21-10-0237-00-0000 November, 2010Peretz Feder IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: 21-10-0237-00-0000 Title: Liaison Report – 802.16 Work Date Submitted:

Slides:



Advertisements
Similar presentations
Project Planning Adhoc Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE /0027r2 Date Submitted:
Advertisements

IEEE n-11/0001 Session # TGn Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0001.
Session # TGn Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE gman-10/0036 Date Submitted:
Project Planning Committee (PPC): Session #70 WG Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Comment-Resolution-Update Title: , July 2006, Comment Resolution.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: GPP Requirements ad hoc Report Date Submitted: September,
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #21, Big Island Closing Plenary Date Submitted: September, 2007.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #17, Dallas Closing Plenary Date Submitted: November, 2006 Presented.
IEEE n-11/ Session # n GRIDMAN TG Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0002.
21-07-xxxx IEEE MEDIA INDEPENDENT HANDOVER DCN: xxxx Title: Problem Scenario Date Submitted: September, 2007 Presented at.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: FMCA MIH Work Item Date Submitted: March, 2009 Presented at IEEE.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Comments Date Submitted: Jan, 06, 2006 Presented at IEEE
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented.
IEEE n-11/ Session # n GRIDMAN TG Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0008.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Melbourne Closing Plenary Date Submitted: September, 2006 Presented at.
Project Planning Committee (PPC): Session #67 Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
Project Planning Committee (PPC): Session #68 Closing Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE ppc-10/0010.
Project Planning Committee (PPC): Session #69 WG Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
IEEE MEDIA INDEPENDENT HANDOVER DCN: 100 Title: Cross Domain Trigger and Handover Talking Points Date Submitted: July 13, 2004.
IEEE n-11/0012 Session # TGn Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0012.
IEEE DCN: SAUC Title: TG Closing Note Date Submitted: November 14, 2013 Presented at IEEE session #59 in Dallas, Texas,
Project Planning Committee (PPC): Session #70 WG Opening Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
IEEE Working Group on Mobile Broadband Wireless Access
Project Planning Committee (PPC): Session #68 Closing Report
IEEE Presentation Submission Template (Rev. 9) Document Number:
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
IEEE C /36 Project IEEE Working Group on Mobile Broadband Wireless Access Title Proposed Work Plan.
IEEE MEDIA INDEPENDENT HANDOVER
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER
IEEE MEDIA INDEPENDENT HANDOVER
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
IEEE MEDIA INDEPENDENT HANDOVER DCN: xxx
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
IEEE MEDIA INDEPENDENT HANDOVER DCN: bcast
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
IEEE MEDIA INDEPENDENT HANDOVER SERVICES
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
REVP Session #59 Minutes IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP Title: m Session #59 Closing Report Date Submitted:
IEEE MEDIA INDEPENDENT HANDOVER
IEEE MEDIA INDEPENDENT HANDOVER DCN: bcast
IEEE DCN: Title: TG Closing Note Date Submitted: September 17, 2015
IEEE MEDIA INDEPENDENT HANDOVER
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Session # n GRIDMAN TG Closing Report
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP Title: m Session #71 Closing Notes Date Submitted: November 12, 2015 IEEE session.
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP Title: m Session #74 Opening Notes Date Submitted: May 16, 2016 IEEE session.
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER SERVICES
IEEE MEDIA INDEPENDENT SERVICES DCN:
IEEE MEDIA INDEPENDENT HANDOVER DCN: bcast
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP Title: m Session #72 Opening Notes Date Submitted: January 18, 2016 IEEE session.
IEEE MEDIA INDEPENDENT HANDOVER DCN: xx
IEEE MEDIA INDEPENDENT HANDOVER
IEEE MEDIA INDEPENDENT SERVICES DCN:
IEEE MEDIA INDEPENDENT SERVICES DCN:
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Your Title Here
IEEE MEDIA INDEPENDENT HANDOVER
IEEE MEDIA INDEPENDENT SERVICES DCN:
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Presentation transcript:

November, 2010Peretz Feder IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Liaison Report – Work Date Submitted: November, 2010 Authors or Source(s): –Peretz Feder Abstract: liaison - Dallas

November, 2010Peretz Feder –IEEE presentation release statements This document has been prepared to assist the IEEE Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE-SA Standards Board Operations Manual and in Understanding Patent Issues During IEEE Standards Development Section 6.3 of the IEEE-SA Standards Board Operations Manualhttp://standards.ieee.org/guides/opman/sect6.html#6.3

November, 2010Peretz Feder IEEE Liaison Report Dallas – Nov 10 Peretz Feder Alcatel-Lucent Technologies

