EE EDR Workshop CERN March 2002 R M Brown - RAL 1 The VPT HV System lOverview of the architecture lThe HV filter card lRadiation tolerance lPower supply.

Slides:



Advertisements
Similar presentations
Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcap
Advertisements

CMS ECAL Annual Review - CERN Sept 2001 R M Brown - RAL 1 Test results from 500 preproduction VPTs R M Brown RAL - UK CERN 19 September 2001.
STFC RAL EE at SLHC CERN 15/04/08 R M Brown - RAL 1 EE at SLHC What do we expect at SLHC? EE Layout VPT vulnerability to radiation - Faceplate darkening.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
E0’ setup at CERN, , lab 187-R-D06, via bat 70, tel Is there a sock over the umbilical - if so how connected to chassis. and how far does.
CLIC Workshop 2009 Power Converters implications for CLIC machine protection 25/05/2015TE-EPC / S. Pittet1.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Measurement and Instrumentation Dr. Tayab Din Memon Assistant Professor Dept of Electronic Engineering, MUET, Jamshoro. ACTIVE FILTERS and its applications.
ION CHAMBER INTRODUCTION TRANSITION - HANDOFF FROM EESIC SESSION 1 21 SLIDES TOTAL OCT
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
Model Continuous Workstation Monitor, Dual Wire ©Copyright 2003 DESCO INDUSTRIES INC.
1 New dividers for LAV photomultipliers G.Corradi,D.Tagnani,C.Paglia, M. Raggi LAV working group CERN 3/2/2010.
A radiation-tolerant LDO voltage regulator for HEP applications F.Faccio, P.Moreira, A.Marchioro, S.Velitchko CERN.
Diode :- Clamper Positive Clamper The circuit for a positive clamper is shown in the figure. During the negative half cycle of the input signal, the diode.
Stephen Pemberton TE-MPE-EE 1 DQLPUR Prototype Testing Initial Results: Thermal Tests Voltage Drop Off Tests.
B W Kennedy, CCLRC Rutherford Appleton Laboratory VPTs for the CMS experiment B W Kennedy CCLRC Rutherford Appleton Laboratory St Petersburg, 26 April.
EE130/230M Review Session 1.Small Signal Models for MOSFET/BJT 2.MOS Electrostatics.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Siena, Oct th Topical Seminar on Innovative Particle and Radiation Detectors: Progress in Radiation and Magnetic Field tests of CAEN HV and.
CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering.
CMS Week, CERN, 2002 R M Brown - RAL 1 Performance Characteristics of Production VPTs R M Brown, B W Kennedy, P R Hobson (with crucial input from D J A.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
PSD8 September 2008, Glasgow.P R Hobson, Brunel University 1 Avalanche Photodiodes and Vacuum Phototriodes for the Electromagnetic Calorimeter of the CMS.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
CMS SLHC workshop, D.J.A. Cockerill (RAL)1 CMS SLHC Workshop The CMS ECAL Detector at SLHC D Cockerill RAL
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
25th June, 2003CMS Ecal MGPA first results1 MGPA first results testing begun 29 th May on bare die (packaging still underway) two chips looked at so far.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
Non - Inverting Amplifier
Colmar, 9-13 Sept. 2002LECC th Workshop on Electronics for LHC Experiments: Progress in Radiation and Magnetic Field tests of CAEN HV and LV boards.
B W Kennedy, CCLRC Rutherford Appleton Laboratory Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcaps K.W.Bell, R.M.Brown, D.J.A.Cockerill,
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
RESMDD02 July , Florence, A.Singovski, University of Minnesota1 Radiation hardness of the Avalanche Photodiodes for ECAL CMS detector at CERN.
HF HV Decision path Y.Onel. HV Micro PRR August 3, 2012 Follow up of August 3 rd Meeting At the meeting the HCAL HF group presented the HV PSU options.
NSS07 1 The HV Protection Boards For The RICH Detectors Of LHCb Claudio Arnaboldi, Tito Bellunato, Paola Gobbo, Davide Luigi Perego and Gianluigi Pessina.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Como, Oct 20017th Conf. on Advanced Technology and Particle Physics Radiation tolerance and magnetic field behavior of CAEN HV and LV boards for.
SLHC Working Group - Nadia Pastrone1 CMS ECAL Detector at SLHC SLHC high radiation environment  consequences on ECAL Bunch crossing period:
1 2. Design of BJT amplifiers 2.1 Types of BJT amplifiersTypes of BJT amplifiers 2.2 BJT amplifier biasing designBJT amplifier biasing design 2.3 BJT Optimum.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
1 Single event upset test of the voltage limiter for the ATLAS Semiconductor tracker TSL Experiment Number: F151 distance between power supplies and modules.
CMS/SLHC irradiation tests of current optical link components in March 06 K Gill
A discrete event system: the CMS Tracker interlock Icaleps 2005 Icaleps 2005 Andromachi Tsirou, CERN The CMS Tracker interlock system The CMS Tracker and.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
(1/16) 08/05/12 – RadWG meeting G. Spiezia, P. Peronnard, E. Lefteris, P. Oser, J. Mekki PSI tests - Comparator Results Devices under test and beam conditions.
HECII-Workshop Munich, 12./13. February 2009 Measurement Strategy Workshop on Technology Selection for the SLHC Hadronic Endcap Calorimeter, Munich 2009.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
HEP2001, Budapest, July 2001 R M Brown - RAL 1 The Vacuum Phototriodes for the CMS Electromagnetic Calorimeter P R Hobson, D C Imrie, O Sharif Brunel University,
HEC I chip design Short summary (J.Bán).
Capacitor Action Topics covered in this presentation: Capacitors on DC
LHC BLM system: system overview
THREE-PHASE GROUND-FAULT BASICS
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
Universal Dim Actuator UD/S
RPC HV-LV project Introduction System requirements and description
RF Local Protection System
RPC HV-LV project Introduction System requirements and description
Presentation transcript:

