1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.

Slides:



Advertisements
Similar presentations
PUNTA FUEGO LOT AREA: 600 SQM FLOOR AREA: 460 SQM CONSTRUCTED IN BATHROOMS WITH TOILET 2 POWDER ROOMS 3 UNITS 3 TONS FLOOR-MOUNTED A/C & 1 UNIT.
Advertisements

COST EFFECTIVE MASS HOUSING TECHNOLOGY
Dehradun DEHRADOON PHASE – I *All inclusive cost *Including Car parking *Club Membership Extra Registration amount i.e. Rs 100,000/- +10% of cost price.
.. 2 BHK and 3 BHK Apartments with world class amenities.
Classic Suraj Arcade.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
New Homes Construction Overview To Code 4 Long Meadow, Diss Mark Hart Divisional Construction Director.
WELCOME. Eco Pine Homes-I (Dharampur Project)
Furnishing example FURNISHING SOLUTION FOR STRADUN HOUSE.
SUPER DELUXE RESIDENTIAL AFFORDABLE PRICE Site : Kubera Nagar, Madipakkam. Near Velacherry MRTS Station, Chennai.
Fitting Door Frames To Cavity Brickwork & Brick Veneer Your Ref: from P11 of text M.S.Martin Sept 2005 M.S.Martin Sept 2005.
SEN BUILT versus UNBUILT SEN BUILT versus UNBUILT Source: Environment and energy sustainability: An approach for India, McKinsey & Company.
EventFlat Earnest Money Deposit10 Completion of Plinth10 Completion of slab 13 Completion of slab 23 Completion of slab 33 Completion.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
Up Small Window Bed Room 6 m 4 m 2 m 1 m 4 m Path Room Hallway 2.6m.
A project of Skywood Developers Pvt. Ltd. WELCOME TO.
Competency: Draw Floor Plans Objective: Identify floor plan symbols.
Technical boclair academy Building Drawings.
Furnishing example FURNISHING SOLUTION FOR CAVTAT HOUSE.
FLOORSFLATSTOTAL AREA FIRST SECOND THIRD ST, 2 ND & 3 RD FLOOR PLAN FLOOR PLAN OF 2 BHK LUX. APARTMENT ON PLOT NO.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
C o n c e p t p r e s e n t a t I o n. Project Impression a. Tower Views - Road side view Tower B Project Impression a. Tower Views - Road side view Tower.
How to build a two storey house
ARCHITECTURAL GUIDE OF PRIVATE HOUSES IN MOLFETTA Liceo Classico L. Da Vinci, Molfetta Giorgio Bruno Venere Altamura Antonella Capurso Federica Caradonna.
Project: Location Map Laa Capitol is the new residential project offering from Laa Builders & Developers. Located in the fast developing residential.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
It is not joined to another house. It is built of brick and stale. It has a lot of little corners. In front of the house there ‘s a garden with a lawn.
 Water Purifier.  CFL lamp and Ceiling Fan in each room.  Exhaust fan in kitchen & toilets.  Solar Water Heating System for Master Bedroom Toilet.
 Effective height of walls  The effective height of a loadbearing wall is assessed by allowing for the relative stiffness of the elements of structure.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
Orthographic Drawings
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
E N T E R P R I S E S. A COMMON MANS DREAM COME LIVE WITH US AT HEIGHTS.
Prestige Lake Ridge Yadalam Nagar, Subramanyapura Post, Uttarahalli, South Bangalore.
DREAMZ SUPRICHITH Location:HEBBAL Dreamz Infra India Ltd.
Where your dreams come true.... L IFE AT MIST is meant to be experienced, not seen. With top-of-the-line features Like UPVC Windows & Shutters, Gymnasium.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
By Prof.Kuldeep Nayi Sub : Building Construction ( )
Embassy Boulevard Yelahanka, Bangalore For Enquiry Call
Stands for Innovation. Contact No: Mail: Dreamz Siddesh - BELLANDUR
A HOUSE.
Krishna Riviera Heights 1205 Raj Nagar Extension Ghaziabad
RR Homes Builders & Flat Promoters
British houses.
Types of ground floors.
30 WEAVERS WAY Please find in the following existing layout of staircase at the above property. There is a ground floor and a first floor layout. The floor.
Curriculum for Excellence
AARNA Progress Report-January 2017
Building Structural Systems
CEN 180: Civil Engineering Drawing II
Graduation Project 2 Redesigning a Villa
Progress Charts.
AARNA Progress Report-June 2017
Competency: Draw Floor Plans
International Building Materials and components
::Address Location:: Premises No , Nayabad, Kolkata
What are the Requirements of an Effective Construction System?
Competency: Draw Floor Plans
Building Drawings.
Homes.
Competency: Draw Floor Plans
::Address Location:: 3160, Nayabad, Kolkata – ,
Timber Frame Panel with opening Typical panel comprises a series
MKCG MEDICAL COLLEGE & HOSPITAL, BEHRAMPUR, ODISHA
Presentation transcript:

1BED & 2 BED APARTMENTS – TOTAL 40 UNITS

TOP FLOOR BRICK WORK IN PROGRESS

TERRACE SLAB – SHUTTERING IN PROGRESS

PLASTER IN TERRACE UNDER PROGRESS BLOCK 2 – 3 RD SLAB IN PROGRESS TERRACE SLAB – REINFORCEMENT WORK IN PROGRESS

THIRD SLAB WORK IN PROGRESS SHUTTERING COMPLETE

BLOCK TWO BRICKWORK IN PROGRESSSHUTTERING FOR THIRD SLAB IN PROGRESS BLOCK 2 – 3 RD SLAB IN PROGRESSTERRACE SLAB FOR BOTH BLOCKS

SHUTTERING FOR THIRD SLAB IN PROGRESS BLOCK 2 – 3 RD SLAB COMPLETEREINFORCEMENT WORK COMPLETE

FIXING OF WINDOW & DOORS IN PROGRESS BLOCK 2 – 3 RD TOP FLOOR BRICK WORK IN PROGRESS

STAIRCASE PLASTER IN PROGRESS

PLASTER IN STAIRCASE IN PROGRESS GROUND FLOOR LOBBY

EXTERNAL PLASTER IN AT FIRST FLOOR IN PROGRESS INTERNAL PLASTER IN PROGRESSPLASTER WORK AT UPPER LEVELS

PLASTER IN LOBBY AT GROUND FLOOR COMPLETE DOOR FRAMES BEING FIXED

INTERNAL PLASTER AT GROUND FLOOR COMPLETE KITCHEN WORK - AT UPPER LEVELS

KITCHEN AT UPPER FLOOR LEVELS DOORS TO ACCESS TERRACES AT UPPER LEVELS

KITCHEN PLATFORM FINISHING IN PROGRESS