THE HINGHAM LANDFILL  HMLP regularly receives calls from solar developers inquiring about building solar arrays at the landfill and on Town owned buildings.

Slides:



Advertisements
Similar presentations
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
Advertisements

Proposed Des Moines Airport Authority Council Workshop – October 25, 2010.
Land Use Issues for Solar and Landfill Gas Generation Presented to The Steering Committee for Missouri’s Comprehensive State Energy Plan October 28, 2014.
Overview Operation and Management Lease Agreement started September 19, County has received approximately $9.5 M in revenue: –$7.4 M.
Solar Array Build Prepared for the Town of Boxford By Sustainability Committee March 2014.
Town of Hopkinton Solar Energy Project Proposal March 2013 Presented by Hopkinton Sustainable Green Committee.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Solar Panels and HOAs – One Homeowner’s Experience Presented To: Solar Washington General Meeting By: Don Stimson Date: March 4, 2015.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Chapter 43 An Act Relative to Improving Accountability and Oversight of Education Collaboratives Presentation to Board of Elementary and Secondary Education.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Solar System Project Overview Presented by: Brandon Robertson, Town Manager April 29, 2014.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
A Member of Erste Bank-Group and Sparkassen Real Estate Leasing in Romania Harald Trinkl / Vasile Cristescu Bucharest, October 19th, 2006 National Leasing.
Refresher Course: Top Ten Things You Should Know About Pennsylvania’s Land Bank Legislation Karen Beck Pooley
Patty Bartlett Logan County Treasurer / Public Trustee.
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
ARTICLE 15 Energy Savings Programs Stabilization Fund.
Vacant Surplus City Property Administration & Finance Committee August 6, 2014.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
Towne Building Story Acton Community Housing Corporation Towne Building History Why a great project Development Steps Request for Proposal (RFP) Program.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
Qualifying Medfield as a Massachusetts “Green Community” Warrants # 34 & 35 Presented by the Medfield Energy Committee.
Presented by Natasha N. Hellerich UCF Associate General Counsel Contracts Workshop 2015.
Business Entities under the General Corporation Law of Delaware 1 Civil Service Bureau Reform & Development Department
TOWN OF TYNGSBOROUGH Article 6 Capital Exclusion Overview.
Town Of Douglas A Review of the Town’s Proposed Tax Incentive Financing (TIF) Agreement With American Pro Wind, LLC Presented To The Douglas Finance Committee.
Administrative Territorial Reform in Latvia The Ministry of Regional Development and Local Government.
W. Robert Patterson & Associates PV SOLAR PROJECT DEVELOPMENTS For the Plymouth Public Schools Bob Patterson November 22, 2010.
Convention Center Authority Republican Policy Group Presentation February 23 rd 2015.
Article 42 Town Wide Electric Aggregation. BE IT THEREFORE RESOLVED that the Town of Sudbury hereby: Publicly declares its intent to become an aggregator.
The Annual Analysis of Tax Bill Changes. Prepared by the Bedford Board of Assessors December 30, 2013.
Town of Orleans Wind Energy Project Berkshire Renewable Energy Summit June, 2005 Kevin Galligan
Presented By: Diana Golis Energy Innovations Summit Small Hydro: Opportunities & Challenges Holy Cross Energy October 27, 2014.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Shore Protection Act (O.C.G.A , et seq.) Karl BurgessApril 5, 2011 Photo of Choice.
1 Convention Center Authority Republican Policy Group Presentation March 23 rd 2015.
Proposed FY 2016 Budget Town of Lisbon Presentation to Board of Selectmen October 7, 2015.
WFEC and Its Rural Electric Cooperative Members Solar Power October 16, 2015 Fall PR-MR & Marketing Meeting.
Community Development Department COUNTRY CLUB HARBOR SINGLE FAMILY RESIDENTIAL-2 AND PARKS & GREENWAYS ZONING DISTRICTS REZONING APPLICATION #2511.
OPERATING ISSUES FOR MUNICIPAL AFFORDABLE HOUSING TRUSTS
Baby, It’s Cold Out There: Bristol County Assessors Association Annual Meeting December 4, 2015 The ATB & Solar Power.
Proposed Lisbon FY 2016 Town Budget Public Hearing – 7:00 PM Monday, February 8 th, 2016 Lisbon School.
TOWN OF TYNGSBOROUGH Ballot Question September 14, 2010 Capital Exclusion Overview.
Community Solar. Background Review of Electricity System mandated by Bill 1 – Nov “Our Electricity Future, Nova Scotia’s Electricity Plan” released.
Surplus City Property – Request for Proposals Administration & Finance Committee February 1, 2012.
Green Communities Grant Program Town of Lincoln March 8, 2010 icfi.com © 2006 ICF International. All rights reserved.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
Town of Bethlehem DG Bethlehem Solar, LLC Zoning Board of Appeals Wednesday, October 1, 2014 David Albrecht, P.E., PV Engineers, D.P.C. Virginia Cook,
CHARTER REVIEW COMMITTEE Chatham. Charter Review Committee Section 8-2 Periodic Charter Review  At least once every five years a special.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
SPRING 2006 TOWN MEETING Bernard Lynch Town Manager May 1, 2006 Continued from Monday, April 24, 2006 & Thursday, April 27, 2006.
Power Purchase Agreements (PPA) Owner’s Perspective What is a Power Purchase Agreement? Agreement to purchase power from a third-party provider Fixed term:
COMMERCIAL LAW.
Bringing Broadband to.
Rob Conley City of Hamilton
West Tisbury Board of Selectmen Cape Light Compact Update
PV SOLAR PROJECT OPPORTUNITIES
Contract Review and Processing
Retail Marijuana committee
Opportunities for Community Solar in New Hampshire:
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Municipalization of the Distribution System
Environmental Sustainability Manager
Delta Water Supply Project
Solar Energy Commercialization Session 11
Solid Waste Department Rate Stabilization Plan Recommendation
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

