Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.

Slides:



Advertisements
Similar presentations
SKA-Pak Plus Mobile Air Cart Con-Space Link
Advertisements

WHAT IS STEAM PRO? Thermoflow, Inc.
Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Installing the UV Lamp.
Circulating Water System
Dishwasher Rework. Identify Unit Disconnect Power Turn off Breaker… … or unplug power cord.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
GNI0003H PP1 Loop Trainer. GNI0003H PP2 Reason for Study Because the Loop Trainer gives instructors the capability to control water flow, pressure and.
How to Perform Preventive Maintenance of the Personal Computer Properly Shut Down of the Computer Properly Shut Down of the Computer Unplug all Connection.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Normal Operating Parameters Maintenance Schedule Common Problems Normal Operating Parameters Maintenance Schedule Common Problems ClearWater Tech, LLC.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
© Swagelok Company, 2006 IFPAC Miniature Modular Stream Selection Valves Switching Valve CPAC NeSSI Workshop May 11, 2006.
Experimental Procedure Lab 402. Overview Three different experiments are complete in a calorimeter. Each experiment requires careful mass, volume, and.
NASA Bioculture System Capabilities Provides 10 individual cassettes containing hollow fiber bioreactors with media perfusion for a no shear cell culture.
Training Purposes Only JEM FACET JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and disclosed.
Training Purposes Only JEM SAIBO MAINT JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Election Commission of India
Settings & Adjustments. Settings & Adjustments.
WebCCTV 1 Contents Introduction Getting Started Connecting the WebCCTV NVR to a local network Connecting the WebCCTV NVR to the Internet Restoring the.
Verigy V93000 Service Training
Set Up for Live Streaming Video This presentation will walk you through the set up and delivery for streaming video of a live event over the internet.
WHIRLPOOL STEAM WASHER Presented by: Rick Kuemin, MSA Training Director Brought to you by:
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
Introduction to Routers
OVERVIEW OF PMSB INCINERATOR PLANT 1.Primary Chamber 3.Secondary Chamber 4.Heat Exchanger 5.Cooling Tower 7.Rotary Contactor 8.Fabric Filter 9.ID Fan 10.Stack.
社内資料社内資料 E-P Regulator for High Pressure up to 5.0MPa ITVX Series * This product is only for blowing, and does not have sufficient control for other application.
[1] 3D Micromanufacturing Lab. CO 2 INCUBATOR. [2] 3D Micromanufacturing Lab. What is an Incubator In biology, an incubator is a device used to grow and.
1.Applicable for 245 Ltr & 285 Ltr model of KAS factory 2.Model start with VAL254,VAL294,KSL254,KSL Applicable for Less cooling / No cooling.
Page 1 Hardware Disassembly | © 2008 Lenovo Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Please.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
CIR FOMA Calibration Crew 9/24/08 1:30 PRO-CIR ACT-CMD FOMA-BTL-CAL 1 CMD PRO-CIR DEACT-CMD 274 watts 402 watts274 watts This sequence powers CIR and correlates.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR Overview Charts August.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
1 Hardware Overview & Task Training 2013Martin Bost / Erik Hougland Pulmonary Function System Lyndon B. Johnson Space Center Human Research Facility Pulmonary.
Payload Operations Integration Working Group (POIWG) Increment 31/32 Overview January 24-26, 2011 Charles (Casey) Joyce Robotics.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
EMCS Inc 13 Operations Gary Moore EMCS Ops Lead (256)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
PRO 232 Date: August 2011 Page: 1 MELFI PCS Displays PRO 232 November, 2014 – Rev I Form FD (Rev 3/8/04)
Lyndon B. Johnson Space Center Human Research Facility (HRF) HRF WORKSTATION 2 Brian Barras 1 HRF WORKSTATION 2 OVERVIEW/NOMINAL OPERATIONS Trainer: Brian.
 Charging and Syncing the iPod Touch Cart Lesson 2.
NON-PROPRIETARY July NASA Ames Research Center ARC ISS Utilization Office Cell Bio Tech Demo Payload Overview POIWG MSFC July 25, 2012.
November 29, Frankie Jernigan MSG Integration Investigation Operations Lead EO
T-6B On-Board Oxygen Generation System (OBOGS)
Ventilation & Airflow NetShelter CX 18U,24U,38U Ambient office air is drawn in to the soundproofed air-intake chambers on either side of the NetShelter.
Increment 25/26 Cube Lab Ops TIR Overview Oct. 6, 2010 Four* new Modules (3 Aluminum Modules, 1 LMA pack) MSFC Ops Lead: Andrea Wade,
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Holter Monitor 2 Bioastronautics Flight Research Program Johnson Space Center, Houston, TX 1 Holter Monitor 2 Training Presentation Alonso Fuentes Hardware.
Human Research Facility HRF Ultrasound Training 1 Neil Travis Johnson Space Center 2010 HRF Ultrasound Training Instructor:Neil Travis
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
CBSE Cold Stowage Hardware Overview William Crysel UAB/CBSE
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Delta Training Strategy.
CCNA 2 v3.1 Module 2 Introduction to Routers
Chapter Objectives In this chapter, you will learn:
Brooks Expert Support Tool (BEST) Software
K TO 12 CHS MODULE FOR GRADE 9, PP
Blackbird 002 – Value Proposition
T-6B On-Board Oxygen Generation System (OBOGS)
SB Packing Automatic Downpuller Power Unit
Fundamentals of Computer Networks
How to Perform Preventive Maintenance of the Personal Computer
SAVI SCOUT® System Setup
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional Check-Out Overview Includes Gas Supply Module (GSM)

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Lesson Objectives At the completion of this Systems Overview session, the Crew should be able to: Know the purpose of the Biotechnology Specimen Temperature Controller (BSTC) and Gas Supply Module (GSM) hardware Understand the set up and functional checkout of the BSTC and GSM hardware Understand the operations and crew actions required to complete the BSTC Functional Check-out.

