PERT Gantt WBS.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

PROJECT MANAGEMENT TOOLS AND TECHNIQUES
CP Chapter 4 Schedule Planning.
Gantt PERT Having Fun with & Modified from lecture notes of Mark Kelly
Work Breakdown Structures
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Chapter 3 Managing the Information Systems Project
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Advanced Project Management - CPH
Mark Kelly McKinnon Secondary College Gantt PERT Having Fun with &
Having Fun with Gantt PERT &.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Chapter 10: Project Schedule Planning
Eleanor Roosevelt High School
MGMT 483 Week 8 Scheduling.
SW Project Management Project Schedule and Budget
Project Management. What is a Project? One Time Effort Identifiable Start/End Points Specific Objectives Multiple Tasks Resources from Across the Organization.
Project Time Management
Importance of Project Schedules
Project Time Management
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Workshop-3 Gantt and Pert Chart.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Software Project Management Task Estimating and Scheduling
Mark Kelly McKinnon Secondary College Gantt PERT Having Fun with &
Project Scheduling: PERT/CPM
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
1 Rev: 5/05/07 MSE-415: B. Hawrylo Chapter 16 Managing Projects MSE-415: Product Design Lecture #3.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT Approaches
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
PRJ566 Project Planning & Management Dependencies, Network Diagrams & Critical Path.
Project Management Software Application PRM 705 Lecture 5 Mian Wasim Irshad.
Mark Kelly Vceit.com Gantt Having Fun with. 2 Well, “fun” might be optimistic At least they’re more fun than this…
Chapter 3 Managing the Information Systems Project
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
Project Time Management
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Chapter 4 Note: See the text itself for full citations.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Project Scope, Time and Cost IT Project Management PM Knowledge Areas:
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Managing the Information Systems Project Cont’d
PROJECT MANAGEMENT.
Critical Path Method(CPM)
The Project Schedule and Budget
Eleanor Roosevelt High School
Having Fun with Gantt Version 1.2 (Dec 2017) Mark Kelly Vceit.com.
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Guide to Project.
PERT - The Program Evaluation and Review Technique
Tools for Visualization
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

PERT Gantt WBS

Gantt Charts Gantt Charts

Gantt Basics Basically, a timeline with tasks that can be connected to each other Note the spelling! It is not all-capitals! Can be created with simple tools like Excel, but specialised tools like Microsoft Project make it easier

Making a Gantt chart Step 1 – list the tasks in the project

Step 2 – add task durations

Step 3 – add dependencies (which tasks cannot start before another task finishes)

The arrows indicate dependencies. Task 1 is a predecessor of task 2 – i.e. task 2 cannot start before task 1 ends. Task 3 is dependent on task 2. Task 7 is dependent on two other tasks Electrics, plumbing and landscaping are concurrent tasks and can happen at the same time, so they overlap on the chart. All 3 can start after task 4 ends. Painting must wait for both electrics and plumbing to be finished. Task 9 has zero duration, and is a milestone

Step 4 – find the critical path The critical path is the sequence of tasks from beginning to end that takes the longest time to complete. It is also the shortest possible time that the project can be finished in. Any task on the critical path is called a critical task. No critical task can have its duration changed without affecting the end date of the project.

The length of the critical path is the sum of the lengths of all critical tasks (the red tasks 1,2,3,4,5,7) which is 2+3+1+1.5+2+1 = 10.5 days. In other words, the minimum amount of time required to get all tasks completed is 10.5 days The other tasks (6,8) can each run over-time before affecting the end date of the project

The amount of time a task can be extended before it affects other tasks is called slack (or float). Task 6 can take an extra day and a half before it affects the project’s end date, so each has 1.5 day’s slack.

Stands for Program Evaluation and Review Technique PERT Charts PERT Charts Stands for Program Evaluation and Review Technique

PERT basics PERT is an acronym so it’s in capital letters In Gantt chart, the length of a task’s bar is proportional to the length of the task. This rarely applies to PERT charts.

PERT charts This PERT chart follows the “Activity on Arrow” style. The tasks are shown by arrows. Task name are shown by letters, in this case. The circles are called nodes. The nodes indicate the start or end of tasks. Task durations are the shown by the numbers.

‘Activity on Node’ style PERT Activity on Node is a different flavour of PERT: this time the nodes are tasks, and the arrows are merely connectors.

Some Gantt / PERT Terms Lead time Lag time Occurs when a task should theoretically wait for its predecessor to finish, but can actually start a little early. The time that the tasks overlap is lead time. Lag time The minimum amount of time that must pass between the finish of one activity and the start of its successor(s). Lag time is shown in a PERT chart as an arrow with a duration but no task assigned to it.

Dummy Task Shown by a dotted arrow on a PERT chart, it shows a dependency but no task.

1: Which tasks are on the critical path? 2: What is the slack time for tasks C, D and G?

Possible paths: A,B,C,E,I = 2+3+1+4+3 = 13 days Which tasks are on the critical path? Possible paths: A,B,C,E,I = 2+3+1+4+3 = 13 days A,B,D,F,I = 2+3+3+3+3 = 14 days A,G,H,I = 2+2+5+3 = 12 days

What is the slack time for tasks C, D and G? TASKS C and D… Path C,E = 5 days, Path D,F = 6 days Difference (slack) = 1 day for tasks C or E compared to D,F TASK G… Path B,C,E = 8 days. Path B, D, F = 9 days Path G, H = 7 days. So G & H have 2 days’ slack between them. B,C or E have 1 day’s slack. B,D,F have no slack.

Work Breakdown Structure “Project best understood by breaking it down into its parts” Work Breakdown Structure (WBS) - defines the total scope of the project - fundamental to much of project planning & tracking Start at top, progressively break work down (tree structure) into work packages Packages give clear work assignments

Sample Intranet WBS

Intranet WBS in Tabular Form 1.0 Concept 1.1 Evaluate current systems 1.2 Define Requirements 1.2.1 Define user requirements 1.2.2 Define content requirements 1.2.3 Define system requirements 1.2.4 Define server owner requirements 1.3 Define specific functionality 1.4 Define risks and risk management approach 1.5 Develop project plan 1.6 Brief web development team 2.0 Web Site Design 3.0 Web Site Development 4.0 Roll Out 5.0 Support

Intranet WBS and Gantt Chart

PERT Gantt PERT chart is represented as a flow chart. PERT charts emphasize relationships between tasks. A PERT chart might have several parallel or interconnecting networks of tasks. Gantt chart is represented as a bar graph. Gantt charts emphasize the time it takes to complete tasks. Gantt chart is linear. Any relationships between tasks on a Gantt chart are depicted with arrows.

Sapna Bansode-03 Nutan Mote-15 Poonam Mote-16 Pooja Raut-22 Presented by: Sapna Bansode-03 Nutan Mote-15 Poonam Mote-16 Pooja Raut-22

THANK YOU..