© Siemens Energy, Inc. 2008 Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.

Slides:



Advertisements
Similar presentations
Integrating the Healthcare Enterprise IHE Overview Keith W. Boone Interoperability Architect, GE Healthcare Co-chair, IHE Patient Care Coordination PC.
Advertisements

RP Designs Semi-Custom e-Commerce Package. Overview RP Designs semi- custom e-commerce package is a complete website solution. Visitors can browse a catalog.
iStar How to Create an Amendment
TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden.
Program Management Portal: Overview for the Client
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
DEX Publication Project OASIS PLCS TC Telecon 29 April 2008 Trine Hansen.
7.Implications for Analysis: Parent/Youth Survey Data.
(Project) SIGN OFF PROCESS June 21, 2010
AUDITS Process and Corrective Actions OIG RolesGAO ROLES – OIG –OIG Lead Auditor –OCFO – owner of MATS and Agency Audit Process –OEI AA – Designated OEI.
University of Southern California Enterprise Wide Information Systems Instructor: Richard W. Vawter.
Creating Architectural Descriptions. Outline Standardizing architectural descriptions: The IEEE has published, “Recommended Practice for Architectural.
Change Management Demo for IT 11/06/2013 Change Management, IT Meeting 11/06/
[Insert Project Name] Preliminary Design Review (PDR) [Insert Date of PDR] Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC)
Enterprise Business Information Model Enterprise Data Services.
Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2008 SISCO, Inc. Using CIMTool Margaret Goodrich, Manager,
Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall.
1 CIM User Group Conference Call december 8th 2005 Using UN/CEFACT Core Component methodology for EIC/TC 57 works and CIM Jean-Luc SANSON Electrical Network.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
K-12 Web Content Development Process
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Comments on doing a CIM Project
UCTE Viewpoint towards CIM – project report Chavdar Ivanov, Ph.D. UCTE Secretariat, Convenor of AhG UCTE format CIM User Group meeting, 12-15th May 2009,
© Siemens Energy, Inc Energy Automation CIM Model Management Kurt Hunter 2009 IEEE Power System Conference & Exposition March 18, 2009.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
European Model Exchange Standard based on - IEC , IEC (updated 2009) - IEC (updated 2009) Jay Britton
20th AIAA Advanced Measurement and Ground Testing Technology Conference Lessons Learned in AIAA Working Group Development E. Allen Arrington Dynacs/NASA.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
INFO 424 Team Project Practicum Week 2 - Launch report, Project tracking, Review report Glenn Booker Notes largely from Prof. Hislop.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
Massachusetts All-Payer Claims Database: Technical Assistance Group (TAG) September 8, 2015.
Copyright © Open Applications Group, Inc. All rights reserved OAGIS Project Definition Export Compliance Vivian Javier – CDC Software September 20, 2010.
Setting Up TGO User Accounts. Creating User Accounts for Other Users If your company has other users who need to use the Active Orders system, your company’s.
Doing a CIM Project. 22 CIM Design Center  A rule I learned about applying technology:  Understand the design center of the technology.  Use extreme.
> Title of presentation - Date - References11 Model Exchange and Naming -- Activity  Standard  New draft of standard has been created.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
1 MPLS Architectural Considerations for a Transport Profile ITU-T - IETF Joint Working Team Dave Ward, Malcolm Betts, ed. April 16, 2008.
Doc.: IEEE /0281r1 Submission James D. Allen (Appairent Technologies, Inc.) Project: IEEE P Working Group for Wireless Personal Area Networks.
Copyright © 2002 Open Applications Group, Inc. All rights reserved Open Applications Group Core Components WG Overview January 30, 2003.
TC CIM Model Manager Summary Kendall Demaree AREVA T&D Inc. March 2009.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Colorado Springs Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
HIOS Portal Release Issuer Training.  Provide an Overview of HIOS Portal Release 20 Enhancements  Outline CMS Portal UI Changes  Provide an Overview.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program MIS Web Portal Business Requirements Review Current.
Standards Certification Education & Training Publishing Conferences & Exhibits Automation Connections ISA EXPO 2006 Wed, 1:00 Oct 18.
Quarterly Geo/SIG Coordinator Webinar June 25, 2014.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
Project Execution Methodology
TEXAS NODAL (ERCOT REVISIONS)
TGn Editor Report Jan 2009 Date: Authors:
Global Grid Forum GridForge
CIM Test Development Process
ICOTS Helpdesk Training
SUNY Pre Award and Compliance Systems Institutional Review Board (IRB)
CIM Model Manager Report
Project Management Process Groups
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
IETF 87 DHC WG Berlin, Germany Thursday, 1 August, 2013
Adaptive Insights - Automated File Submission Guidelines
Presentation transcript:

© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009

Page 2 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Topics o Background o Responsibilities of CIM Model Manager o WG 13 CIM Roadmap o CIM Issues Process o CIM Versioning o Recent CIM Changes o CIM Priorities for 2009

Page 3 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Background Background o Prior to the formation of the CIM Users Group in 2005, the CIM UML model was passed between volunteers from WG 13 and 14 to make necessary changes o To assist with the establishment of the CIM Users Group, Siemens, ABB, and Areva agreed to fund the position of CIM Model Manager for the first three years.  Kurt Hunter, Siemens  2007 – Lars-Ola Osterlund, ABB  2008 – Kendall Demaree, Areva oFor 2009, Siemens agreed to fund the position again.

Page 4 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Responsibilities of CIM Model Manager Responsibilities of CIM Model Manager o Manage and maintain the integrated CIM UML model o Coordinate model changes with WG 14 and WG 16 o Manage the CIM issues list o Facilitate WG 13 Issues discussions o Produce the IEC document o Assist CIM UG in answering questions from users o Report to WG 19 and other IEC working groups

Page 5 Copyright © Siemens Energy, Inc All rights reserved. CMM Report WG 13 CIM Roadmap WG 13 CIM Roadmap o WG 13 Part 301 is on a yearly release cycle. o WG 13 CIM Roadmap provides an overview of planned and completed CIM UML model changes. o Serves as the main driver, in addition to CIM issues, behind changes to the CIM UML model.

Page 6 Copyright © Siemens Energy, Inc All rights reserved. CMM Report WG 13 CIM Roadmap Version Profile DraftJune 2008May 2009May 2010 TestIOP October 2008 IOP September 2009 IOP September 2010 ReleaseQ1 2009Q1 2010Q Addresse d Issues OWL meta data Tools, EA transition CIM Issues CIM for planning ERCOT issues Operational limits integration Dynamics Models DC models CIM Issues Multiple inheritance Datatypes OWL meta data Solution exchange CIM Issues Contextual models 2009 WG 13 CIM Roadmap

Page 7 Copyright © Siemens Energy, Inc All rights reserved. CMM Report WG 13 CIM Roadmap Typical Yearly Cycle Plan

Page 8 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues for 2009 CIM 2009 Planned Yearly Cycle 2009 Jan FebMarAprMayJunJulAugSepOctNovDec 2010 CPSM Interoperability Test Dynamics Interoperability Test UCTE Interoperability Test Finalize UML And Produce CIM 14 Release Resolve Issues from Interoperability Tests

Page 9 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process CIM Issues UML Model and Profile Changes Interoperability Tests

Page 10 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process CIM Issues Process consists of three primary components: o Issues Submission o Issues Resolution o Issues Tracking

Page 11 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Submission CIM Issues Submission o In the past issues have been written second hand from information in s, discussions at Interop Tests, etc. o Consequently, issues that could not be resolved quickly are frequently difficult to interpret when coming back to them. o Currently requiring issues to be written by the submitter, preferably using the CIM Users Group website.

Page 12 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Submission CIM Users Group Website:

Page 13 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Submission Model Issues Summary

Page 14 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Submission Submitting a New Issue

Page 15 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Submission New Issue Submission Form

Page 16 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Submission Tips for CIM Issues Submission o Be as specific and detailed as possible. o If possible, include a detailed proposed resolution to the issue. A UML model or UML class diagram can be submitted with the issue as an attachment. o For proposed model extensions include a detailed use case. o Review the CIM issues spreadsheet before submitting to determine is the issue has been submitted previously.