EE EDR Workshop CERN March 2002 R M Brown - RAL 1 The VPT HV System lOverview of the architecture lThe HV filter card lRadiation tolerance lPower supply specification lFault analysis lSummary

EE EDR Workshop CERN March 2002 R M Brown - RAL 2 VPT Gain vs bias voltage  G<5% for  V=10%  Single operating voltage for all VPTs (apart from handling fault conditions)

EE EDR Workshop CERN March 2002 R M Brown - RAL 3 Overview of EE HV System

EE EDR Workshop CERN March 2002 R M Brown - RAL 4 HV Distribution inside a Dee One quadrant is shown

EE EDR Workshop CERN March 2002 R M Brown - RAL 5 HV Distribution inside a SC Three of five filter cards are shown

EE EDR Workshop CERN March 2002 R M Brown - RAL 6 Filter network in SC Anode HV Dynode HV Signal to FPPA VPT

EE EDR Workshop CERN March 2002 R M Brown - RAL 7 5-Channel filter card Anode filter side Dynode filter side

EE EDR Workshop CERN March 2002 R M Brown - RAL 8 HV filter cards in SC

EE EDR Workshop CERN March 2002 R M Brown - RAL 9 Radiation tolerance HV filter card components have been irradiated under bias to: > 200kGy ( 60 Co)(~ 4x 10 year dose at  = 3) ~ n/cm 2 (~ 10 year neutron fluence) No failures occurred (A capacitor showed  C ~ 17% - to be followed-up) Irradiation of HV cables is just starting Further studies are planned of filter operation under irradiation

EE EDR Workshop CERN March 2002 R M Brown - RAL 10 Fault analysis - typical examples

EE EDR Workshop CERN March 2002 R M Brown - RAL 11 Fault analysis (2) ‘Extreme case’: 1% of all VPTs develop a short circuit from Anode/Dynode to earth.  single S/Cs: 19.5% with 1 bad VPT  I= 50  A,  V= -50V 2.4% with 2 bad VPT  I=100  A,  V= -100V 0.2% with 3 bad VPT  I=150  A,  V= -150V If Anode and Dynode both short to earth this is not a problem (the loss in gain on the other VPTs is < 5% for  V= -100V) However, if the Dynode shorts, but not the Anode, then V A -V D increases on the other VPTs  potentially damaging Therefore, need possibility to change V A or V D on one S/C. (Should be incorporated in HV fan-out in Control Room)

EE EDR Workshop CERN March 2002 R M Brown - RAL 12 Power supply specifications Output voltage:+1200V maximum remotely set with  V = 10V (or less) Output current:> 5mA (source) (to handle fault conditions) > 5  A (sink) Voltage ripple:50mV maximum Ramp rate:~10V/s (2 mins total) (Rise and Fall) Set in hardware (S/W control in addition?) Format:Rack-mounted (CAMAC or NIM/RS232) Integrity:Must be powered via UPS system

EE EDR Workshop CERN March 2002 R M Brown - RAL 13 Ramp-up/down Ramp-down OPAL experience: Graceful ramp-up/down essential (Several VPTs lost before going to UPS and 2 min ramp-down) RIE experience: Many VPTs draw large currents at 0.2 < B < 0.8T  Need to ramp-down HV following a fast quench (t ~ 280s) Ramp-up at 10V/s, current to charge cables is ~ 250  A (not a problem) a VPT may draw ~100nA for a short time (<< 200  A/quadrant) V A -V D Must not exceed 300V  Anode and Dynode Power Supplies must be interlocked

EE EDR Workshop CERN March 2002 R M Brown - RAL 14 Summary lThe HV system for the VPTs presents no special problems lPower supplies meeting the specification are available off- the-shelf (eg Iseg NHQ202) lSystem costs are dominated by distribution and on-detector filters lA systematic fault analysis has been made Initial irradiation studies of components with  and n are encouraging