessment - Compressor building 198 – EDMS ) Case considered – Enriched gas layer Height of the gas layer = 5.31 m 7.34 m 5.31 m Necessity to install ODH detectors to alert operators working at height in case of accidental release of helium

2nd case – bldg. 199 – cold box building PROPERTIES OF THE FLUID SurfaceHeightVolumeFree volume 190 m²4.5 m855 m 3 40 % PROPERTIES OF THE FIRST LEVEL HYPOTHESIS CONSIDERED FOR THE ODH ANALYSIS Loss of cold box content has been discarded  no impact on O2 concentration The ventilation system is not taken into consideration No interlock considered to stop the release of helium In case of helium flush all the helium would accumulate on the first floor NameStateVolumePressureTemperature Heliumliquid 1 m bars4.5 K SCENARIO CONSIDERED Loss of helium from the Dewar through the safety valve due to loss of insulation vacuum First floor Ground level opening Dewar Cold box [Acknowledgement: S. Maridor]

Case considered – Homogeneous mixture Volume of gas discharged = 719 m 3 O2 after discharge = 0 % 1st floor 2nd case – bldg. 199 – cold box building RESULTS (cf. ODH Preliminary Assessment – Cold box building 199 (dewar) – EDMS ) Necessity to install ODH detectors to improve the efficiency of the evacuation of the building

3rd case – bldg. 170 – LINAC tunnel NameStateVolumePressureTemperature Heliumliquid 0.16 m bars4.5 K PROPERTIES OF THE FLUID SurfaceHeightVolumeFree volume m²4 m m 3 86 % PROPERTIES OF THE LINAC TUNNEL HYPOTHESIS CONSIDERED FOR THE ODH ANALYSIS Other scenarios discarded  no release of helium inside the tunnel No interlock considered to stop the release of helium Natural ventilation is not taken into consideration SCENARIO CONSIDERED Loss of helium from one of the cryomodules due to an internal rupture of the insulation vacuum Cryomodules [Acknowledgement: S. Maridor]

Case considered – Homogeneous mixture Volume of gas discharged = 117 m 3 O2 after discharge = 11.6 % 3rd case – bldg. 170 – LINAC tunnel RESULTS (cf. ODH Preliminary Assessment – HIE-ISOLDE tunnel building 170 – EDMS ) Necessity to install ODH detectors due to the small volume of the tunnel and the significant quantity of LHe released in case of an accident

LocationScenario Hypothesis adopted concerning helium behaviour Hazard acceptability Presence of ODH detectors Compressor building (bldg. 198) Leak on the transfer line Stratification due to warm helium Potentially unsafe Requested due to the presence of operators at height Cold box building (bldg. 199) Release of helium through the safety valve of the Dewar Homogeneous mixture due to effect of cold helium convection Potentially unsafe Requested due to the short time needed to create an ODH in the area LINAC tunnel (bldg. 170) Release of helium through the rupture disk of a cryomodule Homogeneous mixture due to effect of cold helium convection Potentially unsafe Requested due to the short time needed to create an ODH in the area Summary of the results of the ODH analysis

Outputs from the visit of the HIE-ISOLDE facility – Bldg. 198 CONTROL MEASURES TO BE IMPLEMENTED 2 ODH detectors connected to: 2 flashing lights located inside the building 1 evacuation siren Ground level Platform ODH flashing lights ODH detectors

Outputs from the visit of the HIE-ISOLDE facility – Bldg. 199 CONTROL MEASURES TO BE IMPLEMENTED 2 ODH detectors connected to: 4 flashing lights located inside the building 1 evacuation siren 1 dynamic extraction system with an extraction flow of m3/h (11 ACH) to avoid any accumulation of helium ODH flashing lights ODH detectors First floor

Outputs from the visit of the HIE-ISOLDE facility – Bldg. 170 CONTROL MEASURES TO BE IMPLEMENTED 2 ODH detectors connected to: 4 flashing lights located inside the building 2 flashing lights near the entrances of the tunnel 1 flashing light on the working platform located above the tunnel ODH flashing lights ODH detectors

CFD OF A RELEASE OF HELIUM INSIDE THE LINAC TUNNEL 17

Why carrying out a CFD in the LINAC tunnel? Is access possible during steady state? 6 Cryomodules Internal rupture of the insulation vacuum of one of the cryomodules Scenario considered for the simulation [Acknowledgement: Y. Leclercq]

Hypothesis considered for the simulations Volume available in the tunnel ~ 260 m3 Set pressure of the burst disk: 1.5 bar absolute Masse of helium released = 20 kg (0.16 m3) Leak temperature: Tmin = 15 K, Tmax = 40 K Mass flow through the burst disk: Qmin = 5 kg/s, Qmax = 8 kg/s 90° orientation of the burst disk

‘REFERENCE-CASE’ Volumetric concentration of O 2 [%] 5 m Evolution of the concentration of O s [Acknowledgement: E. Da Riva] 5 m

‘REFERENCE-CASE’ Temperature [K] Evolution of the temperature s [Acknowledgement: E. Da Riva] 5 m Technical solutions still under discussion Routing of the safety relief device of the vacuum vessel outside the tunnel Emptying of the cryomodules before intervention (steady-state only) Listing and prioritisation of the interventions to be carried out in the tunnel

CONCLUSION 22

23 Essential information The study has confirmed the presence of ODH in all the locations assessed (bldg. 198, 198 and LINAC tunnel) Different scenarios leading to an oxygen deficiency atmosphere have been identified but only some of them have been considered for the ODH analysis ODH analysis is a process that should be carried out in several steps… …and can require additionnal studies for complex installations (CFD) A layout of an ODH installation has been proposed following a collaboration between EN/STI, GS/FB, GS/ASE, EN/CV and TE/CRG The implementation of the ODH layout has been done in such a way that operators working in areas subject to ODH would be quickly alerted in order to evacuate in the most efficient way

THANK YOU FOR YOUR ATTENTION… 24 Acknowledgements A-P. Bernardes (EN/STI), E. Da Riva (EN/CV), G. Camplone (EN/CV), G. Lindell (DGS/SEE), N. Delruelle (TE/CRG), N. Broca (GS/ASE), Y. Leclercq (TE/CRG), S. Maridor (EN/MEF), M. Dole (GS/ASE) Contact: