1BED & 2 BED APARTMENTS – TOTAL 40 UNITS
TOP FLOOR BRICK WORK IN PROGRESS
TERRACE SLAB – SHUTTERING IN PROGRESS
PLASTER IN TERRACE UNDER PROGRESS BLOCK 2 – 3 RD SLAB IN PROGRESS TERRACE SLAB – REINFORCEMENT WORK IN PROGRESS
THIRD SLAB WORK IN PROGRESS SHUTTERING COMPLETE
BLOCK TWO BRICKWORK IN PROGRESSSHUTTERING FOR THIRD SLAB IN PROGRESS BLOCK 2 – 3 RD SLAB IN PROGRESSTERRACE SLAB FOR BOTH BLOCKS
SHUTTERING FOR THIRD SLAB IN PROGRESS BLOCK 2 – 3 RD SLAB COMPLETEREINFORCEMENT WORK COMPLETE
FIXING OF WINDOW & DOORS IN PROGRESS BLOCK 2 – 3 RD TOP FLOOR BRICK WORK IN PROGRESS
STAIRCASE PLASTER IN PROGRESS
PLASTER IN STAIRCASE IN PROGRESS GROUND FLOOR LOBBY
EXTERNAL PLASTER IN AT FIRST FLOOR IN PROGRESS INTERNAL PLASTER IN PROGRESSPLASTER WORK AT UPPER LEVELS
PLASTER IN LOBBY AT GROUND FLOOR COMPLETE DOOR FRAMES BEING FIXED
INTERNAL PLASTER AT GROUND FLOOR COMPLETE KITCHEN WORK - AT UPPER LEVELS
KITCHEN AT UPPER FLOOR LEVELS DOORS TO ACCESS TERRACES AT UPPER LEVELS
KITCHEN PLATFORM FINISHING IN PROGRESS