APRIL 10, 2015. Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.

Slides:



Advertisements
Similar presentations
MapReduce Online Created by: Rajesh Gadipuuri Modified by: Ying Lu.
Advertisements

1 Project Presentation Sethu Lambu Manager, IS Production Engineering GBA573 IT Project Management Summer 2004 University of San Diego Electronic-File.
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
SE 470 Software Development Processes James Nowotarski 21 April 2003.
OTS Integration Analysis using iStudio Jesal Bhuta, USC-CSE March 14, 2006.
Software Frameworks for Acquisition and Control European PhD – 2009 Horácio Fernandes.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Title. Preliminary Design2 Agenda Overview Life Cycle Model Data Flow Data Dictionary Constraints Prototype Summary.
CategoryCapability + Recommended Tool Analysis Self Service BI with Power View integration Ad-Hoc (e.g. user defined) views Interactive analysis.
Automatic Software Testing Tool for Computer Networks ARD Presentation Adi Shachar Yaniv Cohen Dudi Patimer
Computer System Lifecycle Chapter 1. Introduction Computer System users, administrators, and designers are all interested in performance evaluation. Whether.
26-28 th April 2004BioXHIT Kick-off Meeting: WP 5.2Slide 1 WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution.
Semantic Interoperability Jérôme Euzenat INRIA & LIG France Natasha Noy Stanford University USA.
COMP 410 Update!. The Problems Story Time! Describe the Hurricane Problem Do this with pictures, lots of people, a hurricane, trucks, medicine all disconnected.
Team 20 Advisor Dr. John Keenan 2:30 pm – 3:00 pm 3:00 pm – 3:30 pm Abstract Course scheduling is an integral part of the college experience. At the University.
Planning Iteration Demo Suunto Training Program Planner.
ABSTRACT Zirous Inc. is a growing company and they need a new way to track who their employees working on various different projects. To solve the issue.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
MARCH 27, Meeting Agenda  Prototype 1 Design Goals  Prototype 1 Demo  Framework Overview  Prototype 2 Design Goals  Timeline Moving Forward.
COMP-14: Automating your deployments using ANT Gary S Clink Business Consultant.
Multi-agent Research Tool (MART) A proposal for MSE project Madhukar Kumar.
COMP 410 FINAL PRESENTATION. Agenda  Introduction of the Problem  Overview of NetFlow  Demo of Applications Built on NetFlow  The COMP 410 Experience.
System Development Process Prof. Sujata Rao. 2Overview Systems development life cycle (SDLC) – Provides overall framework for managing system development.
Volunteer Management System Presented by Team SE18-08S SE18-T08S - Jan 2012.
COMP 410 Update. The Problems Story Time! Describe the Hurricane Problem Do this with pictures, lots of people, a hurricane, trucks, medicine all disconnected.
Empowering the User Custom Web Reporting M. Keener & R. Kolatalo | Thursday, March 1, 2012.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Software Project Management Lecture # 7. Outline Project Scheduling.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services Job Monitoring for the LHC experiments Irina Sidorova (CERN, JINR) on.
ECTL A Support to the Automated Safety Data Monitoring Indicator project.
Proposal for Term Project J. H. Wang Mar. 2, 2015.
Clever Framework Name That Doesn’t Violate Copyright Laws MARCH 27, 2015.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
S The European Up-Front Risk Assessment Tool (EUFRAT) The European Up-Front Risk Assessment Tool (EUFRAT) (EUFRAT)
Visualizing Peer-to-Peer Networks Final Presentation By Team SPEW.
Actors and Use Case Diagrams Month Day, Year. Agenda Training Plan Overview Review Detailing Requirements with Requisite Pro Concepts Setting Up XDE Integration.
Page 1 CSISS Center for Spatial Information Science and Systems CWIC Metrics: Current and Future Weiguo Han, Liping Di, Yuanzheng Shao, Lingjun Kang Center.
Microsoft Project Reporting with Reporting Services.
A Data Stream Publish/Subscribe Architecture with Self-adapting Queries Alasdair J G Gray and Werner Nutt School of Mathematical and Computer Sciences,
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Implementation of a Relational Database as an Aid to Automatic Target Recognition Christopher C. Frost Computer Science Mentor: Steven Vanstone.
MSE Presentation 1 Lakshmikanth Ganti
Worldwide Protein Data Bank Common D&A Project Sequence Processing Modular Demo May 6, 2010 Project Deliverable.
The SQL Applications Documentation Tool for Dublin City Council.
Clever Framework Name MARCH 27, Meeting Agenda  Framework Overview  Prototype 1 Design Goals  Prototype 1 Demo  Prototype 2 Design Goals  Timeline.
MND review. Main directions of work  Development and support of the Experiment Dashboard Applications - Data management monitoring - Job processing monitoring.
T Iteration Demo MapGuide based Web Edit Interface I2 Iteration
Alex Turner Senior Program Manager Managed Languages Team Improve Your Code Quality using Live Code Analyzers.
T Project Review Magnificent Seven Final demonstration
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
AMSA TO 4 Advanced Technology for Sensor Clouds 09 May 2012 Anabas Inc. Indiana University.
ConfigMgr Discovering and Organizing Resources Mariusz Zarzycki, Phd, MCT, MCTS, MCITP, MCSE, MCSA.....
Sponsored by Portakal Technologies
A Case Study: Automated Continuous Software Engineering Cycle (ACSEC)
Integrating Dropbox with Canvas
Clever Framework Name That Doesn’t Violate Copyright Laws
Proposal for Term Project
Logo here Module 3 Microsoft Azure Web App. Logo here Module Overview Introduction to App Service Overview of Web Apps Hosting Web Applications in Azure.
Supplier Recovery Claim Automation
COMP 410 Update March 13, 2015.
Building Innovative Apps using the Microsoft Developer Platform
Project management 102 – PLANNING
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
SQL Server OLTP with Microsoft Azure Virtual Machines
Clever Framework Name That Doesn’t Violate Copyright Laws
Software Development Process
PC Reserves/DecisionSite Integration Improved RAC Process
Lecture 34: Testing II April 24, 2017 Selenium testing script 7/7/2019
March 27, 2015.
Presentation transcript:

