1 11/19/2009 PHENIX WEEKLY PLANNING 11/19/2009 Don Lynch.

Slides:



Advertisements
Similar presentations
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
Advertisements

1 12/3/2009 PHENIX WEEKLY PLANNING 12/3/2009 Don Lynch.
1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.
1 10/1/2009 PHENIX WEEKLY PLANNING 10/1/2009 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 10/22/2009 PHENIX WEEKLY PLANNING 10/22/2009 Don Lynch.
1 9/3/2009 PHENIX WEEKLY PLANNING 9/3/2009 Don Lynch.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
1 7/02/2009 PHENIX WEEKLY PLANNING 7/2/2009 Don Lynch No Meeting this week due to July 4 th holidays. Slides have been updated. Next planning meeting will.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
1 1/22/2009 PHENIX WEEKLY PLANNING 1/22/2009 Don Lynch.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
10/11/20121 PHENIX WEEKLY PLANNING 10/11/12 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
12/22/20111 PHENIX WEEKLY PLANNING 12/22/2011 Don Lynch.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 11/5/2009 PHENIX WEEKLY PLANNING 11/5/2009 Don Lynch.
1 2/26/2009 PHENIX WEEKLY PLANNING 2/26/2009 Don Lynch.
1 11/12/2009 PHENIX WEEKLY PLANNING 11/12/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 10/8/2009 PHENIX WEEKLY PLANNING 10/8/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
1 10/22/2009 PHENIX WEEKLY PLANNING 10/29/2009 Don Lynch.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
1 7/23/2009 PHENIX WEEKLY PLANNING 7/23/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
1 10/15/2009 PHENIX WEEKLY PLANNING 10/15/2009 Don Lynch.
11/10/20111 PHENIX WEEKLY PLANNING 11/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
1 12/02/2010 PHENIX WEEKLY PLANNING 12/02/2010 Don Lynch.
1 8/27/2009 PHENIX WEEKLY PLANNING 8/27/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
10/20/20111 PHENIX WEEKLY PLANNING 10/20/2011 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
1 1/28/2010 PHENIX WEEKLY PLANNING 1/28/2010 Don Lynch.
1 9/24/2009 PHENIX WEEKLY PLANNING 9/24/2009 Don Lynch.
1 1/14/2010 PHENIX WEEKLY PLANNING 1/14/2010 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
12/15/20111 PHENIX WEEKLY PLANNING 12/15/2011 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
1 7/16/2009 PHENIX WEEKLY PLANNING 7/16/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 8/20/2009 PHENIX WEEKLY PLANNING 8/20/2009 Don Lynch.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
11/17/20111 PHENIX WEEKLY PLANNING 11/17/2011 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

1 11/19/2009 PHENIX WEEKLY PLANNING 11/19/2009 Don Lynch

2 11/19/2009 Install new gap5 N cable & pipe supports, cables and piping and leak test pipingin progress11/30 Close MMN Hatch and closeout WP11/30 Install rack components in RPC3 N racksin progress11/30 Attach cables to RPC3 N racks and to Detector ½ octantsin progress11/30 Reconnect electric and fiber to ECDone Install heaters and thermostat(s) for RPC3N thermal controlin progress11/30 Reinstall PHENIX North tunnel shieldingin progress11/20 Replace EC water hoses below EC and testin progress11/20 Reinstall ladder & dumb waiter on EC & Fold down EC platforms in IRDone Move MMS north, Install MuID CollarsDone DC East and West repairsin progress11/25 Pink sheets, white sheets, blue sheetsin progress12/1 Assemble shield wall base and wall in AHin progress11/30 Thanksgiving Holiday – no work11/2611/27 Roll in shield wall11/30 Start Run 10, All shutdown activities completed12/1 Remaining Tasks for Shutdown 2009 Task Start Date End Date

3 11/19/2009 Can we keep these?

4 11/19/2009 Continuing Tasks currently underway (elec.) Task Start Date End Date Remove temporary MegaPAC in sRPC1 rack and install new full MegaPAC and finish controls for itIn Progress12/1 VTX/FVTX LV Dist system evaluation (VTX Done)In Progress12/1 Prep for production of up to 39 boards in 4 crates (VTX/FVTX)In Progress12/1 VTX/FVTX cooling system interlock design Awaiting more infoTBD Evaluate possible design for 6x1 GL1 L1 triggers DesignIn Progress12/1 AH Crane 110 switch for lockoutIn Progress12/1 Test/replace rack transient suppression7/2012/1 Cordless phones in tunnel7/2012/1 Individual relays on all HV supplies7/2012/1

5 11/19/2009 Design supports for Beampipe upgradeIn Progress11/30 Fan Tray replacements (as time permits)In Progress11/30 Design support for FOCalIn Progress11/30 Design support for FVTXIn Progress11/30 Design & Fabrication support for VTXIn Progress11/30 More Continuing Tasks currently underway (mechanical) Task Start Date End Date

