January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
The ILC Global Design Effort Barry Barish EPP2010 Cornell University 2-Aug-05.
GDE Report to FALC Status and Plans Barry Barish FALC Fermilab 4-Nov-05 ILC Polarized Electron Source.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Operations, Test facilities, CF&S Tom Himel SLAC.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
September 20, 2005Margaret Votava1 ILC Controls Planning.
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC Project Management Status
Report on plan to produce an Engineering Design Report
Yamamoto WG3: ML-SCRF Parallel Session,
Technical Design Report preparation
ILC Global Design Effort
Barry Barish GDE Caltech
Andrei Seryi Materials for discussion TILC-08
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
Presentation transcript:

January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial Forum –Slides 2-7 courtesy of Barry Barish Control perspective –In support of Reference Design Report Argonne and Fermilab are interested Plus others SLAC, DESY, etc –In support of R&D work Argonne is committed to R&D work for the global group effort directly Fermilab is commited in Main Linac R&D which requires LLRF control systems, plus supporting controls and interfaces (eg, cryo, MPS)

January 9, 2006 Margaret Votava 2 Global Design Effort –The Mission of the GDE Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan, siting analysis, as well as detector concepts and scope. Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.)

January 9, 2006 Margaret Votava 3 Approach to ILC R&D Program Proposal-driven R&D in support of the baseline design. –Technical developments, demonstration experiments, industrialization, etc. Proposal-driven R&D in support of alternatives to the baseline –Proposals for potential improvements to the baseline, resources required, time scale, etc. Develop a prioritized DETECTOR R&D program aimed at technical developments needed to reach combined design performance goals

The GDE Plan and Schedule Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Technical Design Bids to Host; Site Selection; International Mgmt LHC Physics

January 9, 2006 Margaret Votava 5 Area Systems e- sourcee+ source Damping RingsRTML Main LinacBDS KurikiGao E.S. Kim Hayano Yamamoto (MDI Ch) ???Guiducci PT Lilje Angal- Kalinin BrachmannSheppardWolski Adolphsen Solyak Seryi

January 9, 2006 Margaret Votava 6 Technical Systems Vacuum systemsSuetsuguMichelatoNoonan Magnet systemsSugaharaBINP ??Thompkins CryomoduleOhuchiPaganiCarter Cavity PackageSaitoProchPadamsee RF PowerFukudaSaclay ??Larsen InstrumentationUrakawaBurrowsRoss Dumps and CollimatorsKEK ?? Accelerator PhysicsKuboSchulte?? Global Systems Commissioning, Operations & ReliabilityTerunumaElsenHimel Control SystemMichizonoSimrockCarwardine CryogenicsHosoyamaTavianPeterson CF&SEnomotoBaldyKuchler InstallationShidaraBialwons??

January 9, 2006 Margaret Votava 7 How and when to involve industry? Large Scale Project Characterization –Large Project Management –Precision Engineering –International Coordination –Costing Industrialization –Civil Construction & Infrastructure –Cryogenics –Superconducting RF structures, couplers, etc –Electronics and Control Systems –Large Scale Computing

January 9, 2006 Margaret Votava 8 Controls Global Group Major immediate milestones –Complete requirements gathering exercise by March 11th. –Complete first draft costing and RDR write-up by July 18th. Major challenges –Master Timing and RF distribution –High Availabilty Overall machine availability at 85% –Fast Feedback/Feed forward –Global operations R&D –ATCA Evaluations –Diagnostic Interface Layer modeled after Intelligent Platform Management (IPM)

January 9, 2006 Margaret Votava 9 Controls for Main Linac R&D FNAL collaborating with DESY, LBL, SNS, UPenn –Local test beam needs to interface to local subsystems Several test stand/beam areas setup at Fermilab to test various Linac components. All will need LLRF. –LLRF controls has several ongoing R&D efforts DESY Developed board(s) SNS developed board Commercial electronics –Can be used as testbed for Controls Global group R&D? Process control –Subsystems have a heterogeneous mix of control systems: Doocs, Epics, MATLAB, Labview, ACNET –Interfacing them altogether has not been seamless.