RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.

Slides:



Advertisements
Similar presentations
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Advertisements

CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
SIXTH MEETING OF THE ILC PROJECT ADVISORY COMMITTEE (PAC) 19/20 May 2011; Institute of Physics, Academia Sinica, Taipei, Taiwan 1.
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Bringing XBRL tax filing to the UK Jeff Smith, Customer Contact, Online Services,
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
John Carwardine 1 TDR Editorial WG Summary Global Design Effort John Carwardine.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Patrick Janot Physics Studies: Status on 31/08/15  Outline u The international context u The FCC-ee at Summer Conferences u The second year of the design.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
FALC Was “Funding agencies for linear collider” Now “funding agencies for large colliders” WHY ??
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Eugene October
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
ILC communication InterAction Collaboration 14 July 2011 Leah Hesla ILC communication at InterAction Collaboration meeting.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Brief summary of discussion at LCWS2010 and draft short term plan
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Global Youth Tobacco Survey (GYTS): Proposal Development
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
Technical Design Report preparation
The DBD: Outline and Scope
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Update of the Detector Program for ILC Sakue Yamada March
Yasuhiro Okada, Executive Director, KEK
Presentation transcript:

RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada

Contents Where we are now Interim Report ILCSC and PAC IDAG meeting in Granada and in future Status of 1 TeV physics simulation Cooperation with CLIC DBD format WG 2011/12/14SiD-meeting Sakue Yamada2

Oct. 2007: Call for LOIs was made by ILCSC appointment of RD to conduct the process Jan. 2008: Detector management was formed Mar.2008: IDAG formed, 3 LOI groups known Mar.2009: 3 LOIs submitted Summer 09: IDAG recommendation for validation and ILCSC’s approval Oct 2009: Work plan of the validated groups Mar:2009: IDAG began monitoring the progress End 2010: Interim report to be produced The final edit was finished. End 2012: Detailed Baseline Design Report Now RDR 2011/12/143SiD-meeting Sakue Yamada The time line of the LOI process

The interim report Edits were mostly completed end of October. The final edit required time. We asked additional information from the groups. ( supporting funding agencies to acknowledge) Design work was made in parallel. We expect the page layout to be completed soon. The title: International Linear Collider Physics and Detectors 2011 Status Report 2011/12/14SiD-meeting Sakue Yamada4

2011/12/14SiD-meeting Sakue Yamada5 The cover may look like this. The SiD detector will also have cut-out view.

Lessons It took much longer than originally expected. The drafts were prepared early Editing required a long time for several different reasons. Wordings ( Many abbreviations and jargons ) Different expressions for the same thing High quality figures, credits The communicators worked hard to pick up and solve these problems. Time lag made some items obsolete requiring updates. 2011/12/14SiD-meeting Sakue Yamada6 We must avoid these for DBD.

ILCSC, PAC Last ILCSC in Mumbai, August 24 Last PAC in Prague, November 14/15 The status of the detector groups and CTGs was reported. Each group sent a reporter to PAC. (This was important. Often PAC also provides a chance for discussion with the accelerator leaders.) 2011/12/14SiD-meeting Sakue Yamada7

2011/12/148SiD-meeting Sakue Yamada Status of Component R&D for feasibility proof, Baseline-detector definition, Integration study and preparation for Physics simulation of new benchmarks. These will be included in the DBD report. The groups reported in detail

Resources Also problems and issues have been reported. i.e. resource shortage, uncertainly, lack of engineering support Latest situation about resources in each region has been updated. Both ILCSC and PAC recognize these problem. In this context, the recent survey of the spin-off of detector R&D was encouraged strongly. 2011/12/149SiD-meeting Sakue Yamada

In my report to PAC The groups are doing their best under the difficult environment; barely sufficient R&D budget and human resources. The requirement to demonstrate the capability for the project proposal will be fulfilled (unless the environment becomes worse in the last year). 2011/12/14SiD-meeting Sakue Yamada10

Engineering Support Positive reaction from some labs this year: CLIC push-pull team joined ILC push-pull effort. In addition part-time support could be obtained from BNL and LAPP. They are working on the MDI issues mainly. 2011/12/14SiD-meeting Sakue Yamada11

ILCSC plans for post 2012 Since last year ILCSC plans the new scheme after the TDR phase. ILCSC itself, GDE and RD will terminate after TDR Transition to the new scheme will be made adiabatically. Next ILCSC meeting will be on February 2, in Oxford. (The plan for the future can depend on the LHC results. The study by the physics group will become important.) 2011/12/14SiD-meeting Sakue Yamada12

2011/12/14SiD-meeting Sakue Yamada13 Presently considered scheme (J.

IDAG monitoring IDAG keeps monitoring twice a year the activities of the detector groups the activity of the common task groups and matters related to physics and detectors. Your detailed plans for DBDs were presented in Eugene, last March during ALCPG11-WS, and in Granada, last September during LCWS11. IDAG thinks now the plan is concrete enough. 2011/12/14SiD-meeting Sakue Yamada14

IDAG monitoring (continued) In Granada discussions were made how IDAG will monitor the content of DBD in advance. The schedule and material for DBD to be monitored These have been agreed with the groups later. By February 2012: Outline of the contents By September: first draft IDAG can check these materials in April (Korea) and October(Texas). 2011/12/14SiD-meeting Sakue Yamada15

IDAG recommendation on Costing Last year IDAG recommended that the two groups use a common costing method. The working group on costing was formed. Some of the agreements between the groups, e.g. What to include in the cost, how to list Unit price for major materials Recently some details on magnet/coil costing 2011/12/14SiD-meeting Sakue Yamada16

Detector Costing (continued) By February 2012 each group will make the first update of the LOI cost according to the agreed method. And if there is a need to coordinate further, the WG will try that. 2011/12/14SiD-meeting Sakue Yamada17

Physics simulation for DBD Bench marks were listed. (3 TeV) Detector baselines were fixed. Various software tools have been prepared by the software CTG. Simulations could be started after an agreement was reached with accelerator colleagues on the 1 TeV beam parameters. 2011/12/14SiD-meeting Sakue Yamada18

Physics Simulation (continued) SB2009WG has been coordinating discussions with GDE since the PAC meeting in May. The plan was to fix the parameters in Granada. There have been a few updates or new schemes proposed from the accelerator people. They are almost settled, but the final conclusion is not reached yet. (This is a concern now. The remain time is short.) 2011/12/14SiD-meeting Sakue Yamada19

Cooperation with CLIC detector The most cooperation is made on the grass- root level and intensively. (e.g. Participation to CLIC-CDR) The joint WG for cooperation surveys and facilitate further cooperation where needed. CLIC group offered to each ILC group a list of possible items for contribution towards DBD. Each group discussed with CLIC group in Granada. Cooperation for 1 TeV simulation will be intensified. Further synergy will be welcome. 2011/12/1420SiD-meeting Sakue Yamada

Format of the DBD Coordination between the 2 groups, and also with GDE foreseen. Preparation has just started. A WG was formed, which will meet next week. So far known: 2 volumes (physics and detector volumes) Detector volume contains Introduction + 2 detectors Each detector part will be ~150 pages. 2011/12/14SiD-meeting Sakue Yamada21

Summary After 4 years of R&D one year left to complete DBD Interim report will be finished soon. We got lessons for DBD. IDAG has a concrete plan how to monitor the DBD drafts of the groups. Simulation of 1 TeV reaction should begin very soon. DBD format WG will discuss the DBD format soon. ILCSC will discuss the future ILC (LC) propelling scheme next February. 2011/12/14SiD-meeting Sakue Yamada22