3/18/2016 12:47 AM 1 Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening)

Slides:



Advertisements
Similar presentations
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Advertisements

Transportation Problem (TP) and Assignment Problem (AP)
Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
Chapter 10 Resource Management. Objectives Human Resource Management Capital Resource Management Managing the Resource Profile.
Project Management Operations -- Prof. Juran. 2 Outline Definition of Project Management –Work Breakdown Structure –Project Control Charts –Structuring.
PERT/CPM Models for Project Management
Chapter 9: Reducing Project Duration
Reducing Project Duration
Chapter 7 Networks and Scheduling Project Management for Business, Engineering, and Technology.
Reducing Project Duration: Project Crashing
5/18/2015 L. K. Gaafar PROJECT MANAGEMENT Time Management* Dr. L. K. Gaafar The American University in Cairo * This Presentation is Based on information.
Reducing Project Duration
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Example 2 nd Semester 2010/2011 Eng:
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
MANAGING PROJECT RESOURCES
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Structuring Projects.
Chapter 9: Reducing Project Duration
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening) Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening)
Presented by: Meysam rahimi
9-1 Chapter 9 Project Scheduling Chapter 9 Project Scheduling McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management - PERT/CPM What is project management? Consider building a house: Step A: Prepare site. (5 days) Step B: Build foundation. (8 days)
PROJECT MANAGEMENT Approaches
Project Management - CPM/PERT
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 Network Models Transportation Problem (TP) Distributing any commodity from any group of supply centers, called sources, to any group of receiving.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 8.0 Definition of Project Management Project  Series of related jobs or tasks focused on the completion of an overall objective. Project Management.
Network Flow Problems Example of Network Flow problems:
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
TOPIC-6- TIME-COST TRADE OFF
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Time-Cost Trade-off Models
Project Management 6e..
Reducing Project Duration
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Management Operations -- Prof. Juran.
Reducing Project Duration
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
ENGINEERING MANAGEMENT (GE 404)
Project Management Operations -- Prof. Juran.
Lecture 6: Time-Cost Trade-Offs
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
FACULTY OF ENGINEERING CONSTRUCTION AND BUILDING DEPARTMENT
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Presentation transcript:

3/18/ :47 AM 1 Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening)

3/18/ :47 AM 2  The results of the planning and scheduling stages of the critical path method provide a network plan for the activities making up the project and a set of earliest and latest start and finish times for each activity. normal  In particular, the earliest occurrence time for the network terminal event is the estimated “normal” project duration time, based on “normal” activity time estimates.  The results of the planning and scheduling stages of the critical path method provide a network plan for the activities making up the project and a set of earliest and latest start and finish times for each activity. normal  In particular, the earliest occurrence time for the network terminal event is the estimated “normal” project duration time, based on “normal” activity time estimates.  Time-Cost Trade-off

3/18/ :47 AM 3  To meet the customer contractually required time.  To recover time of delays, that occur in the early stages of the project, to avoid paying liquated damages, or avoid damaging the company relationship with the customer.  To complete a project early, free key resources and move on to another project.  To avoid adverse weather.  To receive an early-completion bonus.  To meet a client’s desire for expediting the project.  To meet the customer contractually required time.  To recover time of delays, that occur in the early stages of the project, to avoid paying liquated damages, or avoid damaging the company relationship with the customer.  To complete a project early, free key resources and move on to another project.  To avoid adverse weather.  To receive an early-completion bonus.  To meet a client’s desire for expediting the project.  Why Project Time Reduction

3/18/ :47 AM 4 1.Free Time  Reviewing the job logic (critical activities in parallel).  Reviewing duration of critical activities.  Use overlap.  Use subcontractor. 1.Free Time  Reviewing the job logic (critical activities in parallel).  Reviewing duration of critical activities.  Use overlap.  Use subcontractor.  How to Shorten Project Time

3/18/ :47 AM 5 2.Buy Time overtime  Have the existing crew work overtime. additional workers (resources)  Bring in additional workers (resources) up to practical limit. shifts  Work on multiple shifts. incentive payments  Achieve more output by offering incentive payments. advanced equipment  Use better/more advanced equipment.  Use more quickly installed materials. subcontractors  Use subcontractors.  Change construction method. 2.Buy Time overtime  Have the existing crew work overtime. additional workers (resources)  Bring in additional workers (resources) up to practical limit. shifts  Work on multiple shifts. incentive payments  Achieve more output by offering incentive payments. advanced equipment  Use better/more advanced equipment.  Use more quickly installed materials. subcontractors  Use subcontractors.  Change construction method.  How to Shorten Project Time

