Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
LINAC 4 – LLRF ELECTRONICS UPDATE BCC-42 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), D. Stellfeld,
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
Feedback and Beam Control Section (FB) Activities and Highlights 2014 Outlook Wolfgang Hofle FB Section at 2014 RF Group Meeting - December
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
PSB DSP Based Low Level RF Operational Experience. April 2015 M.E. Angoletta, A. Blas, A. Butterworth, A. Findlay, S. Hancock, M. Jaussi, J.Molendijk,
Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position.
Collected by E. Jensen, BE-RF 1 ATOP days RF limitations.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
PSB Finemet upgrade: overview, preliminary results & planning LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada (RF/FB, RF/CS)
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Injector RF and Synchrotron RF Present Status, Activities, Plans PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 1.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
RF system & magnetic PU ELENA review meeting CERN, November 2015 M.E. Angoletta, S. Hancock, M. Haase, M. Jaussi, A. Jones, J. Molendijk, M. Paoluzzi,
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
CERN LEIR Low Level RF Maria Elena Angoletta AB/RF CERN, Geneva on behalf of the LEIR LLRF team Invited Talk 55 LLRF05: Workshop on Low Level RF CERN,
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
FPGA Mezzanine Card standard IO-modules for the LLRF beam control system of CERN’s PS Booster and MedAustron synchrotron M. E. Angoletta, A. Blas, A.
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
Experience with the commissioning and operation of the new CERN Digital LLRF family M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada,
DLLRF: existing & possible applications M. E. Angoletta, M. Jaussi, J. Molendijk, J. Sanchez-Quesada CERN, BE/RF Finemet ® Review, September 2015.
An RF Low-level Beam Control system for PS Booster built in VME VXS using FMC mezzanines M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi,
Recent LLRF Developments at CERN and New Projects Wolfgang Hofle on behalf of BE-RF-FB and BE-RF-CS Section LLRF'15 Shanghai, China - W.Hofle CERN Lab.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
Digital Receiver and Modulator Architecture for Multi-harmonic RF Finemet Operation 03/11/2015 LLRF15: Digital Receiver and Modulator Architecture for.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
Digital LLRF plans at the Australian Synchrotron P.Corlett, K.Zingre, G. LeBlanc Australian Synchrotron, 800 Blackburn Road, Clayton 3168, Victoria, Australia.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
RF acceleration and transverse damper systems
CERN’s PS Complex LLRF consolidation:
Controls & software Andy Butterworth.
Lead performance throughout the injector chain with focus on LEIR
Brief Status SPS Prototype PSB Prototype Installed in LS1
LIU – SPS Low level RF Updates and schedule G. Hagmann,
Jorge Sánchez-Quesada BE-RF-FB
LIU Wire Scanner Milestones June 2017
Injectors BLM system: PS Ring installation at EYETS
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
The ELENA BPM System. Status and Plans.
Acknowledgments: LIU-PT members and deputies, H. Bartosik
LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J
Low-level RF consolidation of the CERN PS Complex machines
Beam dynamics requirements after LS2
Maria ELENA Angoletta for the RF team
Presentation transcript:

Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez Quesada, J. Simonin (CERN) U. Dorda, S. Kouzue, C. Schmitzer‎ (MedAustron) LIU 2013 event, CERN, 12 April 2013

Outline 1.DLLRF for PSB: recap run achievements (highlights) 3.Plans for LS1 4.Conclusions & outlook

DLLRF for PSB: recap M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 1  Part of global effort for all Meyrin synchrotrons’ LLRF  Big investment for the RF group (manpower).  One of the two LLRF families in BE/RF: sweeping (LEIR, PSB, ELENA...) vs. ~fixed-frequency (LHC, Linac4) machines.  DLLRF supports PSB HLRF R&D (Finemet studies or upgrade of C02,C04,C16 systems).  Collaboration with MedAustron (LLRF + HLRF).  PSB to restart with DLLRF in 04/2014 (4 rings + “ring 0”).  MA synchrotron to be commissioned with DLLRF by fall 2014.

Outline 1.DLLRF for PSB: recap run achievements (highlights) 3.Plans for LS1 4.Conclusions & outlook  Beam tests with prototype HW  Finemet R&D support + beam tests with prototype HW  Development & test of final HW+SW, BOR re-organisation…

2012 run achievements: overview Exceptional achievements in 2012 with manpower available Three parallel paths (DLLRF in PSB ring 4):  Beam tests with prototype HW  Finemet ® R&D support & beam tests with prototype HW  Development & tests of final HW + SW, BOR work  DSP + high level code upgrade  Hardware + DSP (Finemet servoloop et al.) + high level code upgrade  HW, firmware, DSP, FESA, lab tests, tools, synoptics, BOR re- organisation, DLLRF installation, beam simulator … project team members heavily involved in machines operation & other projects. M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 2

