© 2001 By Default! A Free sample background from www.pptbackgrounds.fsnet.co.uk Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.

Slides:



Advertisements
Similar presentations
AB / CO Review1 PS Complex Software for 2006 PS Complex Operation Teams & S. Pasinelli.
Advertisements

“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 1/15 LEIR Commissioning Introduction –Recap on LEIR –General comments –Situation at the time of the.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
The TIMING System … …as used in the PS accelerators.
controls Middleware – OVERVIEW & architecture 26th June 2013
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
LHCOP / SPS Cycling for LHC1 SPS cycling for LHC injection J. Wenninger AB/OP Introduction to the timing system. Timing and settings constraints.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
© 2001 By Default! A Free sample background from Slide 1 LEIR Application Project LEIR Applications is a separate project.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
T HE BE/CO T ESTBED AND ITS USE FOR TIMING AND SOFTWARE VALIDATION 22 June BE-CO-HT Jean-Claude BAU.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
1 LTC Timing AB/CO/HT Central timing hardware layout Telegrams and events Postmortem, XPOC LHC Central Timing API Fill the LHC Use Case Julian Lewis.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
The Status of the LHC Controls System Shortly Before Injection of Beam
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
© 2001 By Default! A Free sample background from Slide 1 Shot by Shot Logging Status Report of Ti8 Tests AB/CO Technical.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Machine Interlocks in the Injectors IEFC workshopBruno PUCCIO (TE/MPE) 22 nd March v0.
Strategy to achieve smooth upgrades during operations Vito Baggiolini BE/CO 1.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
CERN Timing Overview CERN timing overview and our future plans with White Rabbit Jean-Claude BAU – CERN – 22 March
Issues concerning Device Access (JAPC / CMW / FESA) With input from: A.Butterworth, E.Carlier, A. Guerrero, JJ. Gras, St. Page, S. Deghaye, R. Gorbonosov,
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
TS workshop 2004U. Epting, M.C. Morodo Testa - TS department1 Improving Industrial Process Control Systems Security Uwe Epting (TS/CSE) Maria Carmen Morodo.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre AB/CO review D.Manglunki / AB-OP CERN Control Centre.
V4.
SPS Applications Software issues - startup in 2006 and legacy problems
Introduction to RBAC Wojciech Sliwinski BE/CO for the CMW/RBAC team
SLS Timing Master Timo Korhonen, PSI.
Post-mortem of Experience with LEIR Controls
Superbeams with SPL at CERN
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
Presentation transcript:

© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004 V.BaggioliniS.JensenM.Pacehttp://leir-proj-controls.web.cern.ch/

© 2001 By Default! A Free sample background from Slide 2 Outline LEIR Machine LEIR Machine –Generalities –Commissioning Planning LEIR Controls LEIR Controls –Scope –Architecture –Sequencing & Timing –Hardware –Front end Software –Application Software –General Services Conclusions – Issues’ summary Conclusions – Issues’ summary

© 2001 By Default! A Free sample background from Slide 3 Outline LEIR Machine LEIR Machine –Generalities –Commissioning Planning LEIR Controls LEIR Controls –Scope –Architecture –Sequencing & Timing –Hardware –Front end Software –Application Software –General Services Conclusions – Issues’ summary Conclusions – Issues’ summary

© 2001 By Default! A Free sample background from Slide 4 The LHC Injector Chain LEIR 72 MeV/n Pb 6 GeV/n Pb 177 GeV/n Pb 2.76 TeV/n Pb- Pb LEIR Low Energy Ion Ring 72MeV/n E8 Pb/cycle

© 2001 By Default! A Free sample background from Slide 5 The LEIR Layout Injection E- cooler Ejection RF LEAR Ring

© 2001 By Default! A Free sample background from Slide 6

© 2001 By Default! A Free sample background from Slide 7 Outline LEIR Machine LEIR Machine –Generalities –Commissioning Planning LEIR Controls LEIR Controls –Scope –Architecture –Sequencing & Timing –Hardware –Front end Software –Application Software –General Services Conclusions – Issues’ summary Conclusions – Issues’ summary

© 2001 By Default! A Free sample background from Slide 8 Commissioning Planning H/W commissioning Beam commissioning LEIR Injection lines 03 JAN - 30 AVR AVR - 30 JUL 2005 LEIR Ring 30 AVR - 30 JUL JUL - 30 NOV 2005 LEIR Ejection lines 30 JUL - 30 NOV NOV – 28 FEB 2006 PS Commission incl LEIR operation SPRING 2006 SPS Commission incl PS + LEIR operation 2007From Local Control Room From Common Control Room

© 2001 By Default! A Free sample background from Slide 9 Outline LEIR Machine LEIR Machine –Generalities –Commissioning Planning LEIR Controls LEIR Controls –Scope –Architecture –Sequencing & Timing –Hardware –Front end Software –Application Software –General Services Conclusions – Issues’ summary Conclusions – Issues’ summary

© 2001 By Default! A Free sample background from Slide 10 LEIR Controls: Scope PSB FILTER LINAC3 Source ER EE ETL EI IEL ITE LEIR PS Pulsing at 10 Hz (continuous) New E ramping cavity Repetition Rate 5 Hz New Power Converters PPM 1 AQN / injection 2 CCVs / cycle for inj & ej Improved vacuum Powerful e- cooler New Converters New RF LL Injection: new septum + upgraded kicker & bump

© 2001 By Default! A Free sample background from Slide 11 LEIR Controls: Architecture OPERATOR CONSOLES OPERATOR CONSOLES FIXED DISPLAYS CERN GB ETHERNET TECHNICAL NETWORK FILE SERVERSAPPLICATION SERVERS SCADA SERVERS RT Lynx/OS VME FRONT ENDS PLCs LHC MACHINE Vacuum. other BDI, RF, PC, Kicker, … PROFIBUS TCP/IP communication services OPTICAL FIBERS TCP/IP communication services PUBLIC ETHERNET NETWORK TIMING GENERATION TTT T T TT

© 2001 By Default! A Free sample background from Slide 12 Outline LEIR Machine LEIR Machine –Generalities –Commissioning Planning LEIR Controls LEIR Controls –Scope –Architecture –Sequencing & Timing –Hardware –Front end Software –Application Software –General Services Conclusions – Issues’ summary Conclusions – Issues’ summary

© 2001 By Default! A Free sample background from Slide 13 Timing & Sequencing: Preliminary Decision CPS PSB Linac 2 Isolde P+ LEIR Linac 3 IONS P+ TGM 1 TGM 2 Scheme B CPS PSB Linac 2 Isolde P+ LEIR Linac 3 IONS P+ IONS Scheme A TGM ?? Accepted in May 2003

14

© 2001 By Default! A Free sample background from Slide 15 Timing & Sequencing : Operational Requirements LEIR is PPM (Pulse to Pulse Modulated) Nominal : 3.6s cycle Early Mode: 2.4s cycle InjectionsElectron coolingAcceleration Ejection NORMAL Operation

© 2001 By Default! A Free sample background from Slide 16 Timing & Sequencing : Operational Requirements (cont’d) Timing & Sequencing : Operational Requirements (cont’d) MD / Commissioning Operation Very long injection plateaus Very long injection plateaus –Purpose: perform life-time measurements,…. –Arbitrary length (> 10 sec) –No acceleration neither extraction –No synchronisation with PS (LEIR is stand-alone)

© 2001 By Default! A Free sample background from Slide 17 Timing & Sequencing : AB/CO Proposal 2 operational modes 2 operational modes 1. Nominal Mode –PS and Lin3 - LEIR are coupled –PS and LEIR share the same SC length 2. MD Mode –New MTG dedicated to this mode –PS and Lin3 - LEIR are decoupled. LEIR is standalone –LEIR SC length is arbitrary Fully integrated into CBCM Fully integrated into CBCM –Standard facility – Relies on Supercycle sequence SPS in 2004 –MTG Master/ Slave switching mechanism - Remote ctl

© 2001 By Default! A Free sample background from Slide 18 MD Operation: Very long injection plateaus Sequence of supercycles MD Operation: Very long injection plateaus Sequence of supercycles Current F1-in lead-in supercycle Supercycle with 3 flat cycles F1 Supercycle with 3 flat cycles F1 F1-out.... lead-out supercycle Arbitrary number of executions Current F1-in lead-in F1 F1-out.... lead-out F1 Arbitrary number of executions “normal” supercycle LHC-early Example 1 Example 2

