RCWG Update to WMS March 7, 2012. Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.

Slides:



Advertisements
Similar presentations
Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
RCWG Update to WMS July 8, VCMRR008 - Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps NPRR700 approved at May 2015 WMS.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
Real Time Mitigation During Exceptional Fuel Cost Events.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
PRS Response to Steel Companies’ Appeal of NPRR’s 351 and 378 Tom Payton on behalf of PRS August 4, 2011 Disclaimer: This response attempts to capture.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
NPRR 617 Overview and Justifications. Overview Current protocols place restrictions on Day-Ahead Three-Part Supply Offers – Part 1 (Startup Offer) – capped.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
CMWG Update to WMS Report of CMWG Meeting of
1 Nodal Stabilization Market Call December 16, 2010.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Market Continuity WMS June 8, PUBLIC What is Market Continuity? The processes by which ERCOT market-related systems and activities are returned.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Valley Import Constraint Resmi Surendran. Valley Import Constraint Range of SFs – to in valley area – 0.03 to outside valley area Not.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Reliability Unit Commitment Discussion with QMWG
Exceptional Fuel Costs in LMP
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
John Dumas Director, Wholesale Market Operations
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
Resource Cost Working Group
NERC Congestion Management
Presentation transcript:

RCWG Update to WMS March 7, 2012

Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions re: how the verifiable costs were determined – will be discussed further Concerns raised about raising verifiable costs for storage while lowering them for other resources

Draft NPRR, Caps and Floors for Energy Storage Resources Policy issue identified – Because they are energy limited, how do we ensure that Energy Storage Resources are not included in RUC? Option 1: Set prices so high that RUC will never commit them? Option 2: Use an administrative measure such as a flag denoting them as ineligible for RUC? In depth discussions to begin March 23

NPRR385, Negative Price Floors REMINDER – Issues Identified by QMWG 1. Instances where ERCOT instructs a Resource to stay online at negative prices for reliability reasons. Already resolved but creates uplift. 2. Step change in topology due to forced outage causing large negative prices. 3. Step change in topology due to planned outage causing large negative prices.

NPRR385, Negative Price Floors – Alternative Solutions Price Floors In DAM and RT, prices to be determined at the time of SCED run – not at settlement. Floor would be set at -$251, which is just below lowest offer. Still need to determine whether it would be applied to HUBS and LZ calculations.

NPRR385, Negative Price Floors – Alternative Solutions Price Floors – Pros Addresses issues 2 and 3 Does not depend on any manual intervention by ERCOT operations If price floor is set at the SCED run when you set the prices say floor is a max of calc price or -$251. The market would know what to expect without any ambiguity as to manual interventions or pre-positioning. Would be good for hedging strategies – everyone knows price would never go below the floor.

NPRR385, Negative Price Floors – Alternative Solutions Price Floors – Pros Implementation might be made simpler if limited to Resource nodes only and performed at the calculation of the LMP of the Resource Node or Buss Doesn’t require any change to shadow price calculations Sometimes reliability requires that ERCOT must keep a unit online when prices are negative – at least their negative impact would be mitigated Having a price more consistent with reliability need

NPRR385, Negative Price Floors – Alternative Solutions Price Floors – Cons This is administrative pricing and not included in the optimization of the DAM or RT so the DAM awards could be impacted May create uplift – Load nodes will also be a negative price but there will be no money to pay them This was major discussion point at RCWG – EDF to give presentation on how it will create uplift Could also end up with not enough money to pay CRRs

NPRR385, Negative Price Floors – Alternative Solutions Stepping Down the Constraint Easing from a high constraint overload in downward increments in SCED within the NERC criteria for controlling a constraint Pros Addresses issues 2 and 3 May effectively mitigate very negative prices Having a price more consistent with reliability need

NPRR385, Negative Price Floors – Alternative Solutions Stepping Down the Constraint - Cons Process would have to be automated Complications in the logic in the process – either the actual automation or ERCOT discretion on the constraints themselves in terms of importance or significance of the constraint Actual visibility in terms of the operators not knowing what kind of response they are going to get with any of the constraints ERCOT worried about being out of compliance with NERC standards Would require additional operator training and possibly additional FTEs

NPRR385, Negative Price Floors – Alternative Solutions Impact Test Create a test that would identify generation pockets by noting large, positive shift factors and then temporarily modifying the shadow price caps in those instances Pros Addresses issues 2 and 3 Provides a systematic approach instead of manual intervention For certain scenarios, could potentially mitigate inflated load prices resulting in more appropriate prices in the load zone Cons Could possible require a long implementation time

NPRR385, Negative Price Floors – Alternative Solutions Allowing More Ramp Relaxing ramp rate sharing between SCED and regulation and allowing WGRs to ramp at least 20%/minute Pros Addresses 2 and 3 – but only to a limited degree Able to implement quickly Cons Only helpful for certain generators – those carrying Reg and WGRs

NPRR385, Negative Price Floors – Alternative Solutions VDI to Resource As soon as ERCOT identifies the constraint, prior to activating the constraint, ERCOT would send a VDI to the Resource to let them how many MWs they ultimately need to move in order to avoid negative price Pros Addresses 2 and 3 Would allow Resource to get to a lower output level much more quickly than SCED would allow Could be used in conjunction with Alternative # 2

NPRR385, Negative Price Floors – Alternative Solutions VDI to Resource - Cons Holds you to your offer curve ERCOT says not viable with current staff levels – would need one more operator on every shift It is not systematic – everyone might not be treated the same Difficulty would be determine where the unit needed to move – ERCOT would need new tools

NPRR385, Negative Price Floors – Alternative Solutions Time Limited Price Floor Limited to the time it takes the Resource to ramp down. Instead of changing the LMP – perform in settlements –keep the generator whole for difference between floor and negative price during “grace period”

NPRR385, Negative Price Floors – Alternative Solutions Time Limited Price Floor Pros Addresses 2 and 3 Potentially creates less uplift than alternative 1 Would maintain true pricing – would not change LMPs Would not impact ERCOT operations Cons Potentially creates more uplift Manual process for ERCOT settlements – settlements needs signal to use emergency payment that would always be -$251 rather than offer curve

NPRR385, Negative Price Floors – Alternative Solutions Looking for feedback from WMS… Choose one of the alternatives? Keeping working on other solutions?

Next Meeting – March 23 Dig into Storage NPRR Kick off NPRR432 Depreciation Schedule Discussions