THE HINGHAM LANDFILL

 HMLP regularly receives calls from solar developers inquiring about building solar arrays at the landfill and on Town owned buildings.  There have been on and off discussions between HMLP and The Town several times over the years regarding a possible solar array at the landfill. For various reasons nothing has come to fruition.  As recently as spring 2014 The Town was approached by a developer who made a proposal for installing a solar array at the landfill and on the middle and high schools. Meetings were held between the developer, the DPW, HMLP, the School Department and the Town Administrator. The process went no further than having several meetings held.

 There are municipal lighting plants in Massachusetts which have had solar arrays constructed on their town’s facilities. Braintree is one of them. Other munis and their Towns are currently working with developers.  This past fall the Hingham Energy Action Committee, HMLP’s General Manager is a member of the committee, reached out to the Town Administrator to see if there was interest in having a solar array installed at the landfill.

 The concept that was being presented for consideration was one that has been used successfully in other Towns. The developer would build the array, sell all the electric output to the light plant and make PILOT payments to The Town for the use of their infrastructure.  The 1 st step in this process is to get permission from The Town to use the landfill for this purpose.

ARTICLE _ HMLP Solar Project Article _: Will the Town authorize, but not require, pursuant to M.G.L. c. 40, § 15A and all other applicable laws, the Board of Selectmen to enter into an agreement to transfer, in part, the care, custody, management and control, from the Board of Selectmen to the Hingham Municipal Lighting Plant of a portion of a parcel of land consisting of the surface of the capped landfill being located on Town of Hingham Assessor’s Map , and to authorize the Board of Selectmen to enter into all agreements and execute any and all instruments as may be necessary to effect said partial transfer of said parcel of land, on such terms and conditions as the Board of Selectmen deems in the best interest of the town, for the limited purpose of allowing the Hingham Municipal Lighting Plant to enter into a License, Lease and/or other Agreement with a third party for the construction, operation and maintenance of a solar generating facility on said parcel of land to generate electricity for distribution by the Hingham Municipal Lighting Plant, or act on anything relating thereto?

What is necessary to move the project forward?  Town Meeting votes to pass Warrant article  Per Town Counsel, HMLP and Town will sign an agreement. This agreement will clarify who is liable for what. HMLP will be liable for damage to landfill from solar facility. The Town will be responsible for continuing to operate and maintain the capped landfill.  HMLP issues a request for proposals to interested developers.  HMLP negotiates a power purchase agreement (PPA) with the selected developer. HMLP will buy all of the output of the facility for a fixed period of time subject to certain terms and conditions. The developer will make fixed tax payments to the Town. HMLP will draft the necessary agreements since it is the entity buying all the output and interconnecting the facility to its system.  The Developer will permit the facility. Solar facilities may be subject to local zoning approval and Massachusetts DEP approval if built on a capped landfill. The risk of permitting and constructing the facility is on the developer, not HMLP and its ratepayers. If it can’t get permitted, it won’t be built.

