Javier Orellana JRA4 Coordinator All-Activity Meeting CERN 14 January 2004 EGEE is proposed as a project funded by the European Union under contract IST-2003-508833.

Slides:



Advertisements
Similar presentations
EGEE is a project funded by the European Union under contract IST R-GMA status and plans Abdeslem DJAOUI / RAL GRIDPP10 meeting at CERN, 3.
Advertisements

EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
Connect. Communicate. Collaborate The Technological Landscape of GÉANT2 Roberto Sabatino, DANTE
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
EGEE is a project funded by the European Union under contract IST JRA4 Execution Plan and Brainstorming Javier Orellana JRA4 Coordinator EGEE.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
GEANT Performance Monitoring Infrastructure – Joint Techs meeting July Nicolas Simar GEANT’s Performance Monitoring.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
EMI INFSO-RI EMI Quality Assurance Processes (PS ) Alberto Aimar (CERN) CERN IT-GT-SL Section Leader EMI SA2 QA Activity Leader.
INFSO-RI Enabling Grids for E-sciencE Federated Network Performance Monitoring for the Grid K. Kavoussanakis, EPCC, The University.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
Security Area in GridPP2 4 Mar 2004 Security Area in GridPP2 “Proforma-2 posts” overview Deliverables – Local Access – Local Usage.
EGEE is a project funded by the European Union under contract IST JRA3 Security Åke Edlund Security Head PEB All-Activity Meeting, June 18,
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
EGEE is a project funded by the European Union under contract IST JRA1-SA1 requirement gathering Maite Barroso JRA1 Integration and Testing.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
EGEE is a project funded by the European Union under contract IST Summary Bob Jones Technical Director AA Meeting, CERN, 18th June
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
Distributed Software Development QR Marks The Spot Project Plan Presentation Nicolas Jacquemoud.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks IPv6 test methodology Mathieu Goutelle (CNRS.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
EMI INFSO-RI Guidelines and SQA Process Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
INFSO-RI Enabling Grids for E-sciencE Technical Overview Bob Jones, Technical Director, CERN EGEE 1 st EU Review 9-11/02/2005.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
Javier Orellana JRA4 Coordinator Face to Face Partners Meeting University College London 11 December 2003 EGEE is proposed as a project funded by the European.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis J-P. Gautier.
Bob Jones EGEE designated technical director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST JRA4 Overview Javier Orellana JRA4 Coordinator EGEE Kick Off Meeting SA2.
All Activities Meeting – 13/14 Jan SA2 Execution Plan for the first year Franck Bonnassieux CNRS/UREC EGEE is proposed as a project funded by.
Enabling Grids for E-sciencE EGEE-III-INFSO-RI EGEE and gLite are registered trademarks Francesco Giacomini JRA1 Activity Leader.
INFSO-RI Enabling Grids for E-sciencE Network Services Development Network Resource Provision 3 rd EGEE Conference, Athens, 20 th.
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
EGEE is a project funded by the European Union under contract IST Pete playing devils advocate JRA4-F2F Javier Orellana EGEE-JRA4.
EGEE is a project funded by the European Union under contract IST GN2 SA3 End to End Quality of Service Toby Rodwell DANTE First EGEE Conference,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Network Support Workshop Mario Reale / IGI - GARR EGI Network Support.
EGEE is a project funded by the European Union under contract IST NA3 Execution Plan Malcolm Atkinson Director of the National e-Science Centre.
EGEE is a project funded by the European Union under contract IST Network Activities Jean-Paul Gautier CNRS/UREC French Federation meeting.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
INFSO-RI Enabling Grids for E-sciencE JRA3 Åke Edlund On behalf of JRA3 EGEE 8th All-activity meeting January 18-19,
INFSO-RI Enabling Grids for E-sciencE TNC 2005 Networking activities in EGEE Mathieu Goutelle (CNRS UREC, France) EGEE-SA2 activity.
JRA1 Middleware re-engineering
Bob Jones EGEE Technical Director
Regional Operations Centres Core infrastructure Centres
JRA1 Middleware Re-engineering Status Report
EGEE Middleware Activities Overview
Status of SA2 Network Resource Provision Jean-Paul Gautier CNRS/UREC
DataGrid Quality Assurance
JRA3 Introduction Åke Edlund EGEE Security Head
SA1 Execution Plan Status and Issues
NPM Workplan K. Kavoussanakis.
Ian Bird GDB Meeting CERN 9 September 2003
JRA1 (Middleware) Overview
WP7 objectives, achievements and plans
Network Requirements Javier Orellana
Bandwidth Allocation and Reservation Anand Patil, DANTE
JRA2 Quality Assurance Geneviève Romier CNRS-UREC
Presentation transcript:

Javier Orellana JRA4 Coordinator All-Activity Meeting CERN 14 January 2004 EGEE is proposed as a project funded by the European Union under contract IST Execution Plan for JRA4

All-Activity Meeting – CERN- 14 January Outline Activity description Deliverables/Milestones Y1 Distribution of Effort Staff Product Breakdown Structure Work Breakdown Structure (initial three months) Risks Issues Related with other activities Changes in the TA Next steps before projects startup

All-Activity Meeting – CERN- 14 January JRA4 Activity TJRA4.1: Network performance monitoring and diagnostic tools TJRA4.2: Bandwidth allocation and reservation TJRA4.3: IPv6 uptake Development of Network Services: Network Resources Grid Middleware JRA4

All-Activity Meeting – CERN- 14 January Deliverables/Milestones for Y1 TJRA4.1: Network performance monitoring and diagnostic tools Project Month Deliverable or Milestone ItemLead Partner M3MJRA4.1 Definition of initial network performance metrics and composite measurements required. M6MJRA4.2 Requirements and use cases for monitoring and diagnostics tools for users, middleware and operations. M9DJRA4.2 Definition of standardised network measurement query/response interfaces,with adequate authorization. M12MJRA4.3 Prototype tool to access network performance metrics from a limited set of measurement points.

All-Activity Meeting – CERN- 14 January Deliverables/Milestones for Y1 TJRA4.2: Bandwidth allocation and reservation Project Month Deliverable or Milestone ItemLead Partner M6DJRA4.1 Specification of interfaces to network control plane, to global resource reservation middleware for bandwidth allocation and reservation. M15MJRA4.4 Prototype Implementation of bandwidth allocation and reservation service at specific network ingress points using static network configuration. M15 MJRA4.5 Specification of end-to-end bandwidth reservation system.

All-Activity Meeting – CERN- 14 January Deliverables/Milestones for Y1 TJRA4.3: IPv6 uptake Project Month Deliverable or Milestone ItemLead Partner M18 DJRA4.3 Report on implications of IPv6 usage for the EGEE Grid. (for Month 18)

All-Activity Meeting – CERN- 14 January Distribution of Effort per Partner * FTE : Full Time Engineer † Total effort=Funded+Unfunded PM= efforts are expressed in Person Month. Total Effort † Total Effort1st Year Effort2nd Year Effort Activity JRA4 (FTE)*(PM) UCL CNRS DANTE DFN Total GARR 12412

All-Activity Meeting – CERN- 14 January Staff Collaborator namePartner Function / Area Interest Provisional Date in Month 1 to 12 FTE † F or UF *Total PM Javier OrellanaUCL JRA4 Coordin.11F12 X UCL Band Alloc Res11?12X UCL Band Alloc Res11?12 Jean Paul Gautier CNRS Net Perf Mon10.4UF4.8 Bernard Tuy CNRS IPv610.1UF1.2 X CNRS ?10.5UF6X CNRS ?11F12 Nicolas Simar DANTENet Perf Mon10.5F6 XDANTE?10.5UF6 Robert StoyDFN Net Perf Mon?10.5UF6 Gloria VuagninGARR Perf M./Band A.10.5F6 X GARR ?10.5UF6 Total effort Total from TA Deviation 0 0 (†) 1=full time, 0,5 half time,.. ( *) F=Funded, UF=Unfunded.

All-Activity Meeting – CERN- 14 January Product Breakdown Structure EGEE Middleware General Resource Broker Bandwidth Allocation & Reservation Allocation Reservation Multi-domain AAA User Interface DocsTraining Admin/ User Monitoring Perf. Monitoring AAA Network Monitoring Software Platform interface TF-NGN PIPES GN2 Data interface User Interface Admin/ User mware Interface DocsTraining Admin/ User Operations IPv6 Report Testbed Integration with JRA1 Would be nice to have it ? Revision with JRA3