3/18/ :47 AM 6 a minimum increase in the project direct costsbuying timecritical path least cost The main purpose of this topic is to demonstrate a procedure to determine activity schedules to reduce the project duration time with a minimum increase in the project direct costs, by buying time along the critical path (s) where it can be obtained at least cost.  Purpose of Time Reduction Technique Assumption Assumption: It is assumed in all of the procedures that are presented in this topic that unlimited resources are available.

3/18/ :47 AM 7  Definitions Activity time-cost trade-off input for the CPM procedure

3/18/ :47 AM 8 1.Activity Direct Costs 1.Activity Direct Costs : include the cost of the material, equipment, and direct labor required to perform the activity in question. If the activity is being performed in its entirety by a subcontractor, then the activity direct cost is equal to the price of the subcontract, plus any fee that may be added. 2.Project indirect costs 2.Project indirect costs : may include, supervision and other customary overhead costs, the interest charges on the cumulative project investment, penalty costs for completing the project after a specified date, and bonuses for early project completion. 1.Activity Direct Costs 1.Activity Direct Costs : include the cost of the material, equipment, and direct labor required to perform the activity in question. If the activity is being performed in its entirety by a subcontractor, then the activity direct cost is equal to the price of the subcontract, plus any fee that may be added. 2.Project indirect costs 2.Project indirect costs : may include, supervision and other customary overhead costs, the interest charges on the cumulative project investment, penalty costs for completing the project after a specified date, and bonuses for early project completion.  Definitions

3/18/ :47 AM 9 Normal Activity Time-cost Point 3.Normal Activity Time: normal 3.Normal Activity Time: It is the normal time that is used in the basic critical path planning and scheduling based on the normal level of resource. 4.Normal Activity Cost: direct costs 4.Normal Activity Cost: The normal activity cost is equal to the minimum of direct costs required to perform the activity, and the corresponding activity duration is called the normal time.  The normal time is actually the shortest time required to perform the activity under the minimum direct cost constraint. Normal Activity Time-cost Point 3.Normal Activity Time: normal 3.Normal Activity Time: It is the normal time that is used in the basic critical path planning and scheduling based on the normal level of resource. 4.Normal Activity Cost: direct costs 4.Normal Activity Cost: The normal activity cost is equal to the minimum of direct costs required to perform the activity, and the corresponding activity duration is called the normal time.  The normal time is actually the shortest time required to perform the activity under the minimum direct cost constraint.  Definitions

3/18/ :47 AM 10 Crash Activity Time-cost Point 5.Crash Activity Time: 5.Crash Activity Time: is fully expedited or minimum activity duration time that is technically possible. 6.Crash Cost: direct cost 6.Crash Cost: is assumed to be the minimum direct cost required to achieve the crash performance time. Crash Activity Time-cost Point 5.Crash Activity Time: 5.Crash Activity Time: is fully expedited or minimum activity duration time that is technically possible. 6.Crash Cost: direct cost 6.Crash Cost: is assumed to be the minimum direct cost required to achieve the crash performance time.  Definitions

3/18/ :47 AM 11  The relationship between the activity direct cost and activity time may be straight line, continuous curve, discrete values, or point.  The direct cost tends to increase if less time is available for activity. simple linear  Time reduction approach (learned here) will be based on simple linear time-cost trade-off curves for each activity  The relationship between the activity direct cost and activity time may be straight line, continuous curve, discrete values, or point.  The direct cost tends to increase if less time is available for activity. simple linear  Time reduction approach (learned here) will be based on simple linear time-cost trade-off curves for each activity  Activity Direct Cost / Time Relationship Activity time-cost trade-off input for the CPM procedure

3/18/ :47 AM 12  The indirect cost tends to increase if more time is consumed for the project. linearly  The indirect cost is generally vary approximately linearly with the time.  The indirect cost tends to increase if more time is consumed for the project. linearly  The indirect cost is generally vary approximately linearly with the time.  Indirect Cost / Time Relationship

