South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.

Slides:



Advertisements
Similar presentations
Everglades Restoration A Program for Integrated Regional Management
Advertisements

Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
In the early 1900’s man began to change this delicate system. It started with a series of canals and levees that were built to provide flood control and.
CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority.
Exotics Treatment in the Everglades Complex of Wildlife Management Areas 2006/2007 Jenny Ketterlin Sunrise Field Office Sunrise, FL
Florida Water Forum Everglades Restoration June 3, 2011.
Preparing for the Rainy Season SFWMD Operations & Actions.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
The South Florida Watershed
1 FEMA Flood Insurance Rate Map Update FEMA Public Meeting October 22, 2009.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
The Dynamite Days of Middle School Prior Knowledge Thomas M. Tufts.
Comprehensive Everglades Restoration Plan Picayune Strand Restoration Project Janet Starnes, Principal Project Manager Office of Everglades Policy and.
National Park Service - DOI Everglades National Park Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project.
Please note: this presentation has not received Director’s approval and is subject to revision.
North Spreader Ecosystem Management Agreement Net Ecosystem Benefit Projects (July 2007 Photo)
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Miccosukee Tribe of Florida and the Everglades Restoration Effort.
Of America’s Everglades & the South Florida Ecosystem the Restoration.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
Acme Basin B Discharge Public Workshop May 22, 2002 COMPREHENSIVE EVERGLADES RESTORATION PLAN.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River Management Coordinating Council September 24, 2007 Loxahatchee.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
History of the Tamiami Trail and a Brief Review of the Road Construction Movement in Florida. Published by authority of the Tamiami Trail Commissioners.
U.S. Army Corps of Engineers In partnership with the South Florida Water Management District Water Management in South Florida.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
South Florida Everglades Historically: Free-flowing ‘river of grass’ extending from the Kissimmee chain of lakes to Florida Bay. Since late 1800s: Construction.
Northern Integrated Supply Project NSPE-Colorado State Meeting February 2010.
PICAYUNE STRAND RESTORATION PROJECT PUMP STATIONS PRELIMINARY DESIGN South Florida Water Management District Water Resources Advisory Committee April 6,
Generalized Cross Section through Miami / Dade and Broward Counties Sea Level 40 Sea Level EvergladesAtlantic.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
WRAC Acme Basin B Discharge Project February 2, 2006.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
1 Engineering Analysis of Properties Designated within the City of Bonita Springs as “Density Reduction/Groundwater Resource” (DR/GR) Land Use Category.
Coconut Creek by Aiyana. Map Facts The city was named for the coconut palms growing there. Coconut Creek is in Broward County and is 1 mile east of Mangate,
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
September 18, 2002 Master Recreation Plan Team Kick-Off Meeting Comprehensive Everglades Restoration Plan.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
CREW Management Area Steve Coughlin, Section Administrator Land Stewardship Section.
Region- Southeast State- Florida Capital- Tallahassee Latitude- 26.0°N Longitude- 80.7°W Florida.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
View of Big Wave Project From Highway 1 and North Capistrano Existing View Phase 1 and 2 (2 years from Permit): First 16 Units, Kitchen, Dining, Living,
S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T Request for Changes to Settlement Agreement Monitoring Pete Rawlik, SFWMD TOC Meeting,
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Everglades National Park Lessons Learned From Everglades National Park, USA Expert Workshop on Benchmarks and Chapter IV Operational Guidelines World Heritage.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Community Development Department Ryan’s Landing Planned Unit Development Application No
Upper St. Johns River Basin Project US Army Corps of Engineers A joint project between the St. Johns River Water Management District and the Jacksonville.
S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T Water Conditions Summary Jeff Kivett, PE, Division Director Operations, Engineering.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
NACD 2010 Orlando Everglades Restoration: Plans, Progress, and Partnerships3.
C ALOOSAHATCHEE & E VERGLADES R ESTORATION Jennifer Hecker, Director of Natural Resource Policy.
STA-1E Structures, Flow, & Long Term Enhancements*
1 2 EMERSON PARCEL (438 acres) GILBERT PARCEL (292 acres) 3 4
December 2017 Dynamic Position Analysis Modeling Assumptions
Florida Power & Light Reclaimed Water Opportunities
Next Steps in Everglades Restoration
Background Lee County has about 180,000 pounds of nitrogen to remove from the Tidal Caloosahatchee. There are limited locations near the stream outfalls.
Sacramento Environmental Commission January 2019.
Presentation transcript:

South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward County Water Preserve Area 14. Central Everglades Planning Project Decomp Physical Model Restoration Strategies Information on Project Schedules from Integrated Delivery Schedule Theme 5 Following Project Maps from: DOI - USACE - /EcosystemRestoration.aspx /EcosystemRestoration.aspx SFWMD -

Seminole Big Cypress 1,500 acres of wetlands restored, East conveyance system completed. Complete 2016.

Modified Water Deliveries 8.5 Square Mile Area, S-355 A&B, S- 333 and S-334 modifications, S-356, L-67 extension levee removal, Tamiami Trail 1-mile Bridge Complete. G-3273 & S-356 Pump Station Field Test began October 15, – Relaxes constraints on gage G-3273, – tests seepage control pump S-356, – Increment 1 maintains the L-29 Canal at 7.5 feet. – Increment 2, which increases L-29 Canal to 8.5. – Emergency Highwater operations in WCA 3A allow for raising to 8.5.

C-111 South Dade SSR intermediate results C- 111 South Dade combined with Interim Operations Plan operations moved 70% of flow at S-176 into South Dade detention areas. Hydroperiods in ENP are on average 60 days longer near detention areas. Completion 2019

C-111 Spreader Canal S-200, Frog Pond Detention Area, S-199, Aerojet Canal Plugs, C-110 Plugs Completed Extend Hydraulic Ridge to keep water in Everglades National Park and into Taylor Slough.

Decomp Physical Model S-152 on L-67A and Backfill of L-67 C 300 to 500 cfs of flows at certain periods between November and January ( ).

Broward County Water Preserve Area C-11 Impoundment and Seepage Management Area (2021 Operation) C-9 Impoundment (2029 Operation) 10,800 acre-ft of storage Control Seepage from East side of Water Conservation Area 3 Reduce flow of nutrients from S-9 structure

Central Everglades Planning Project Needs WRDA Authorization Number of storage, barrier removal and conveyance structures from North WCA 3A to 3B to Everglades National Park – Old Tamiami Trail removal, L-67A structure 1 and L-67 C gap estimate of 2021.

State of Florida Restoration Strategies Six water treatment and storage facilities to improve water quality More Clean Water available to WCAs A-1 FEB Complete 2015 L-8 FEB Complete 2016 STA 1W Expand 2018 Completion estimate by 2026