3/18/2016 000705-1 FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,

Slides:



Advertisements
Similar presentations
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.
Advertisements

WECC TEPPC Meeting SWAT Update
RPEWG Report to PCC Seattle, WA June RPEWG June Agenda 1.SRP Double PV-WW PBRC Adjustment Seven Step Process 2.Phase 1 PBRC Adjustment Review:
WECC TEPPC Meeting SWAT Update
REGIONS OF THE UNITED STATES
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Arizona Corporation Commission Workshop
Status of Arizona Coordinated Resource Management Efforts.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
2/16/2001ACC Energy Workshop – Summer Preparedness 2001 and SS-1 SRP Summer Preparedness 2001 and 2002 Presented to the Arizona Corporation.
1 The ABC’s of Water in Arizona A general understanding of water and the Hydrologic Cycle is necessary to have basis for unlocking more complex topics.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.
2006 BTA 8/5/ SSC-1 ACC BTA Requirements SRP’s Ten Year Plan Presentation Chuck Russell Salt River Project June 6, 2006 Phoenix, Arizona Arizona.
APS Deer Valley Facility Phoenix, Arizona June 18, AM -12 PM
Adding to the Fleet Ensuring SRP’s Long Term Generation Reliability May Millies, Manager - Power Generation Services.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
Physical Features of the United States
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
Texas Regions.
Energy Gateway Gateway West Project Gateway South Project
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Virtual Tour March PHOENIX ACTIVE MANAGEMENT AREA ~~ Virtual Tour ~~ arizona department of water resources – phoenix ama Physical SettingPhysical.
 2005 Pinnacle West Capital Corporation Special Open Meeting of the Arizona Corporation Commission 2005 Summer Assessment March 18, 2005 Arizona Public.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
Landforms of North America
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates,
Arizona Corporation Commission Energy Workshop February 16, 2001.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
Basic Geography. Compass Rose North North is always at the top of a map If you can read a map north is at the top North 2. What direction does North.
The Big Picture Cover Arizona April 15, Gains In Coverage Nationally Q1 2014Q3 2014Q Number gained coverage since baseline (Q Q3 2013)
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
Rivers and Mountains U.S Locations. Which mountain range runs through FDR’s home state of New York?
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
The Three Land Regions.
APS Ten-Year Plans th BTA Presentation
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 SRP Attachment K APS Attachment E SRP Facility – Scottsdale, AZ December 15 th, 2015.
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Dynamic Signal Workshop January 14, 2016 APA Office Phoenix, Arizona 1.
 30° North or South latitude  Inland areas separated from oceanic moisture by mountain ranges  Gobi Desert of Mongolia (the Himalayas)  Great Basin.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
Physical and Man-made Features of the United States
APA Customer Bubble Charts Work in Progress Updated January 25, 2016 (a.m.) (Contact: John Underhill ) 1.
USA Questions. What is the capital city of the USA?
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
APS/SRP 2 nd Quarter Stakeholder FERC Order 890 APS Attachment E SRP Attachment K APS Deer Valley Facility Phoenix, Arizona June 21, AM -12 PM.
CRFS Technical Committee Spring Meeting LC Operations Update March 15, 2016.
Navajo Transmission System
APS Deer Valley Facility Phoenix, Arizona June 22, AM -12 PM
Status of Arizona Coordinated Resource Management Efforts
Reservoir Operations and Water Supply Planning at Salt River Project
Lesson 34 The Southwest. Lesson 34 The Southwest.
Deliverability Maps for 2017 Peaking Capacity RFP
Arizona Geography GCU 221.
RPCG – 2026 CCTA Results and Next Steps
Nogales DC Tie Capacity
Presentation transcript:

3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23, 2008 NEVADA WESTWING KYRENE SILVER KING CORONADO CHOLLA (APS) MEAD McCULLOUGH MARKETPLACE BROWNING HASSAYAMPA RUDD PALO VERDE PINAL WEST 2008 SOUTHEAST VALLEY TBD 2011 JOJOBA SAGUARO (TBD, place holder for CATS only, no current SRP plans) 2008 SANTA ROSA TBD 2011 TBD RACEWAY (APS) 2010 TS5 (APS) 2009 NAVAJO GS SUGARLOAF (APS) 2009 MOENKOPI YAVAPAI PINNACLE PEAK (APS) 2010 RS20 TBD PINAL SOUTH 2011 NORTH GILA (APS) TBD

3/18/ ATTACHMENT B SALT RIVER PROJECT EASTERN 230kV SYSTEM January 23, 2008 GOLDFIELD THUNDERSTONE SANTAN TBD RS17 TBD BROWNING RS21 TBD 2011 SOUTHEAST VALLEY/RS22 TBD DINOSAUR RS23 TBD RS20 LOOP IN TBD RS TBD ROGERS DESERT BASIN PINAL SOUTH 2011 TO SILVER KING PINNACLE PEAK To CORBELL To SCHRADER CATSHV03 TBD EXISTING 230kV SUBSTATIONS FUTURE 230kV CIRCUIT EXISTING 230kV CIRCUIT FUTURE 230kV SUBSTATIONS GENERATING STATION DOUBLE CIRCUIT, PHASE TIED LINE

3/18/ BRANDOW WARD CORBELL ALEXANDER WESTWING KYRENE ANDERSON WHITE TANKS ORME SRP PINNACLE PEAK PAPAGO LIBERTY (W.A.P.A.) AGUA FRIA DEER VALLEY (APS) ROGERS TO APS OCOTILLO TO APS PINNACLE PEAK TO W.A.P.A. PINNACLE PEAK W.A.P.A. KNOX SCHRADER RUDD TBD (TBD, Contingent on Raceway to Pinnacle Peak 500kV Construction) TBD RS TBD ATTACHMENT C SALT RIVER PROJECT WESTERN 230kV SYSTEM January 23, 2008 TBD RS17 SANTAN THUNDERSTONE To BROWNING To RS24 EXISTING 230kV SUBSTATIONS FUTURE 230kV CIRCUIT EXISTING 230kV CIRCUIT FUTURE 230kV SUBSTATIONS GENERATING STATION DOUBLE CIRCUIT, PHASE TIED LINE To GOLDFIELD

3/18/ GENERATING STATION EXISTING LINE FUTURE LINE 115kV MIAMI PINAL SUPERIOR SPURLOCK MOONSHINE ELLISON FRAZIER ROOSEVELT TBD RAY MORRIS KEARNY NEW HAYDEN EXISTING SUBSTATION HAYDEN STEWART MOUNTAIN MORMON FLAT HORSE MESA GOLDFIELD 230kV OAK FLAT PINTO VALLEY KNOLL TO APACHE (AEPCO) TO THUNDERSTONE COOLIDGE (W.A.P.A.) TO SILVER KING 500kV SILVER KING 230 ASARC0 TBD TBD (230kV) SEE DETAIL DETAIL SUPERIOR 230KV SUPERIOR 115KV FUTURE SUBSTATION ATTACHMENT D SALT RIVER PROJECT EASTERN MINING AREA SYSTEM January 23, 2008 CARREL BONNEYBROOK (APS) 230kV TBD RS20 TBD (230kV)