Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
CS 432 Object-Oriented Analysis and Design
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
IS 460 Notes IS Strategic Planning By Thomas Hilton.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing October 18, 2007.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
ITEC 3220M Using and Designing Database Systems
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
L. Arnaudon BE/RF/CS. Outline  RF systems description  Software environment  RF specialist requirements  RADE tools in use  ACS application  Low.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
The recent history and current state of the linac control system Tom Himel Dec 1,
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Beam Interlock System Technology Evaluation and Design MACS Week 1, 2011 Hannes Pavetits 1 R. Gutleber PR a-HPA, March 28 th, 2011 H. Pavetits.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Linux in the Accelerator Division Jim Smedinghoff Linux User Group Jan /28/2015Smedinghoff | Linux in the Accelerator Division1.
ESS Integrated Control System Software Core Components S.Gysin
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
PXIE/PIP-II Control System J. Patrick October 7, 2014.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Brian Drendel October 31, This talk  Beams-doc private/DocDB/ShowDocument?docid=4474https://beamdocs.fnal.gov/AD-
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
© 2002, Cisco Systems, Inc. All rights reserved..
Control System Tools for Beam Commissioning Timo Korhonen Controls Division Chief Engineer April 8, 2014.
Summary Instrumentation & Controls WG Wim Blokland Jim Patrick Manfred Wendt Project X Collaboration Meeting September 12, 2009.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Presented by Li Gang Accelerator Control Group
ATF/ATF2 Control System
The ILC Control Work Packages
Control system network security issues and recommendations
Plan for controls with the digital platform
LLRF Control System Outline Scope Requirements Options considered
Low Level RF Design Outline Scope Requirements Options considered
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009

Page 2 AAC, February 3, 2009 – J. Patrick Outline Description of the scope of the system Performance specification of the system Primary technical issues and the strategy to address them Goals of the plan by year Role of outside collaborators.

Page 3 AAC, February 3, 2009 – J. Patrick Control System Console Applications Java Applications Web Applications Database Central Services Web Servlets Open Access Front-Ends IRM Front-Ends MOOC Front-Ends Labview Front-Ends Field Hardware CAMAC, VME, PMC, PLCs, IP, CIA, GPIB, … Application ~200 Central Front-End ~500 ~100

Page 4 AAC, February 3, 2009 – J. Patrick Control System Scope Control System Infrastructure –Software frameworks – front-ends, services, applications –Core services – alarms, data acquisition, archiving, database, etc. –Network infrastructure – central and remote switches and cabling Timing System –Central timing generator –Signal distribution –Receiver modules for front-end hardware Machine Protection System –Input modules –Network –Central concentration –Not including detectors

Page 5 AAC, February 3, 2009 – J. Patrick System Scope Technical subsystems –Vacuum –LCW –Motion Control –Tunnel cryogenics –High level power supply control Application software –Technical subsystems –Utility applications –Machine applications Not included here: –Instrumentation controls –RF controls

Page 6 AAC, February 3, 2009 – J. Patrick System Requirements Pulsed machine – 5 Hz upgradeable to 15 Hz Potentially different characteristics and disposition of each pulse Pulse to pulse feedback for required stability Scale roughly comparable to the current complex: –~350K device properties –~500 front-ends –~100 central services –~200 consoles –Archive ~50K devices; ~10 GB/day

Page 7 AAC, February 3, 2009 – J. Patrick Technical Issues Large scale –Scale and complexity comparable to current facility High Availability Requirement Machine Protection Pre-existing MI/Recycler hardware including timing system Integration of externally provided subsystems

Page 8 AAC, February 3, 2009 – J. Patrick Technical Strategy Evolve current core system through the NO A era to Project X –Refurbish obsolete systems in MI/Recycler with Project X appropriate hardware (and software)  Large amount of CAMAC, fate t.b.d. –Modernize software frameworks –Support EPICS front-ends and display screens Develop new timing system for Project X linac –New protocol, merge events/data, interface to old system if needed Develop new machine protection system for linac Develop Project X specific software applications Test new technology at the HINS and NML facilities

Page 9 AAC, February 3, 2009 – J. Patrick Goals and Timeline 2009 –Global requirements –EPICS integration –Timing system specification –Develop plan for hardware platform R&D –Front-end framework upgrade design 2010 –Hardware platform R&D –Timing system design –Machine protection design –Application framework upgrade –Hardware platform R&D –Core infrastructure modernization

Page 10 AAC, February 3, 2009 – J. Patrick Goals and Timeline 2011 –Timing system prototypes –Machine protection prototypes –Standards for externally developed subsystems –Technical subsystem specification –Core infrastructure modernization 2012 –Final timing/machine protection prototypes –Specify machine applications –Technical subsystem prototyping –Core infrastructure modernization

Page 11 AAC, February 3, 2009 – J. Patrick Collaborators Collaboration on controls infrastructure –Initial contact with SLAC and Argonne –SLAC interest in evaluation of new hardware platforms (xTCA etc.)  Possibly develop RF interlocks for SLAC test-stand in xTCA –No definite plan at this time Externally provided subsystems –We expect to provide standards for interfacing to the control system  Software and hardware platforms –We expect to support inclusion of EPICS based subsystems  With standards for supported tools, conventions etc. –We will provide timing or other general purpose hardware if needed for remote subsystem development

Page 12 AAC, February 3, 2009 – J. Patrick Summary General strategy is to evolve the current control system through the NO A era prior to Project X linac operation –Refurbish hardware in MI/Recycler –Modernize software frameworks –Integrate EPICS Major Project X specific R&D goals: –Hardware platform –New timing system design –New machine protection system design –Technical subsystem design Role of collaborators not yet defined –Preliminary discussions with Argonne and SLAC