APRIL 10, 2015

Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final Presentation  Questions & Answers

Prototype 2

Goals  Complete Data Aggregation  Synthesize different types of inputs into one or more different types of outputs  Increase the amount of data flow  Robust Connections  Demonstrate transmission failure and unintentional disconnection recovery  Network components directly related can detect device disconnects  System Diagnostics  Expand status logging of components, graphical network topology tool, and diagnostics tool

Progress  Complete Data Aggregation  Extended Prototype 1 structure to add automatically generated data in order to demonstrate scalability  Robust Connections  Reconnection after network failure between connected components  System Diagnostics  Parse network logs to display topology graphically  Log aggregation and filtering

Robust Connections TEAM LEAD – LUKE WANG

System Diagnostics TEAM LEAD – MAX PAYTON

Challenges  Complete Data Aggregation  Bottlenecks in Azure Database queries  Moving to Worker Roles from VMs more difficult than expected  System Diagnostics  Azure database connection problems prevented integration with Application

Final Prototype

Mitigation Plan Estimated hours of work left to our desired functionality Adjust deployment approach to launch one hospital per worker role. Make a request to increase available number of cores in Azure –currently capped at 20. For System Diagnostics database, reinstall database and further research Azure webapp to database connections

Final Presentation

Date & Location  Date: April 27th  Time: 4 PM  Location: McMurtry Auditorium

Format  Introduction of the Problem  Overview of the Framework Design  Demo an Application built on the Framework  Reflect on what we learned  The COMP 410 experience

Final Prototype  Efficiency  Recovery  Security  Extensibility  Testability

Final Prototype 1.High Volumes of Heterogeneous Data 2.Disconnections 3.Different Kinds of Devices 4.Human Interaction

Deliverables  Framework User Manual  Framework Code  Framework API Documentation  Example Application Project  Expect by May 6th