All-Activity Meeting – CERN- 14 January Work Breakdown Structure – MJRA4.1 TJRA4.1: Network performance monitoring and diagnostic tools MJRA4.1: Definition of Performance Metrics and Composite Measurements TJRA4.1.1 Achieve MJRA TJRA Study of GGF NMWG schema TJRA Selection of the appropriate metrics TJRA Definition of potential composite metrics 23 2 Task Task Title Month Start Month End UCLUCL CNRSCNRS DANTEDANTE DFNDFN GARRGARR TOTALTOTAL MM PM Effort

All-Activity Meeting – CERN- 14 January Work Breakdown Structure – MJRA4.2 TJRA4.1: Network performance monitoring and diagnostic tools MJRA4.2: Requirements and use cases for monitoring and diagnostic tools for users, middleware and operations Task Task Title Month Start Month End UCLUCL CNRSCNRS DANTEDANTE DFNDFN GARRGARR TOTALTOTAL MM PM Effort TJRA4.1.2 Achieve MJRA TJRA Requirements and Use case for end users (Interaction with NA4) TJRA Proposition and Use case for mw (Interaction with JRA1) TJRA Requirements + Propositions and Use case for ops (Interaction with SA1/SA2)

All-Activity Meeting – CERN- 14 January Work Breakdown Structure – DJRA4.1 TJRA4.2: Bandwidth Allocation and Reservation DJRA4.1 : Specification of Interfaces for network control plane & global resource reservation middleware. Task MEndMEnd UCLUCL CNRSCNRS DANTEDANTE DFNDFN Task Title MStaRtMStaRt M M PM GARRGARR TOTALTOTAL Effort TJRA4.2.1 Deliver DJRA TJRA Study and Assessment of the Interfaces from existing projects 3 2 TJRA Definition of the Interface for global resource reservation with JRA1.Modelling with use cases or sequence diagrams 3 3 TJRA Survey of potential current sw (GARA and others). Comparing via Use cases. Recommendation either use one of them or build a new one 5 3 TJRA Study of the network equipment in use and access methods

All-Activity Meeting – CERN- 14 January Work Breakdown Structure – DJRA4.3 TJRA4.3: IPv6 DJRA4.3 : Report on implications of IPv6 usage for the EGEE Grid Task MEndMEnd UCLUCL CNRSCNRS DANTEDANTE DFNDFN Task Title MStaRtMStaRt M M PM GARRGARR TOTALTOTAL Effort TJRA4.3.1 Start DJRA TJRA Study of IPv6 implication 12 6 TJRA Likely collaboration with 6NET Building testbed for IPv6?, need official approval

All-Activity Meeting – CERN- 14 January Risks Risk title Class † Level * Description Actions, responsibility, deadline HiringM2Difficulties to hire people (latency + adequate profile) GlueM2Activity resources dispersion, distributed team Periodic conf. calls. Also regular F2F meetings RequirementsT1Gathering of adequate application network requirements Software Compatibility P1Possible software incompatibility between the current mware and JRA4 software available (GARA and others) Understand towards where mware will evolve. Option of porting applications or building a new prototype Platform versions P1Long project. Platform versions can change, like the issues with Linux. Multi-platform issues P2Need for JRA4 software to be multi- platform For new prototypes, consider using JAVA Status of Network Serv. T1Network Services relying on other services not yet ready end to end. Follow closely the net. deployment calendar (†) M=Management/Organisation, P=Product, S= Service, T=technical ( *) 1=low, 2=Medium, 3=high, 4=critical

All-Activity Meeting – CERN- 14 January Issues related to other Activities JRA1: Integration: interfaces JRA1-JRA4 using software available today. Modelling methodology (UML?): if any, which tools? Going on with the “Network Cost Function”, who JRA1/JRA4? JRA3: Multi-domain Authentication/Authorisation ? Use of certificates from a CA? Use of firewalls / NATs?

All-Activity Meeting – CERN- 14 January Changes to the TA Require in:Description Page 193 Table KK Page 198 Page 202 If required, move of MJRA4.2 to M3 from M6 Therefore, we will rename the milestones: MJRA4.2 MJRA4.1 UCL will also work on the Performance Monitoring Page 194 Table MM

All-Activity Meeting – CERN- 14 January Next steps before project startup Hiring people Set up collaboration with partners (CNRS, DANTE, DFN & GARR) Start dialog with other activities, mainly JRA1 and JRA3 Mutual feedback with DANTE between JRA4 and GN2

All-Activity Meeting – CERN- 14 January Questions ?