Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez 2009-12-17.

Slides:



Advertisements
Similar presentations
Sha Bai, Philip Bambade, Glen White FJPPL – FKPPL ATF2 workshop LAL, 11~13 February, 2013 Orthogonality of beam waist corrections in the presence of IPBSM.
Advertisements

Coupling Correction in ATF2 EXT 7 th ATF2 Project Meeting, december 2008 C.Rimbault, LAL Orsay.
EXT Beam Measurements & Corrections Dispersion, Coupling, Beta Matching 10th ATF2 Project Meeting, June M. Woodley1/31.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Optics for Skew Correction and Emittance Measurement Leo Jenner This talk is going to look familiar if you were at the recent LC-ABD meeting in Manchester…
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
A Brief Introduction of SAD for ATF2 Flight Simulator S.Kuroda(KEK) mini work shop for flight simulator(LAL)2008.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
ATF2 Tuning Updates Glen White, SLAC Sept
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
1 IR with elliptical compensated solenoids in FCC-ee S. Sinyatkin Budker Institute of Nuclear Physics 13 July 2015, CERN.
June 30, th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Intermediate  configurations at the IP for commissioning and optimization Sha BAI IHEP/LAL Philip BAMBADE LAL.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Study of alternative ILC final focus optical configurations Dou Wang (IHEP), Yiwei Wang (IHEP), Philip Bambade (LAL), Jie Gao (IHEP) International Workshop.
1 Update on Tuning Studies for the ILC and Application to the ATF2 James Jones ASTeC/Cockcroft Institute Daresbury Laboratory.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
J. Brossard, C. Rimbault a P. Bambade LAL / / 8-9 nov LAL 1 Exercising emittance measurements in the ATF EXT line Upgrade.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ILC luminosity optimization in the presence of the detector solenoid and anti-DID Reine Versteegen PhD Student CEA Saclay, Irfu/SACM International Workshop.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
Status of EXT coupling measurement analysis 9 th ATF2 project meeting C.Rimbault (LAL) S. Kuroda, T. Tauchi, N. Terunuma (KEK), G. White, M. Woodley (SLAC)
Tuning Knobs for ATF2: An Update Anthony Scarfe, James Jones The Cockcroft Institute LCWS’07 31 st May 2007.
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
ATF2 Lattice v4.5 Matching and Tuning Performance with Lucretia Glen White, SLAC LCWS2011 Granada, Spain.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
IP Tuning Task Updates Glen White, SLAC January
Measurements and analysis of beam parameters at post-IP wire-scanner
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
Tolerances & Tuning of the ATF2 Final Focus Line
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
ATF2 IP Tuning Task Simulation Updates
3rd ATF2 Project Meeting, December 18-20, 2006
Compensation of Detector Solenoid with Large Crossing Angle
CEPC main ring magnets’ error effect on DA and MDI issues
Emittance Diagnostics
IR Lattice with Detector Solenoid
Studies of crossing angle and SR effects for CLIC TENTATIVE
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez

Introduction Simulation to scan the minimum vertical beam size using the coupling and dispersion corrections with skew quadrupoles, the α waist scan knobs with final doublet and the β y knob with QM12.  at the Post-IP wire scanner (change QD0,QF1 from A, 70.84A to A, 66.87A)  nominal β x =8cm, β y =1cm optics  tracking in MAD with energy spread  1mrad rotation errors and 1% strength errors to all quads  dispersion correction: using skew quads QS1X and QS2X  coupling correction: using skew quads QK1X to QK4X  waist correction: using QD0FF and QF1FF  β y correction: using QM12FF

Orthogonal waist scan simulations in large β optics (β x =8cm, β y =1cm ) QD0 and QF1 strengths were found fitting with the MAD program to get at the Post IP wire scanner:  α x = 1.0, α y =0.0, δ QD0 /QD0 = -8.99e-4, δ QF1 /QF1 = -5.37e-3  α x = 0.0, α y =1.0, δ QD0/QD0 = -7.72e-3, δ QF1/QF1 = -1.36e-3 1mrad rotation errors and 1% strength errors (which is about 10 times the actual) to all quads in ATF2 line to get obvious effect. with errors added to final doublet and without to compare correction effect. waist scans in several steps.

Dispersion correction with quasi sum knobs of QS1X/QS2X Dispersion correction was done after waist scan since it will introduce a little coupling which described in Benoit’s presentation ( d=0&materialId=slides&confId=3511), and then correct with the skew quads coupling knobs. After check to compare the minimum vertical beam size corrected with quasi knob(KLQS2X=0.7KLQS1X) and sum knob(KLQS1X=KLQS2X), there is almost no difference of the minimum vertical beam size.

Coupling correction with QK1~4X Knob (normalised) QK1XQK2XQK3XQK4X choose first knob and then knob to correct coupling to minimize the vertical beam size at Post IP wire scanner. the is dominant especially in the nominal optics( β y * =0.0001m). scan in several steps in the strength limit of QK1X~4X, QK1,4X=20A, QK2,3X=5A

QM12FF scan β y at Post-IP wire when introduce 1% strength errors, the matching quads may change the beta function at Post IP wire scanner. That’s why to use matching quad to correct α x, β x, α y and β y. Choose QM12FF which will be to correct β y with no changing too much α y.

After multiknobs correction to find minimum vertical beam size without QD0&QF1 errors with energy spread

After multiknobs correction to find minimum vertical beam size with QD0&QF1 errors and energy spread

KLQD0&KLQF1 distribution relevant to minimum sigy at PIP waist scan in several steps. The green line is the nominal setting at PIP waist.

KLQ1~4X distribution relevant to minimum sigy at PIP The green line are the strength limit of the skew quads. Increase to 20A

KLQS1/2X&KLQM12 distribution relevant to minimum sigy at PIP

Conclusion and prospect After correction with all the multiknobs in the large β optics when introducing 1mrad rotation errors and 1% strength errors to all quads, the beam size go down to 6.7e- 7m, while the linear beam size is 4.66e-7m. In commissioning, these multiknobs could be realised by setting these knobs and scanning several times. We should prepare this in the software.