3/18/ :47 AM 13  Optimum Contract Duration Optimum contract duration = project schedule for minimum total cost Determining project schedule for minimum total cost

3/18/ :47 AM 14 The 8 step hand procedure presented below is a slight modification of the method developed by Siemens. The key element of this procedure is the cost slope and time available. The cost slope will be denoted by C ij for an arbitrary activity (i – j). 1.Cost Slope (C ij ) for an arbitrary activity (i – j) = [Crash cost (C d ) - Normal cost (C D )] ij / [Normal duration (D) - Crash duration(d)] ij 2.Time Available (TA ij ) = [Normal duration (D ) - Crash duration(d)] ij An “effective” cost slope, EC ij, is defined as the cost slope divided by the number of inadequately shortened paths, N ij, which contain activity (i –j) 3.Effective Cost Slope (EC ij ) = Cost slope (C ij ) / Number of inadequately shortened paths (N ij )  The procedure described below chooses from among all available activities to be shortened, the one with the lowest effective cost slope.  Modified Siemens Algorithm

3/18/ :47 AM 15 1.Prepare the project network and time estimates, and list in columns all paths through the network whose expected lengths are greater than the desired (scheduled) project duration, T s. The length of a path is merely the sum of the durations of all activities on the path in question. Also note at the bottom of each path column (row marked iteration 0), the time reduction that is required, i.e., expected path length minus T s. 2.List (in rows) all activities present in at least one of the listed paths noting for each activity its cost slope, C ij, and time reduction available, TA ij. 3.Compute the effective cost slopes, EC ij, and record them in the column headed iteration 1.  Modified Siemens Algorithm

3/18/ :47 AM 16 4.For the path(s) with the most remaining time reduction required, select the activity with the lowest effective cost slope. Break ties by considering the following ordered list: 1.Give preference to the activity which lies on the greatest number of inadequately shortened paths. 2.Give preference to the activity which permits the greatest amount of shortening. 3.Choose an activity at random. 5.Shorten the selected activity (i-j) as much as possible, which will be equal to the minimum of the following: 1.The unallocated time remaining for the selected activity (i-j), or 2.The smallest demand of those inadequately shortened paths containing the activity (i-j).  Modified Siemens Algorithm

3/18/ :47 AM 17 6.Sell back, or deshorten, as much time possible on paths that have been overcut, as long as this action does not cause any new paths to become inadequately shortened. 7.Stop of all paths have been adequately shortened. If not, recalculate those effective cost-slopes where any of the following have occurred: 1.A path which was inadequately shortened prior to this iteration, has been adequately shortened, or 2.All unallocated time for the activity just shortened has been consumed and there are one or more additional cost- slope/supply pairs for this activity. 8.Return to Step 4.  Modified Siemens Algorithm

3/18/ :47 AM 18  Example 1 The below network shows the activities of a small engineering project. Data of the project is given in the below table. The indirect cost is estimated to be SR100/day. It required to reduce the project duration to 17 days. Also draw the contract total cost/time curve and determine the optimum contract duration. Activity Code Time (day)Cost (SR) NormalCrashNormalCrash A B C D E ,100 F G H

3/18/ :47 AM 19 Project Network  Example 1

3/18/ :47 AM 20  Example 1

3/18/ :47 AM 21  Reduction Project Time from 22 to ActivityPath s Requiring Reduction Cost Slope Time Reduction Available Effective Cost Slope Iteration No

3/18/ :47 AM 22 1.Reduction Project Time from 22 to 17 day ActivityPath s Requiring Reduction Cost Slope Effective Cost Slope Time Reduction Available A-C-F-HA-D-HB-F-H A (0,1) B (0,2) C (1,2) D (1,4) F (2,4) H (4,5)  The cross-hatching in the above Figure is used to denote the activities that are not present in the path indicated at the head of the column.

