FP7: EuCARD after a year of preparation… A.Jeremie.

Slides:



Advertisements
Similar presentations
Preparation of the IA proposals within FP7 Working group “ Novel Accelerating Systems” Erk Jensen (CERN) for the working group: Brigitte Cros (LPGP, U.
Advertisements

CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
Collaboration K. Artoos, CTC 8th February 2011 Active Structures Laboratory Department of Mechanical Engineering and Robotics Université Libre de Bruxelles.
Nick Walker KEK-DESY meeting 7 th March 2005.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Stabilization of the FF quads A.Jeremie B.Bolzon, L.Brunetti, G.Deleglise, N.Geffroy A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
Luminosity Stability and Stabilisation Hardware D. Schulte for the CLIC team Special thanks to J. Pfingstner and J. Snuverink 1CLIC-ACE, February 2nd,
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
27/3/2009EuCARD NCLinac Kick-Off Meeting 1 Summary NCLinac Kick-Off CERN, 27-Mar-2009.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
1 LAPP in ATF2 Extraced from ANR bid A.Jeremie. 2 LAPP in ATF2 Current activities related to accelerators: The LAPP-Annecy team is currently developing.
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1 FP7 LED Potential program to develop inertial sensors Explore potential to achieve 0.1nm stability scale for the FD above a few Herz A.Jeremie, C.Hauviller.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
October 14, 2008 C. Hauviller 1 Review of the mock-up’s C. Hauviller.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Diagnostics Workpackage G A Blair EUROTeV Final Meeting, DESY, Hamburg 30 th January 2009 Tasks Summary.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
EuroTeV WP7 activities at DESY Group Members: R. Amirikas, A. Bertolini, W. Bialowons, H. Ehrlichmann Total Man Power: 1.5 reaching 2 (maximum)
ESGARD OMIA Sept EUROdrive and LED Motivation Work Packages Partners & resources.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
The Engineering Test Facility for nLC
Emittance Dilution and Preservation in the ILC RTML
EuroTeV WP7 activities in DESY
Topics on Vibration Issues
SuperB Injection, RF stations, Vibration and Operations
WP1 Metrology & Alignment
Oversea collaborators
FP7 LED A.Jeremie, L.Brunetti, N.Geffroy.
What Should We Do?.
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
CLIC-ILC BDS & MDI work.
A.Jeremie Some drawings from different CLIC’08 presentations
Presentation transcript:

FP7: EuCARD after a year of preparation… A.Jeremie

A bit of history 2006: Letters of intent October 2006: working groups getting better organised (LHC, SC, Novel tech.) Spring/Summer 2007: sub-groups defining proposals=> lots of meetings September 2007: ESGARD meeting at CERN=>proposals selected Autumn 2007: Writing of proposal and lots of cost reduction!! Painful! And…

Budget EU request = 30% of total budget

Budget

WP10 : JRA NCLinac CERN, JAI, CNRS, INFN, CI, CIEMAT, HIP, PSI, UU, ESRF, STFC, RHUL, JPK 1/02/08

WP10 : JRA NCLinac Deliverables: Simulation and measurement of the CLIC module (HOM damping, breakdown) Fabrication, test & measurement of prototype CLIC module Design, fabrication & test for nm stabilization of a CLIC quad module and a CLIC Final Focus stand Beam delivery tuning strategies tested at ATF2 Fabrication & tests of Laserwire and BPM at ATF2 Design, fabric. & test of phase control to ~10fs by RF & electro- optical monitors Simulations, selection and set-up for large scale coating production for lower 2 nd e yield & enhanced pumping fo DR’s. JPK 1/02/08

Task 3: Linac & FF stabilisation It is planned in this project to study the effectiveness of stabilisation equipment (such as seismic sensors, actuators, interferometers etc…) in a real accelerator environment. The equipment will be implemented at a CLIC quadrupole module inside the CTF3 facility, in the first stage with a quadrupole mock-up. In addition it is planned to use a CLIC standard module for comparing the vibration measurements with a laser interferometer (which can also serve as an alignment device) and the seismic sensors. The compatibility of these stabilisation devices with the alignment system that will be used in CLIC will be checked. A dedicated FF test stand will be built with a support and magnet prototype where the stabilisation will be developed. Furthermore, the stabilisation procedures will be simulated to ensure a better understanding of the beam-based feedback, stabilisation and the alignment. This will be tested on different accelerator facilities such as ATF2, CTF3 in preparation of ILC and CLIC.

Sub-task 1: CLIC quadrupole module CERN together with LAPP aims at demonstrating 1 nm quadrupole stability for the CLIC main linac quadrupole. – stabilisation feedback performance in different locations – 1 nm stability of the main linac quadrupoles in an accelerator environment – Test and evaluate Inertial sensors for accelerator environment – study vibration isolation for the main beam quadrupole – CERN will study the design and construction of main linac prototype magnet. The interferometric measurement system, developed in UOXF- DL, will be used to cross check results CERN aims at testing the compatibility between the repositioning system and the stabilization system in the real environment of the two beam test stand.

Sub-task 2: Final Focus Test stand LAPP together with CERN aims at exploring the potential to achieve 0.1nm stability scale for the final doublet quadrupoles > few Hz – design, simulation, construction and installation of the support – feedback design depending strongly on the final doublet support chosen. – LAPP will adapt feedback software to new configuration and boundary conditions and continue work to reduce costs. Oxford aims at studying the design, construction and deployment of an interferometric system – measure the motion between test magnet/girder and floor. – Installation of interferometric system with maximum resolution – correlate results with measurements done by inertial sensors. UOXF-DL will contribute to the Development of optimized low- emittance beam transport and feedback for ILC and CLIC – completing an ILC prototype ATF2 intra-train and pulse-pulse FB and FF – study the simulation of the global luminosity performance of ILC and CLIC.

Deliverables Deliverables of tasks Description/titleNature 1 Delivery month CLIC Module final reportRM Final Focus final reportRM48

Milestones Mile- stone Description/titleNature 1 Delivery month 2 Comment Commissioning of CLIC quadrupole module DM24 Complete module with girder and accelerating structure Characterization of noise/ vibrations sources in an accelerator OM Quadruple mock-up manufactured and ready for installation DM Installation of interferometers at CTF3 Module DM Installation of ATF2 final-focus alignment monitoring system DM Installation of ILC prototype FB/FF at ATF2 OM24 D = Demonstrator, O = Other

Conclusion Promised a lot of work within FP7 FP7 bid (EU request) is only 30% of whole budget needed for the project If accepted, the first euros will come at best in January 2009 This meeting is the perfect place to get organized!