Beam results: single batch transfer What: to synchronise & extract non-equi-spaced bunches to the PS. (operational beam) How: h=2+1, maintain 30% of C02 voltage after splitting. H=2 beam synchronised to h=1 reference. PSB Ring 4 (DLLRF) Tomogram of synchronised Ring 4 with DLLRF & Rings 3 with existing LLRF. M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 3

Beam results: single batch transfer + rebucketing What: to synchronise & extract to the PS dense and short bunches. MD beam How: to generate empty bucket on h=2 beam and to synchronise the single bunch to the h=1 extraction reference. Tomogram of rebucketed & synchronised Ring 4 with DLLRF & Rings 3 with existing LLRF. M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 4 PSB Ring 4 (DLLRF)

Beam results: jump to unstable phase & back (*) (*): Many thanks to S. Hancock for his instrumental help on this topic!! What: implement MedAustron slow extraction scheme; to synchronise & extract to the PS dense & short bunches. Conceptual feasibility study. How: a controlled jump to the unstable phase, then return to the stable phase with a rotated bunch. Jump to & from stable phase Tomogram of rotated bunch after return to stable phase. M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 5

Finemet ® R&D beam results (see M. Paoluzzi’s talk) 500E10 protons (~6A) captured & accelerated (ctime 802) What: to accelerate high intensity beam with Finemet + C02 HLRF, both controlled by DLLRF (PSB Ring 4). Feasibility study. Finemet ® : 2 kV. C02: 8 kV (accel) to 1.5 kV (extr.). M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 6 How: Finemet ® phase-aligned with C02.

Development & tests of final HW & SW  Six types of modules: MDDS v 2.0, ADC v3.0, DAC v 2.0, FMC-DSP- Carrier v 1.0, RTM v 2.0, VXS Switch v 2.0.  VXS switch v 2.0 compatible with future B-train system (many discussions with TE/MSC). PSB single-ring system after LS1 DLLRF modules M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 7  Transferred 2-boards system to MA test stand for MA controls dev’pment

Development & tests of final HW & SW - 2  Firmware & DSP: many MB written & validated  It is text file → lotsa code !!  Co-operating developers / SW blocks  needed not only for exploitation but also for HW tests.  Python scripts for interactive, automatic or overnight lab test of boards HW tests: virtual test-bench. Picture courtesy of J. Sanchez-Quesada M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 8

Development & tests of final HW & SW - 3  SW tools for memory map management & automatic drivers generation.  Big investment from RF group (RF/CS section), still on-going.  To be used for all RF projects, not only DLLRF. Memory map management tool (Cheburaska ) GUI M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 9

Other developments started  Beam simulator (HW + SW)  To test DLLRF phase, radial, extraction synchro loops  Starting point: refinements & upgrades possible.  Interlock system (A. Blas, S. Zorzetti)  Interfaces DLLRF, HLRF, BIS, Chopper  Includes also Ring 0 & Finemet cavities  Available in 2015, to be operational with Linac4.  Beam-in-a-box (A. Blas, M.E. Angoletta, J. Molendijk, J. Sanchez-Quesada) Picture courtesy of A. Blas & S. Zorzetti M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 10

PSB BOR work  Equipment moved in BOR to make space for 4 rings + “ring 0” HW  All cables needed by DLLRF for operation already pulled (only rack-to-rack cabling still to be done).  Final B-train distribution, additional Ethernet, connections, timings…  DLLRF installed in BOR + HW, SW & controls commissioning. BOR cage layout for 2014 M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 11 DLLRF for ring 4 installed in BOR DLLRF follows BTrain for PPM cycle

Outline 1.DLLRF for PSB: recap run achievements (highlights) 3.Plans for LS1 4.Conclusions & outlook  PSB  MedAustron

Plans for LS1  Complete DLLRF development.  HW series production for PSB + MA. Also PSB TFB? Decision by 05/2013.  Install DLLRF in PSB BOR & carry out HW commissioning.  Renovate existing Oasis analogue digitizers. Select + have installed Oasis digitizers for DLLRF analogue signals.  Validate & re-commission BOR controls upgrade (ACCOR).  Finalise interlock system (production & validation). M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 12

Plans for LS1 (MedAustron)  Contribute to:  Summer-fall 2013: MA Finemet cavity tests (with M. Paoluzzi)  Tests will be carried out in MA test  Anticipation of development to be done for PSB Finemet tests. M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 13 Very good for CERN to gain system experience  finalise MA LLRF design & controls interface.  customise SW features.  implement MA-specific functionalities.

Conclusions & outlook  DLLRF for PSB part of global effort for all Meyrin synchrotrons.  Fruitful (win-win) collaboration with MedAustron.  Exceptional achievements before LS1:  Beam tests (PSB LLRF + Finemet ® R&D)  Development (HW, SW, tools…)  Heavy planning for LS1: PSB + MA.  MA synchrotron to be commissioned with DLLRF by fall  After LS1:  PSB to restart with DLLRF in April 2014 (4 rings + “ring 0”)  DLLRF to support full-cavity Finemet R&D or C02,C04,C16 consolidation M. E. Angoletta “Digital LLRF: achievements & LS1 plans” LIU 2013 event 14