LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.

Slides:



Advertisements
Similar presentations
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Advertisements

MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimators for LHC Phase II Collimation 26 October 2006 LARP Collaboration Meeting – Port Jefferson, NY Tom Markiewicz/SLAC Representing.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Beam LARP Rotatable Collimator Mechanical Engineering Discussion 03 October 2008 Phase II CERN ME Video Mtg. Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC.
LARP Rotatable Collimators for LHC Phase II Collimation 26 October 2006 LARP Collaboration Meeting – Port Jefferson, NY Tom Markiewicz/SLAC Representing.
Summary of Accelerator Systems Collimation Parallel Session 19 October 2007 LARP CM#9 - SLAC Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
1.3GHz Input Coupler for ILC
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
LARP Rotatable Collimators for LHC Phase II Collimation 18 April 2007 LARP Collaboration Meeting – Fermilab Tom Markiewicz/SLAC Representing Gene Anzalone,
1 LARP Collimator Engineering E. Doyle 2/3/05. 2 Review: SS Thermal Simulation 150mm OD 25mm wall Simply supported Heat: 1hr beam life, FLUKA results,
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 24 April 2008 LARP CM#10 Tom Markiewicz/SLAC BNL - FNAL-
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle1/20 Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
LARP Contributions to LHC Phase II Collimation
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
SLAC RC Status Report US LHC Accelerator Research Program
Recommendations of 12/16/05 review committee & SLAC response
LARP Collimation – Engineering & Analysis
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Collimator RC1
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
SNS PPU Cryomodule Thermal Shield
LCLS Vacuum System Plans (July 07)
Overview of RF Gun Specifications and Technical Issues
Presentation transcript:

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status Revised 1/30/07

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 2 /13 Outline –Winding and Misc Tests update –Braze Test plan forward –Thermal Test (Prototype Hardware) and Test Lab update –RC1 progress and near term plans

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 3 /13 Winding and Misc Tests update –10mm sq. OD/ 7mm sq. ID copper sample was bent into 10mm and 35mm radius configurations to check for distortions. Tube deformation inward (relative to Mandrel OD) as a result of winding is consistent with ANSYS results (about 0.2mm) for the 35mm radius bend. –Still on the list: Twist to failure for a measure of the margin of safety. Twist to determine maximum torque requirements. Section all samples to inspect for internal distortion shapes and smoothness of transitions.

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 4 /13 Braze Test update and plan forward –Klystron Manufacturing Braze Shop completed Jaw brazing onto the 200mm long Mandrel on 12/19/06. –Assembly is scheduled for vacuum bake and pump down testing in February. Bake temperature and duration per CERN Phase 1 specs? Hope to get info on magnitude of virtual leaks. –Will section Jaw and Mandrel for inspection after vacuum testing.

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 5 /13 Completed 200mm long Mandrel and Coil

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 6 /13 More Braze development tests planned –A second 200mm long Copper mandrel has been fabricated for more Jaw brazing tests. 4 of the 200mm long Jaws have been halved to 100mm long to practice transverse joint brazing. Cooling coil will be rolled into groove with ends extending through shaft for rolling process development. –Molybdenum to copper braze joint detail drawings have been released for fabrication. No date promised yet, SLAC and vendor shops to fabricate parts.

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 7 /13 Mo-Cu Braze Joint configuration 1 - Mandrel Dummy 2 - Mo Shaft Dummy 3 - Mo Backing Ring 4 - Cu Hub

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 8 /13 Single Jaw Thermal Test Hardware Progress –Clean Tent infrastructure upgrades complete. –Jaw 1/4 sections (qty 24) now at SLAC. –Full length Mandrel in fabrication at local vendor. Mid February date promised. Central bore machining details on hold pending Mo-Cu Hub joint braze test results. –Jaw Cooling supply and return piping assembly nearing completion.

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 9 /13 Jaw Cooling Piping TO JAW FROM JAW FROM CHILLER FLOW METER FLOW SWITCH THERMOCOUPLE WELL TO CHILLER BYPASS FLOW CONTROL

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 10 /13 RC1 progress and near term plans –3D models have been developed for prototypes of: U-Joint Drive Axle. –One piece diaphragm, integral with axle, worm gear and bearing preload features. End Support. –Bearing housing holds Axle rigid in gravity direction for 0 deg., 90 deg., and skew collimator orientations yet provides compensation in axial direction for required thermal expansions of Jaw and Shaft. Rotator mechanism.

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 11 /13 U-Joint Drive Axle 0.5mm thick diaphragm 30mm dia. shaft o.d. 80 tooth worm gear Diaphragm deforms radians to compensate for shaft sag and “slewing” of end supports

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 12 /13 End Support (water cooled) Squirt tube water cooling manifold Bearing Mount supports the gravity load but can flex to compensate for Shaft thermal expansion Weld to bellows base plate at top assy Tube clamp reacts torque but can flex to compensate for Jaw thermal expansion & tube shortening due to twist Rotation axis Surfaces have high emissivity coating to aid cooling

LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 13 /13 Rotator Mechanism