6 11/19/2009 Continuing Tasks currently underway (gas) Task Start Date End Date Get AC’s installed in mixing houseIn Progress12/1 Investigate shed/larger bottles for R134A7/2012/1 Replace damaged compressed air flowmeter7/2012/1 Add check valves to some supply lines (as needed)7/2012/1 Design and build heat exchanger for HBD systemIn Progress12/1 Replace/ regenerate HBD purifier and driers (late Fall)In Progress10/9 Send mass flowmeters out for recalibration (DC/PC, MuID, TOF.W)In Progress12/1 Replace/upgrade gas house PC’sIn Progress12/1 Run gas lines to North tunnel7/2012/1 Design and build gas humidifierIn Progress12/1 Layout and build North distribution panelIn Progress12/1

11/19/20097 Preparation for Run10 RIKEN/RBRC Itaru Nakagawa

11/19/20098 TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364 Distance from Beam Pipe 17"32"47"62" Film Badge Cr39 Film Badge Cr39 Film Badge Cr39 Film Badge Cr39 Nov. 11 ~ Dec. ?TK nTK nTK nTK n 5 Dosimeters (stay for whole run period)

11/19/20099 Dosimeter Extension + 10”

11/19/ Dosimeter Extension

11/19/ Short Term To Do List (from report) OASys camera alignment ✓ Swap LV distributor for St.1,Q4 w/ spare due to offset current ✓ Inspect Thermocouple in St-2, Oct.7 (readout somewhat low ~ 33 degrees) North St-3, Oct-1 high fake hit rate issue BCLK Timing tune

11/19/ Near Future Plan Clean up test bench Organize Spare boards  bookshelf Channel Map  database Cosmic data taking from Dec.1 MuTR Operating HV Values for Run10 – Need to prove better resolution in Run9

11/19/ Problem in ADTX

11/19/ Was OK before As of Oct.29 Right after LV distributor was replaced Trace back history: Nov.6 bad Nov.5 measurment failed. Nov.3 OK. Nov.31 OK. Thus the problem started sometime between Nov.3 and 6th.

11/19/ ADTX Chassis-2 Board-1 South arm, station 3, octant 2 and 7, non-stereo planes strip Chassis 1Chassis 2Chassis ADTX chassis 1ADTX chassis 2ADTX chassis 3 slot= slot= connector1357 Half Octant 1 Gap1 Number of chassis = 6 Gap2 Number of ADTX = 8 The LV distributor broke for Chassis-2 channel in Oct-29 and replaced then.

11/19/ With Calibration Pulse

17 11/19/2009 Expected IR Configuration For Remainder of Shutdown ’09 Now-Run Start MMS & CM in run position, EC and WC can be moved east west ~3 ft These dates are approximate and subject to change CM will not be moved for remainder of shutdown… no access to station 1 north

18 11/19/2009 Roof leaks in utility bathroom at northwest corner behind tech offices and over door between rack room and assembly hall Heat wrap tape for trailer bathroom toilet drains to prevent freeze/clogging in winter. Improved Rack Room AC performance: New AC on order General maintenance for Trailer Offices and Gas Mixing House stairs, ramps and siding, gutters, etc. (cleaning and repairing worn/rotted wood): Carter has placed work orders Icy conditions at mixing house north stairs: Need new Mixing House Gutter 2009 Building Maintenance Issues

19 11/19/2009

20 11/19/2009

21 11/19/2009

22 11/19/2009

23 11/19/2009

24 11/19/2009 Safety, Security, etc. 1. Reminder ODH 0 in effect in tunnels (ODH 0 web course or C-A Access or Collider User training. As of ~12/1 ODH 1 will be in effect. This will require ODH 1 training (1 year) and escape pak training (3 years). Also requires medical waiver form. Each worker in ODH 1 area must have an escape pak and O2 monitor with them at all times. 2. Getting closer to winter. Be extra aware of slip hazards, icy conditions. Report potential problems before we have an accident. 3. CAD LOTO procedure revised: Be aware of “look-alike” equipment. Use barriers or postings as necessary to prevent confusion.

25 11/19/ PHENIX Procedure Review Current Status: 147 Procedures Identified 80 (+4) Made Inactive (not currently in use, will require revision to re- activate if and when necessary, available for reference purposes) 12 CAD procedures relevant to PHENIX, all are current and up-to- date 40 (-3) PHENIX approved procedures. 10 (-16) are currently under review 30 (+13) are current and up-to-date 15 (-1) Proposed/Draft Procedures (never previously formalized)

26 11/19/2009 Technical Support during Run 10: Mechanical, Electrical & Gas system support Design, engineering, fabrication and testing for new beampipe Design, engineering, mechanical, electrical and gas system support for VTX, VTX support structure, VTX survey and VTX installation Mechanical, electrical & gas system support for RPC factory Engineering, design, procurement & fabrication for RPC3 South installation Facility planning maintenance & upgrade Mechanical, electrical and gas system support for future maintenance, repair & upgrades

27 11/19/2009 Projected Major Projects For 2010 Shutdown: 1.Install new beampipe 2.Install VTX 3.Install RPC3 South 4.Existing subsystem maintenance & upgrade 5.Facility maintenance and upgrade 6.Support for future upgrades

28 11/19/2009 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: No Meeting next week : Turkey Day !! Spotted on site recently