November, 2010Peretz Feder Active Projects Session #70 in Dallas P802.16m: – Advanced Air Interface. Sponsor Ballot recirculation – Approved (extension request this week) –Roger to seek Revcom Conditional Approval. P802.16n - Higher Reliability Networks Gridman – Approved –Developing System Requirements Document (SRD) –Focus: performance-related requirements –Developing System Architecture Reference Model (SARM) P802.16p - Machine-to-Machine Applications – Approved –Developing Machine to Machine (M2M) SRD P802 Maintenance Task Group Continuing to meet and conduct ongoing WG maintenance activities

November, 2010Peretz Feder m Sponsor Ballot Rec 3 Into Session #70: –One SDD CR –SB 3nd recirculation: 88% return rate; 89% approval (29 disapprove votes) SB Comments to be resolved at Session #79 on D9 Amendment Text –259 non-editorial: »159 MAC »3 Maintenance »34 PHY »6 General »57 Other –85 editorial comments 120 contributions –67 MAC –19 PHY –3 Femto/SON –1 Multi-BS MIMO –8 Relay –2 LBS –3 e-MBS –10 ASN.1 –7 Other

November, 2010Peretz Feder ITU-R Liaison Group Drafting several contributions. – mainly related to ITU-R Working Party 5D IMT-Advanced technology proposal – IEEE’s “WirelessMAN-Advanced” (based on m) was approved as an IMT-Advanced technology ( ) – Final submission due in March 2011 – Follow up contributions and liaison statements are in development

November, 2010Peretz Feder p This week M2M started as a WG Updating the SRD, hoping to complete Focus: –Performance requirements –Baseline the SRD –Work Plan, schedule Further discuss and decide the level of details for the SDD Discuss whether to proceed and develop a System Architecture Reference Model (SARM) 7

November, 2010Peretz Feder n Draft TGn GRIDMAN Timetable Greater Reliability In Disrupted Metropolitan Networks Start of TG, Start SRD July 2010 CFP issued : SARM & AmendmentSept 2010 Approved SRD Nov 2010 SARM finalizedJan 2011 Interim Doc July 2011 WG LB issued Sept 2011 Recirc 1 Nov 2011 Recirc 2 Jan 2012 Sponsor Mar 2012 Approved Std Nov 2012

November, 2010Peretz Feder Project Planning Map (1/2) Study Items DescriptionProject Target TimeLine M2M p WG First Phase: New requirements for massive number of devices to be connected over 16 Networks. Study Item started: Mar 2010 WG PAR Approval: May 2010 EC PAR Approval: Jul 2010 TG Start: Nov 2010 Std Completion: Jul, 2012 Later Phase: More Advanced M2M capabilitiesTBD Hierarchical Networks Study Group Same RAT: Extensions to Advanced Air Interface (802.16m) for multi-tier deployments 802 Multi-RAT: Advanced network topologies offering high capacity at low cost Client Collaboration: Co-operation amongst clients Study item started: May 2010 WG PAR Approval: Jan 2011 EC PAR Approval: Mar 2011 TG Start: TBD Std Completion: TBD Co-existence with non- 802 TDD systems Co-existence with non-802 TDD systems. Example: TDS-CDMA, TD-LTE Study item started: May 2010 WG PAR Approval: TBD EC PAR Approval: TBD TG Start: TBD Std Completion: TBD

November, 2010Peretz Feder Project Planning Map (2/2) Study Items DescriptionProject Target TimeLine Enhanced QOE Improved quality of experience for mobile internet applications WG PAR Approval: 2011 EC PAR Approval: TBD TG Start: TBD Std Completion: TBD Ultra High Speed Networks (>1-5Gbps) (Successor to 16m) Advanced MIMO, Higher Order Modulation, Higher Bandwidths, Multicarrier WG PAR Approval: 2011 EC PAR Approval: TBD TG Start: TBD Std Completion: TBD Green RANEnergy savings at Client and Network WG PAR Approval: 2011 EC PAR Approval: TBD TG Start: TBD Std Completion: TBD

November, 2010Peretz Feder Study Groups Active Study Items: –Hierarchical Networks Study Report (802.16ppc-10/0008r1) –TDD Co-existence Study Report (802.16ppc-10/0007) Study Items completed: –M2M Study Report (IEEE ppc-10/0002r7)IEEE ppc-10/0002r7 –IEEE p M2M PAR & 5C approved now! ( ) –802.16p Task Group starts this week. –M2M early requirements (IEEE ppc-10/0011r2) discussions have now moved to the Task GroupIEEE ppc-10/0011r2

November, 2010Peretz Feder Hierarchical Networks SG 12 Hierarchical networks, encompassing multi-tier, multi-radio network architecture to achieve higher spectral efficiency and lower cost/bit capacity enhancement. Hierarchical intra-RAT networks but also including Inter-Rat No MIH proposal provided thus far, but see no objection either

November, 2010Peretz Feder Hierarchical Networks 13