© 2001 By Default! A Free sample background from Slide 19 Outline LEIR Machine LEIR Machine –Generalities –Commissioning Planning LEIR Controls LEIR Controls –Scope –Architecture –Sequencing & Timing –Hardware –Front end Software –Application Software –General Services Conclusions – Issues’ summary Conclusions – Issues’ summary

© 2001 By Default! A Free sample background from Slide 20 Outline LEIR Machine LEIR Machine –Generalities –Commissioning Planning LEIR Controls LEIR Controls –Scope –Architecture –Sequencing & Timing –Hardware –Front end Software –Application Software –General Services Conclusions – Issues’ summary Conclusions – Issues’ summary

© 2001 By Default! A Free sample background from Slide 21 Outline LEIR Machine LEIR Machine –Generalities –Commissioning Planning LEIR Controls LEIR Controls –Scope –Architecture –Sequencing & Timing –Hardware –Front end Software –Application Software –General Services Conclusions – Issues’ summary Conclusions – Issues’ summary

© 2001 By Default! A Free sample background from Slide 22 General Services : Monitoring Requirements from May 2005 Requirements from May 2005 –Interactive tool for operators: survey + remote reset of computers –To be monitored: All Front EndsAll Front Ends All Back EndsAll Back Ends All PLCs connected to the CO system (RF, vacuum,PC,…)All PLCs connected to the CO system (RF, vacuum,PC,…) Requirements not specific. Fully addressed by the new Monitoring System provided by ABCOIN. Requirements not specific. Fully addressed by the new Monitoring System provided by ABCOIN.

© 2001 By Default! A Free sample background from Slide 23 General Services : OASIS Requirements from May 2005 Requirements from May 2005 –Full nAos functionality –High priority for machine physicists –1 common triggering for Lin3-LEIR-PS OASIS Mandate for 2005 OASIS Mandate for 2005 –OASIS deployment on all machines –nAos phased out Issues: missing staff Issues: missing staff –FE / Business Tier: 0.5 FTE –GUI Application: 0.5 FTE –Project in standby now Recommandations Recommandations –Prioritization of operational requirements (pre-requisite for staffing) –Decision on staffing for GUI: mandatory for 1 st April 2004 –Potential risk of having NO complete observation system CRITICAL (No HR affected) CAREFUL

© 2001 By Default! A Free sample background from Slide 24 General Services : Alarms Not possible today to foresee which Alarms system will be deployed for LEIR Not possible today to foresee which Alarms system will be deployed for LEIR More accurate estimate by end of May 2004 More accurate estimate by end of May possible solutions for LEIR commissioning 2 possible solutions for LEIR commissioning

© 2001 By Default! A Free sample background from Slide 25 If initial schedule is met PS NEW USP FESA PS Gateway Old-New LASER Service PS : Existing USP Current New Gateway Broker

© 2001 By Default! A Free sample background from Slide 26 PS new USP FESA PS Gateway New-Old LASER Service LASER PS exisitng USP PS Alarm System Alarm console Current PS New Gateway Broker If initial schedule is NOT met

© 2001 By Default! A Free sample background from Slide 27 General Services : Alarms Not possible today to foresee the Alarms system for LEIR in 2005 Not possible today to foresee the Alarms system for LEIR in 2005 More accurate estimate by end of May 2005 More accurate estimate by end of May possible solutions 2 possible solutions Whatever the solution, for new LEIR equipment : Whatever the solution, for new LEIR equipment : Need of LASER source API integration into FESA framework

© 2001 By Default! A Free sample background from Slide 28 Conclusion & Issues Commissioning LEIR looks challenging ! Commissioning LEIR looks challenging ! LEIR = test-bed for lots of new systems LEIR = test-bed for lots of new systems –Timing Receiver Cards –Integration of DSP HW –FESA framework –Console Manager + AP Framework –LASER –OASIS –Monitoring System

© 2001 By Default! A Free sample background from Slide 29 Conclusion & Issues Commissioning LEIR looks worrying ! Commissioning LEIR looks worrying ! Some concerns from the USER team Some concerns from the USER team –New machine with new systems Some concerns from the LEIR CO team Some concerns from the LEIR CO team –Technical issues –Human Resource issues Lots of issues to be addressed to meet the schedule! Lots of issues to be addressed to meet the schedule!