March 2015doc.: IEEE 802.11-15/0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: 2015-03-12 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0144r2 Submission January 2014 Adrian Stephens, Intel CorporationSlide January 2014 WG Motions Date: Authors:
Advertisements

Doc.: IEEE 11-15/0454r0 March 2015 SubmissionSlide 1, Mark Hamilton, Spectralink Some more DS architecture concepts Date: Authors: Sli de 1.
May 2015 Agenda doc.: IEEE /0566r0 Mark Hamilton, Ruckus WirelessSlide 1 ARC-agenda-may-2015 Date: Authors:
March 2015doc.: IEEE /0471r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak March Closing Report Date: Authors:
May 2015 Agenda doc.: IEEE /0566r2 Mark Hamilton, Ruckus WirelessSlide 1 ARC-agenda-may-2015 Date: Authors:
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE 11-14/1213r0 September 2014 SubmissionSlide 1 Mark Hamilton, Spectralink AP Architectural concepts, and Distribution System Access Function.
March 2015 Agenda doc.: IEEE /0234r2 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-mar-2015 Date: Authors:
Doc.: IEEE 11-14/0562r4 November 2014 SubmissionSlide 1Norman Finn, Cisco Systems, Mark Hamilton, Spectralink ak and 802.1AC Convergence Function.
May 2015doc.: IEEE /0670r1 SubmissionSlide 1Mark Hamilton, Ruckus Wireless ARC Closing Report Date: Authors:
November 2014doc.: IEEE /1524r0 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: Authors:
January 2015doc.: IEEE /1524r0 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: Authors:
Submission doc.: IEEE 11-14/0599r0 May 2014 BroadcomSlide ak Figures Date: Authors:
July 2015doc.: IEEE /0954r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak July Closing Report Date: Authors:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
November 2011doc.: IEEE /1569r2 SubmissionMark Hamilton, Polycom, Inc.Slide 1 ARC Closing Report Date: Authors:
November 2015doc.: IEEE /1451r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak November Closing Report Date: Authors:
January 2016 Agenda doc.: IEEE /1519r3 Mark Hamilton, Ruckus WirelessSlide 1 ARC-agenda-jan-2016 Date: Authors:
January 2015 Agenda doc.: IEEE /0234r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-mar-2015 Date: Authors:
July 2015 Agenda doc.: IEEE /0727r0 Mark Hamilton, Ruckus WirelessSlide 1 ARC-agenda-july-2015 Date: Authors:
September 2015 Agenda doc.: IEEE /0997r1 Mark Hamilton, Ruckus WirelessSlide 1 ARC-agenda-sep-2015 Date: Authors:
January 2015 Agenda doc.: IEEE /1584r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-jan-2015 Date: Authors:
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
Doc.: IEEE /1054r1 Submission July 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-report-minutes-july-2011 Date: Authors:
Doc.: IEEE 11-14/0562r0 May 2014 SubmissionSlide 1Norman Finn, Cisco Systems, Mark Hamilton, Spectralink ak and 802.1AC Convergence Function Date:
May 2015 Agenda doc.: IEEE /0501r0 Mark Hamilton, SelfSlide 1 ARC-agenda-may-2015 Date: Authors:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /0432r0 Submission March 2012 Alex Ashley, NDS LtdSlide 1 Recommended changes to 802.1Q-2011 Date: Authors:
Doc.: IEEE 11-14/0562r7 November 2015 SubmissionSlide 1Norman Finn, Cisco Systems, Mark Hamilton, Spectralink ak and 802.1AC Convergence Function.
May 2014 Agenda doc.: IEEE /0488r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-may-2014 Date: Authors:
July 2014 Agenda doc.: IEEE /0753r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-may-2014 Date: Authors:
May 2016 Agenda doc.: IEEE /0518r0 Mark Hamilton, Ruckus WirelessSlide 1 ARC-SC-agenda-May-2016 Date: Authors:
ARC-SC-agenda-May-2016 Date: Authors: July 2009
ARC Closing Report Date: Authors: January 2016
Portal and 802.1AC Convergence Function
Closing Report Date: Authors: November 2008 September 2008
RR-TAG (802.18) to Liaison Report
ARC-SC-agenda-Mar-2016 Date: Authors: July 2009
ARC-agenda-march-2014 Date: Authors: July 2009
Closing Report Date: Authors: July 2007 July 2007
Closing Report Date: Authors: July 2007 July 2007
Closing Report Date: Authors: July 2007 July 2007
ARC-SC-agenda-Mar-2016 Date: Authors: July 2009
ARC SC Closing Report – July 2013
Portal and 802.1AC Convergence Function
ARC-agenda-minutes-november-2012
ARC-agenda-report-minutes-july-2011
ARC Closing Report Date: Authors: January 2016
ARC-SC-agenda-Mar-2016 Date: Authors: July 2009
ARC-agenda-mar-2015 Date: Authors: July 2009
ARC-SC-agenda-July-2016 Date: Authors: July 2009
TGak November Closing Report
ARC-agenda-may-2014 Date: Authors: July 2009
ARC-agenda-july-2015 Date: Authors: July 2009
ARC-agenda-july-2015 Date: Authors: July 2009
Task Group AY September 2017 Closing Report
ARC Closing Report Date: Authors: January 2016
ARC-agenda-sep-2014 Date: Authors: July 2009
ARC-agenda-may-2013 Date: Authors: July 2009
TGae Closing Report – January 2011
TGbc Closing Report Date: Authors: March 2019
ARC-agenda-july-2013 Date: Authors: July 2009
Closing Report Date: Authors: November 2007 November 2007
ARC-agenda-report-minutes-july-2011
ARC-agenda-sep-2015 Date: Authors: July 2009
Jan 2012 doc.: IEEE Jan aa –Robust Audio Video Transport Streaming Jacksonville Closing Report Date: Authors: Graham Smith,
TGak January Closing Report
Closing Report Date: Authors: January 2010 January 2010
Presentation transcript:

March 2015doc.: IEEE /0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 1 ARC Closing Report Date: Authors:

March 2015doc.: IEEE /0469r1 Submission Abstract This document is the closing report for ARC SC, March 2015, Berlin meeting Mark Hamilton, Spectralink, Corp.Slide 2

March 2015doc.: IEEE /0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 3 Work Completed MIB Design Pattern work item –Considered first draft pattern guidelines document –Agreed to add some more examples, and some editorial changes –Still need to find names more distinct than “Enabled” and “Activated” –With the above done (especially the naming?) ready to circulate for comments –Will start to scrub existing usage for any missing patterns next time IETF/802 coordination update –No news Joint meeting with TGak, and –Discussed how to model a DS implemented with 802.1Q bridges, in combination with 11ak bridging APs running GLK links.

March 2015doc.: IEEE /0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 4 Teleconference(s) None

March 2015doc.: IEEE /0469r1 SubmissionMark Hamilton, Spectralink, Corp.Slide 5 May 2015 Plans Two standalone meeting slots planned: –Design Pattern for MIB attribute use – Architecture topics: DSAF, DS_SAP, Figure 5-1 et seq –DS/AP/Portal architecture discussions One joint session with TGak –11ak architecture discussions