S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.

Slides:



Advertisements
Similar presentations
CAPACITY PLANNING FOR PRODUCTS AND SERVICES.
Advertisements

Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies ( process, repetitive, product) The objective of the process strategy.
PRODUCTION AND OPERATIONS MANAGEMENT
Chapter 5 Strategic Capacity Planning
Capacity and Constraint Management
Facility Planning: Capacity. Capacity Planning Interrelated facility planning decisions: 1.Number of facilities and general type 2.Capacity 3.Locations.
MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Capacity and Constraint Management
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
© 2007 Pearson Education Constraint Management Chapter 7.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
Process Strategies How to produce a product or provide a service that
Management Decision Making Management Decision Making Supplement – Break Even Analysis.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
Operations Management Capacity Planning Supplement 7
Operations Management Capacity Planning Supplement 7
Operations Management
For Products and Services
Learning Modules Introduction to POM Chapters, 1, 2, & 3
Operating Processes process  A process is a set of tasks to be performed in a defined sequence  A process uses inputs to create outputs that are of value.
Operations Management
W8 8.3 Aggregate Planning, Material Requirement Planning, and Capacity Planning Operations Management © Ana G. Méndez University System, All rights.
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Lecture 12 Capacity Management and Planning (continued) Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM,
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Capacity and Constraint Management
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Capacity Planning Production Planning and Control.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies ( process, repetitive, product) The objective of the process strategy.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 29 1.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
Process Analysis process  A process is a set of tasks to be performed in a defined sequence  Process analysis describes how a process is doing and can.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Capacity Planning © 2006 Prentice Hall, Inc.
S7 - 1© 2014 Pearson Education, Inc. Capacity and Constraint Management PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
7 Capacity Planning PowerPoint presentation to accompany
Copyright ©2016 Cengage Learning. All Rights Reserved
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management yl.
S7 - 1© 2014 Pearson Education Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh.
© 2006 Prentice Hall, Inc.S7 – 1 Capacity Planning © 2006 Prentice Hall, Inc.
Chapter 7s Class 1.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Capacity Planning Pertemuan 04
Chapter 7s Class 2.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
Suppl Capacity Planning Heizer and Render Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl.
Operations Management Capacity Design
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Bottleneck Analysis and Theory of Constraints
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Analysis  Technique for evaluating process and equipment alternatives  Objective.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
S7 - 1 Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh Edition Principles of Operations.
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
MGT 657 operations management Lecture 6b
For Products and Services
7 3 Capacity Planning PowerPoint presentation to accompany
Constraint Management
Capacity and Constraint Management
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Operations Management
Operations Management Capacity Design
Stevenson 5 Capacity Planning.
Operations Management
Capacity Planning For Products and Services
Presentation transcript:

S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl

S7 - 2© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies The objective of a process strategy is to build a production process that meets customer requirements and product specifications within cost and other managerial constraints

S7 - 3© 2011 Pearson Education, Inc. publishing as Prentice Hall Capacity  The throughput, or the number of units a facility can hold, receive, store, or produce in a period of time  Determines fixed costs  Determines if demand will be satisfied  Three time horizons

S7 - 4© 2011 Pearson Education, Inc. publishing as Prentice Hall Planning Over a Time Horizon Figure S7.1 Modify capacityUse capacity Intermediate- range planning SubcontractAdd personnel Add equipmentBuild or use inventory Add shifts Short-range planning Schedule jobs Schedule personnel Allocate machinery * Long-range planning Add facilities Add long lead time equipment * * Difficult to adjust capacity as limited options exist Options for Adjusting Capacity

S7 - 5© 2011 Pearson Education, Inc. publishing as Prentice Hall Design and Effective Capacity  Design capacity is the maximum theoretical output of a system  Normally expressed as a rate  Effective capacity is the capacity a firm expects to achieve given current operating constraints  Often lower than design capacity

S7 - 6© 2011 Pearson Education, Inc. publishing as Prentice Hall Utilization and Efficiency Utilization is the percent of design capacity achieved Efficiency is the percent of effective capacity achieved Utilization = Actual output/Design capacity Efficiency = Actual output/Effective capacity

S7 - 7© 2011 Pearson Education, Inc. publishing as Prentice Hall Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls

S7 - 8© 2011 Pearson Education, Inc. publishing as Prentice Hall Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls

S7 - 9© 2011 Pearson Education, Inc. publishing as Prentice Hall Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4%

S7 - 10© 2011 Pearson Education, Inc. publishing as Prentice Hall Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4%

S7 - 11© 2011 Pearson Education, Inc. publishing as Prentice Hall Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4% Efficiency = 148,000/175,000 = 84.6%