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM The BSTC is an incubator that provides the proper thermal and gas environment for growth and proliferation of three-dimensional cell cultures in microgravity. It is Single mid-deck locker EXPRESS Rack payload (requires EXPRESS power and data connections). It is designed to take air in through the front panel and exhaust it through vents at the side of the locker. (Front Breather) It contains a single Incubation Chamber which operates in heat only mode enclosed by two doors that maintain temperature and pressure. The BSTC contains a touch panel / LCD display for data entry and viewing system parameters. It includes a PCMCIA drive, requiring two PCMCIA cards, accessible from the front panel behind a Drive Cover, held on by thumb screws. Consumes a maximum of 100W of power at start up and 56W while incubating (power is approximately 28 W while idle). BSTC Purpose and Design

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM BSTC – Front View Door Latches Power Switch PCMCIA Card Drive Cover

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM BSTC – Outer Door Open PCMCIA Program Cards - Drive Cover Removed Inner Chamber Door and Latches LED Indicators

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM GSM Purpose and Design The GSM is designed to supply mixed gas to support payloads in need of maintaining metabolic parameters and physiological balance of cell culture media. The GSM contains two independent Gas Supply Systems, 1 and 2. Each Gas Supply System has a corresponding outlet valve (one) and two Supply Valves from two cylinders containing CO 2. The hardware is packed in an ISS stowage locker with foam isolation material covering gas cylinders.

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM GSM – Front View Outlet Ports

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Access Panels for the Gas Systems GSM – Top Side View

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Supply Valves

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM BSTC Functional Check-Out Overview OBJECTIVE: To verify functionality of BSTC and ground retrieval of data. PROCEDURES: The following procedures will be used to complete the Functional Check-Out (C/O): MGUEEXPRSBSTCN001 – BSTC Activate MGUEEXPRSBSTCN002 – BSTC Access MGUEEXPRSBSTCN003 – BSTC Close MGUEEXPRSBSTCN009 – BSTC Deactivate MGUEEXPRSBSTCN010 – BSTC Activate GSM MGUEEXPRSBSTCN011 – BSTC Connect Gas Supply Hose MGUEEXPRSBSTCN012 – BSTC Deactivate GSM MGUEEXPRSBSTCN013 – BSTC Disconnect Gas Supply Hose MGUEEXPRSBSTCN041 – BSTC Parameters

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM BSTC GSM BSTC Functional Check-Out Current Rack Configuration: EXPRESS Rack 4 (Lab Location: LAB1P2)

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM BSTC Functional Check-Out OPERATIONAL FLOW & CREW TIME BSTC-ACTIVATE-GSM – crew activates GSM (0:15) BSTC-ACTIVATE – crew activates BSTC (0:30) BSTC-PARAMETERS – crew notes BSTC parameters for call down. Perform twice, near beginning and end of Ops (0:05) BSTC-DEACTIVATE – crew deactivates BSTC (0:45) PRO-BSTC-CMD – PRO commanding to prepare for activation (1:30) PRO-BSTC-CMD – PRO commanding after deactivation (1:30) BSTC-OPS – Tracks power and data during checkout (1:00).

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM BSTC Functional Check-Out OPERATIONAL FLOW & CREW TIME 1 st Activity: BSTC Activate GSM Crew Time: 15 min Check Outlet Valves CLOSEDOPEN Refer to Execution Notes to understand which Gas Supply System to manipulate.

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM 2 nd Activity: BSTC Activate Crew Time: 30 min Embedded Procedures: BSTC Connect Gas Supply Hose BSTC Access BSTC Close When accessing BSTC Inner Chamber Door, note the inner door is not secured on the hinges. It is intended to release from the BSTC and has a velcro strip for quick tmpry stow. 3 rd Activity: BSTC Parameters Crew Time: 05 min (performed twice for total of 10 min) Crew will notate BSTC Parameters at the beginning of the hour and at the end of the hour. Crew will call down data at their convenience. BSTC Functional Check-Out OPERATIONAL FLOW & CREW TIME

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM BSTC – Front Panel Home Window

Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM 4 th Activity: BSTC Deactivate Crew Time: 45 min Embedded Procedures: BSTC Disconnect Gas Supply Hose BSTC Deactivate GSM BSTC Access BSTC Close BSTC Front Panel will display a touch screen upon powering up. Delete Log Files by selecting “Settings”. Crew will stow (2) BSTC Data Cables, (2) GSM Gas Supply Hoses, (4) BSTC Program PC Cards and (1) Subnet Mask PC Card in the inner chamber of the BSTC. All components can withstand temperatures reached during Check-out; cooling of the inner chamber before stow is not necessary. BSTC Functional Check-Out OPERATIONAL FLOW & CREW TIME