What is necessary to move the project forward? What is necessary to move the project forward?  Town Meeting votes to pass Warrant article

What is necessary to move the project forward? What is necessary to move the project forward?  Per Town Counsel, HMLP and Town will sign an agreement. This agreement will clarify who is liable for what. HMLP will be liable for damage to landfill from solar facility. The Town will be responsible for continuing to operate and maintain the capped landfill.

What is necessary to move the project forward? What is necessary to move the project forward?  HMLP issues a request for proposals to interested developers.

What is necessary to move the project forward? What is necessary to move the project forward?  HMLP negotiates a power purchase agreement (PPA) with the selected developer. HMLP will buy all of the output of the facility for a fixed period of time subject to certain terms and conditions. The developer will make fixed PILOT payments to the Town. HMLP will draft the necessary agreements since it is the entity buying all the output and interconnecting the facility to its system.

What is necessary to move the project forward? What is necessary to move the project forward?  The Developer will permit the facility. Solar facilities may be subject to local zoning approval and Massachusetts DEP approval if built on a capped landfill. The risk of permitting and constructing the facility is on the developer, not HMLP and its ratepayers. If it can’t get permitted, it won’t be built.

What is the business relationship between HMLP and Town?  There really is not a “business” relationship. The article as proposed, per Town Counsel, transfers custody and control of the surface of the landfill from the Town to HMLP for the sole purpose of putting a solar facility on it. If HMLP can’t reach acceptable agreements with the developer or the developer can’t get the facility permitted, no solar array gets built.  Town Counsel has said an agreement must be reached which releases the Town from any liability for damage to the landfill from construction of the array or from the panels being sited on it.  HMLP will have no responsibility for normal landfill operations and maintenance.

What is the business relationship between HMLP and the developer?  HMLP will negotiate a contract whereby it will buy all of the output of the facility. This is something HMLP and its agents do all the time as a regular course of operating.  There will also be a license or lease to the developer that will give them the right to put the panels on the landfill. The developer will own and operate the solar facility.  All of HMLP’s obligations under these agreements are contingent upon the developer getting the necessary permits to build and operate the solar facility.

What input will citizens have on permitting process? Citizens will have the same input they have on any other proposed construction under the permitting processes.

How big will it be? Since there is no agreement in place it is impossible to say with certainty. There is certainty in saying IT WILL ONLY BE SITED ON THE TOP OF THE LANDFILL AND NOT ON THE SIDES! Each time HMLP has had any discussions with any developer there has been mutual agreement that building on the slopes is impractical for both construction and financial reasons. I have received 3 rough estimates on how large an array can be sited there: one capable of producing approx. 600kw. HMLP’s total load in 2015 was approximately 208m kWh. A 600kw array could produce 800k kWh annually.

Where will it sit on the landfill and what will it look like?

How far from houses will it be? per Google Earth, the closest will be 617’ How far from houses will it be? per Google Earth, the closest will be 617’

How much higher is the top of the landfill from houses? per Massachusetts’ GIS and field measurements, at least 40’ or the height of a 4 story building How much higher is the top of the landfill from houses? per Massachusetts’ GIS and field measurements, at least 40’ or the height of a 4 story building

Per Google Earth, where the following pictures and houses are located relative to the landfill

View of the landfill from 8 Ridgewood

Rendering of the landfill from 8 Ridgewood w/ trees

Rendering of the landfill from 8 Ridgewood, no trees

View of the landfill from 10 Ridgewood looking at 12

View of the landfill from right side of 26 Ridgewood

View of the landfill from right side of 32 Ridgewood

Rendering of the landfill from right side of 32 Ridgewood w/ trees

Rendering of the landfill from right side of 32 Ridgewood, no trees

View of the landfill from front of 46 Ridgewood

Rendering of the landfill from front of 46 Ridgewood w/ trees

Rendering of the landfill from front of 46 Ridgewood, no trees

What do solar panels look like up close?

QUESTIONS?

Thank You