Page 17 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Submission CIM Naming Rules*: o Class names are UpperCamelCase (GeneratingUnit). o Attribute names are lowerCamelCase (raiseRampRate). o Association role names are UpperCamelCase. o Association role names are required, but association names are not. o Names shall be singular unless the concept is plural. o Names shall not include a unit name (“ratedVoltage”, not “ratedKV”). o Attribute names shall not include the class name. *(sample list, not exhaustive)

Page 18 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Submission CIM Naming Rules (cont’d)*: o Use of abbreviations is allowed, but not recommended. o Acronyms can be used, but the expanded terms must be included in the definition. o Association role names should use the corresponding end side class as the base role name. *(sample list, not exhaustive)

Page 19 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Submission CIM Issues Spreadsheet includes fields for: o Working Group (WG 13, WG 14, WG 16 or combined) o Issue No. (Unique # assigned by CMM) o Author / Contact Information o Date Submitted o Package (Wires, Core, Assets, etc.) o Description of Issue o Proposed Resolution o Decision o Person Assigned o Due Date Status

Page 20 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Resolution CIM Issues Resolution o Simple issues may be resolved by the CMM and then sent to WG 13 members for approval. o More complex issues will be discussed during WG 13 and WG 14 CIM issues conference calls. Resolution of an issue may be reached during calls or may be deferred to the next WG 13 or WG 14 meeting. o Complex or controversial issues will be discussed face to face at WG 13 and WG 14 meetings. o All WG 13 CIM changes are tracked in a spreadsheet.

Page 21 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Resolution CIM Changes Spreadsheet includes fields for: o Change Number (assigned by CMM) o Action (New, Change, Delete) o Package (Wires, Core, etc.) o Subject (Affected class, attribute, or association) o Subject Type (Class, Attribute, or Association) o Description o Issue Reference Number (from CIM Issues List) o New CIM Revision o Author o Date of Change o Comments

Page 22 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues Process - Resolution CIM Changes Spreadsheet Sample

Page 23 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues CIM Issues – 1416 issues (WG 13 and 14) since 2000 WG 13WG 14Combined New Issues Since Jan Open Issues - Jan WG 13WG 14Combined Open Issues - Nov 2009 WG 13WG 14Combined

Page 24 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Versioning CIM UML Model Versioning Version names include both the major CIM version number and the working (minor) version number. In iec v04: o CIM version number is 14 o Working version is 4

Page 25 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Versioning CIM UML Model Versioning Versioning is maintained in both the UML model content and the model file name. File name example: iec61970cim14v04_iec61968cim10v21_combined.eap WG 13 CIM Version WG 14 CIM Version Enterprise Architect UML of combined WG 13 / WG 14 models

Page 26 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Versioning CIM UML Model Versioning The UML package IEC61968 includes class IEC61968CIMVersion. Attribute IEC61968CIMVersion.date = Attribute IEC61968CIMVersion.version = IEC61968CIM10v21 The UML package IEC61970 includes class IEC61970CIMVersion. Attribute IEC61970CIMVersion.date = Attribute IEC61970CIMVersion.version = IEC61970CIM14v04

Page 27 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Versioning CIM Version Attributes

Page 28 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes Recent Major CIM UML Model Changes o Mutual Coupling o State Variables (exchange of solved cases) o Equivalents o Wind Generating Unit o Tap Changers, Schedules, and Curves o Switch Schedule o Compound Data Types o Company (class deleted) o Load Model (subtypes removed) o Informative Package

Page 29 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes Mutual Coupling

Page 30 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes State Variables (Solution Exchange)

Page 31 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes State Variables (Solution Exchange)

Page 32 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes Equivalents

Page 33 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes Wind Generating Unit

Page 34 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes Tap Changers, Schedules, and Curves

Page 35 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes Switch Schedule

Page 36 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes Compound Data Types

Page 37 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes Load Model Removed subtypes of ConformLoad and NonConformLoad  Load  CustomerLoad  InductionMotorLoad

Page 38 Copyright © Siemens Energy, Inc All rights reserved. CMM Report Recent CIM Changes Informative Package Added new package "Informative" to contain non-standardized packages outside the scope of and Contains packages:  EnergyScheduling  Financial  MarketOperations  Reservation

Page 39 Copyright © Siemens Energy, Inc All rights reserved. CMM Report CIM Issues for 2009 CIM Issues/Priorities for 2009 oUCTE Exchange Support oState Variable oDisplay Layout Exchange oHVDC Modeling oEPRI CIM-for-Planning Dynamics Models oOld Issue Clean-up oEquivalents Enhancements oLoad Model Clean-up WG13/14 oMultiple Inheritance oCompound Datatypes oWG16 Integration

Page 40 Copyright © Siemens Energy, Inc All rights reserved. CIM Model Manager Report Questions?