3/18/ :47 AM 23  Reduction Project Time from 22 to 21 ActivityPath s Requiring Reduction Cost Slope Effective Cost Slope Time Reduction Available A-C-F-H A (0,1)70 1 C (1,2) F (2,4)90 1 H (4,5)150 1

3/18/ :47 AM 24  Reduction Project Time from 22 to 20 ActivityPath s Requiring Reduction Cost Slope Effective Cost Slope Time Reduction Available A-C-F-H A (0,1)70 1 C (1,2) F (2,4)90 1 H (4,5)150 1

3/18/ :47 AM 25  Reduction Project Time from 22 to 19 ActivityPath s Requiring Reduction Cost Slope Effective Cost Slope Time Reduction Available A-C-F-HA-D-HB-F-H A (0,1) B (0,2)80 2 C (1,2)150 2 D (1,4)30 2 F (2,4) H (4,5)150501

3/18/ :47 AM 26  Reduction Project Time from 22 to 18 ActivityPath s Requiring Reduction Cost Slope Effective Cost Slope Time Reduction Available A-C-F-HA-D-HB-F-H A (0,1) B (0,2)80 2 C (1,2)150 2 D (1,4)30 2 F (2,4) H (4,5)

3/18/ :47 AM 27 Project Duration (Days) Total Direct Costs (SR) Indirect Costs (SR) Total Costs (SR)  Direct Cost / Time Relationship

3/18/ :47 AM 28 Project Duration (Days) Total Direct Costs (SR) Indirect Costs (SR) Total Costs (SR)  Indirect Cost / Time Relationship

3/18/ :47 AM 29 Project Duration (Days) Total Direct Costs (SR) Indirect Costs (SR) Total Costs (SR)  Optimum Contract Duration

3/18/ :47 AM 30  Optimum Contract Duration Optimal Project Duration = 20

3/18/ :47 AM 31 The durations and direct costs for each activity in the network of a small engineering project under both normal and crash conditions are given in below Table. Determine the optimum duration of the contract assuming the indirect cost amounts to SR 125/ week. ActivityPreceded by NormalCrash Duration (weeks) Cost (SR) Duration (weeks) Cost (SR) A— BA CA DB EB FC GE,C HF ID, G, H  36,500  Example 2

3/18/ :47 AM A F C B D E G I H ESTFEF LSDLF Activity Time Cost Slope  Example 2

3/18/ :47 AM 33  Reduction Project Time from 59 to ActivityPath s Requiring Reduction Cost Slope Time Reduction Available Effective Cost Slope Iteration No

3/18/ :47 AM 34  Reduction Project Time from 59 to 57 ActivityPath s Requiring Reduction Cost Slope Effective Cost Slope Time Reduction Available A-C-G-I A100 2 C200 3 G I75 2

3/18/ :47 AM 35  Reduction Project Time from 59 to 55 ActivityPath s Requiring Reduction Cost Slope EC (1) EC (2) EC (3) EC (4) EC (5) Time Reduction Available A-C-G-IA-B-E-G-IA-C-F-H-I A C G I X2020 B150 X2 E50 X1 F300 X1 H40 X2

3/18/ :47 AM 36  Reduction Project Time from 59 to 53 ActivityPath s Requiring Reduction Cost Slope Effective Cost Slope (1) Effective Cost Slope (2) Effective Cost Slope (3) Time Reductio n Available A-C-G-IA-B-E-G-IA-C-F-H-IA-B-D-I A C G I XX2020 B X2 E50 X1 F300 1 H40 2 DXXXX0

3/18/ :47 AM 37  Reduction Project Time from 59 to 51 ActivityPath s Requiring Reduction Cost Slope EC (1) EC (2) EC (3) EC (4) EC (5) Time Reduction Available A-C-G-IA-B-E-G-IA-C-F-H-IA-B-D-I A XXX2020 C G I XXXX2020 B XX2020 E50 XX1 F300 1 H240 X2020 DXXXXXX0

3/18/ :47 AM 38  Reduction Project Time from 59 to 49 ActivityPath s Requiring Reduction Cost Slope EC (1) EC (2) EC (3) EC (4) EC (5) EC (6) Time Reduction Available A-C-G-IA-B-E-G-IA-C-F-H-IA-B-D-I A XXXX2020 C G I XXXXX2020 B X2020 E50 XXX1 F300 1 H240 XX2020 DXXXXXXX0

3/18/ :47 AM 39 Cycle #Project DurationDirect CostIndirect CostTotal Cost  Optimum Contract Duration

3/18/ :47 AM 40  Class work