1 - NbTi-Nb transitions for the extremities (Clé et Bords droites): DESIGN OF THE WELDING CONFIGURATIONS & SAMPLES FOR TESTING AND QUALIFICATIONS: - Tuning.

Slides:



Advertisements
Similar presentations
Simona Bettoni and Remo Maccaferri, CERN Wiggler modeling Double-helix like option.
Advertisements

UNIT 16: Extrusion and Injection moulding Manufacturing Engineering Unit 16 Copyright © 2012 MDIS. All rights reserved. 1.
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Optimisation of Roebel cable for HTS accelerator magnets
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
(MT 207) B.Sc (ENGINEERING) LEVEL 2 (Semester 2)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Submitted to Puneet kamboj
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Thin Films for Superconducting Cavities HZB. Outline Introduction to Superconducting Cavities The Quadrupole Resonator Commissioning Outlook 2.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Specification of niobium sheets 031/05/2010 O. Capatina G. Arnau Izquierdo W. Weingarten S. Atieh.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Status of Activities at CERN
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Bellerophon on Pegasus S. Atieh RF structure development meeting.
WP 9.2 DDS Status, R.M. Jones, 25 th Oct 2010, WebEx Phone-in, Geneva 1 WP 9.2: DDS Status Roger M. Jones Cockcroft Institute and The University of Manchester.
Study of heat and chemical treatments effects on the surface of ultra-precision machined discs for CLIC X-band Accelerating Structure Review (24 Nov. 2014)
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Technology Department 1 TCDS material selection and qualification W. Weterings
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Fredrik Fors Mechanical Engineering, JLab 04/22/2016
Winding tests on Roebel cables
Crab – RFD prototype: Production Status Update
Crab Cavities: In-house Production Extremities
CRAB cavities Cryomodule review Tuner
Analysis of niobium material
Superconducting RF Crab Cavities
Status of the PANDA Solenoid Magnet Production in BINP
Large aperture Q4 M. Segreti, J.M. Rifflet
Status of the PANDA Solenoid Magnet Production in BINP
Crab – RFD prototype: Fabrication Status Update
STAP Central Technical Services: Manufacturing
Presentation transcript:

1 - NbTi-Nb transitions for the extremities (Clé et Bords droites): DESIGN OF THE WELDING CONFIGURATIONS & SAMPLES FOR TESTING AND QUALIFICATIONS: - Tuning Interfaces: Possible change of design to weld directly Niobium with Niobium: Nb-NbTi & Nb-Nb both options will be tested NbTiNb - Nb-Nb Final ellipsoidal welds (Clé et Bords droites):

2  MANUFACTURING OF THE WELDING TESTS & TOOLING for testing ON-GOING  Drawings available: EDMS

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Crab Cavities: In-house Production Shaping J-P. Brachet L. Prever-Loiri, A. Carvalho, V. Gerbant, M. Garlaschè, L. Giordanino, R. Leuxe … S. Atieh, A. Cherif, R. Claret, P. Freijedo, S. Langeslag, T. Tardy …

4 Lunette:

5 Shaping Lunette: Status Pressing Holders Sheet works in traction Tool #1.2 Different tests performed (Cu): - Gap between blank holder and sheet - Presence / absence of holder Shape precision Sheet thickness Ref. EDMS Test #9 SECT Z+ SECT X+ SECT Z- SECT X- Band =1.4mm thickness MIN =3.64 RF ÷3.73 EXT Band =0.5mm thickness MIN =3.35 RF ÷3.56 EXT Test #4

Ø Int = H1 = Ecart = H3 Ø Est = H1 = Ecart = Ø Est = H2 = Ecart = Ø Est = H3 = Ecart = 0.08 «Lunette n° 11» H2 H1 Ø Est THEO= Ø Int THEO= Ø=+0.1mm in elliptical tool Ø Int ~= H1 ~= 17 Ø Int ~= H1 ~= 20

SECT Z+ SECT X+ Section X+Section X-Section Z+Section Z- Err max profile Est Err min profile Est Err max profile Int Err min profile Int Err max RF profile EST Err min RF profile EST Err max RF profile INT Err min RF profile INT Ø int profile Est Ø int profile Int Ø est profile Int Ø est profile Est Thickness INT edge Thickness EXT edge Thickness INT RF edge Thickness EXT RF edge Planarity of INT flat surface Planarity of EXT flat surface SECT Z+ SECT Z- SECT X- Ø est Pint Ø est Pest Ø est Pint Ø int Pint Ø int P est Ø int P int Ø est P int Ø est P est Ø int Pest Ø int Pint Ø est P est Ø est P int Øint P int Ø int P est Ø int Pest Flatness for machining/weld tool SECT Z- SECT X+ SECT X Due to shape error at extrusion Overall shape and thickness are good! Correcting Radius shape via stamping (matricage). Circular Test pending

8 Cuvette:

9 Cuvette: Tool # 4.2 Results Cu tests performed to explore influence of : - Gap between blank holder and sheet -Presence / absence of holder Forming ratio results are promising Shape accuracy still not satisfactory As expected, blank holder and Ø EXT have great influence on thickness (& shape) … Further tests foreseen to optimize parameters for highest thickness  tool remachining Holder: 1mm gap Screws: 50Nm Holder vs. Free: 50/50 % Thickness MIN ~= 3.6mm

10 Extrusion Lunette 6x punches Tool #3.1 (& #3.2) Cu samples ready Last subcontracted parts by Friday (2WK delay)

11 Diabolo Steel Adiprene Steel Calculations being finalized for punching forces, tool sizing, shape of punch Planning: OK, prearranged DO closes today. Best bid 6-8WKS! REMINDER: piece on critical path

12 Diabolo: forming procedure

13 Material: Supply for Production 1 st batch of Nb sheets (Ningxia) CERN – 3mm, 4mm, 15mm, 25mm ISSUE: On 3x+3x sheets, local inclusions grinded manually to thicknesses below requirements Areas to be used for testing 1 st batch of NbTi sheets (Ningxia) : expected beg. WK9 – 15mm ISSUE: 15mm will actually be 13mm… OK for prod but 1mm thickness of margin 2 nd batch of Nb sheets (T. Denkai) : delivery end Feb. Still missing: NbTi for tuning bananas Greenlight of purchase once positive Weld results

14 Conclusions Shaping Test campaign ongoing Lunette results very promising Cuvette results good for forming ratio but shape and thickness to be improved Planning: Extrusion and Cuvette (#2 circular) -- delays still not critical Need to launch: Cuvette (#3 circular) Lunette (#1 circular) matricage test Lunette Elliptique Watch out for Diabolo Open points: Material for tools Machining + Welding : stress free or not Butt weld vs. Lip Machining : internal & external Single parts : design for production