S7 - 12© 2011 Pearson Education, Inc. publishing as Prentice Hall Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4% Efficiency = 148,000/175,000 = 84.6%

S7 - 13© 2011 Pearson Education, Inc. publishing as Prentice Hall Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Efficiency = 84.6% Efficiency of new line = 75% Expected Output = (Effective Capacity)(Efficiency) = (175,000)(.75) = 131,250 rolls

S7 - 14© 2011 Pearson Education, Inc. publishing as Prentice Hall Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Efficiency = 84.6% Efficiency of new line = 75% Expected Output = (Effective Capacity)(Efficiency) = (175,000)(.75) = 131,250 rolls

S7 - 15© 2011 Pearson Education, Inc. publishing as Prentice Hall Capacity Considerations 1.Forecast demand accurately 2.Understand the technology and capacity increments 3.Find the optimum operating level (volume) 4.Build for change

S7 - 16© 2011 Pearson Education, Inc. publishing as Prentice Hall Economies and Diseconomies of Scale Economies of scale Diseconomies of scale 25 - room roadside motel 50 - room roadside motel 75 - room roadside motel Number of Rooms Average unit cost (dollars per room per night) Figure S7.2

S7 - 17© 2011 Pearson Education, Inc. publishing as Prentice Hall Managing Demand  Demand exceeds capacity  Curtail demand by raising prices, scheduling longer lead time  Long term solution is to increase capacity  Capacity exceeds demand  Stimulate market  Product changes  Adjusting to seasonal demands  Produce products with complementary demand patterns

S7 - 18© 2011 Pearson Education, Inc. publishing as Prentice Hall Complementary Demand Patterns 4,000 – 3,000 – 2,000 – 1,000 – J F M A M J J A S O N D J F M A M J J A S O N D J Sales in units Time (months) Jet ski engine sales Figure S7.3

S7 - 19© 2011 Pearson Education, Inc. publishing as Prentice Hall Complementary Demand Patterns 4,000 – 3,000 – 2,000 – 1,000 – J F M A M J J A S O N D J F M A M J J A S O N D J Sales in units Time (months) Snowmobile motor sales Jet ski engine sales Figure S7.3

S7 - 20© 2011 Pearson Education, Inc. publishing as Prentice Hall Complementary Demand Patterns 4,000 – 3,000 – 2,000 – 1,000 – J F M A M J J A S O N D J F M A M J J A S O N D J Sales in units Time (months) Combining both demand patterns reduces the variation Snowmobile motor sales Jet ski engine sales Figure S7.3

S7 - 21© 2011 Pearson Education, Inc. publishing as Prentice Hall Tactics for Matching Capacity to Demand 1.Making staffing changes 2.Adjusting equipment  Purchasing additional machinery  Selling or leasing out existing equipment 3.Improving processes to increase throughput 4.Redesigning products to facilitate more throughput 5.Adding process flexibility to meet changing product preferences 6.Closing facilities

S7 - 22© 2011 Pearson Education, Inc. publishing as Prentice Hall Demand and Capacity Management in the Service Sector  Demand management  Appointment, reservations, FCFS rule  Capacity management  Full time, temporary, part-time staff

S7 - 23© 2011 Pearson Education, Inc. publishing as Prentice Hall Bottleneck Analysis and Theory of Constraints  Each work area can have its own unique capacity  Capacity analysis determines the throughput capacity of workstations in a system  A bottleneck is a limiting factor or constraint  A bottleneck has the lowest effective capacity in a system

S7 - 24© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Times for Stations, Systems, and Cycles process time of a station  The process time of a station is the time to produce a unit at that single workstation process time of a system  The process time of a system is the time of the longest process in the system … the bottleneck process cycle time  The process cycle time is the time it takes for a product to go through the production process with no waiting These two might be quite different!

S7 - 25© 2011 Pearson Education, Inc. publishing as Prentice Hall A Three-Station Assembly Line Figure S7.4 2 min/unit4 min/unit3 min/unit ABC

S7 - 26© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Times for Stations, Systems, and Cycles system process time  The system process time is the process time of the bottleneck after dividing by the number of parallel operations system capacity  The system capacity is the inverse of the system process time process cycle time  The process cycle time is the total time through the longest path in the system

S7 - 27© 2011 Pearson Education, Inc. publishing as Prentice Hall Capacity Analysis  Two identical sandwich lines  Lines have two workers and three operations  All completed sandwiches are wrapped Wrap 37.5 sec/sandwich Order 30 sec/sandwich BreadFillToast 15 sec/sandwich 20 sec/sandwich 40 sec/sandwich BreadFillToast 15 sec/sandwich20 sec/sandwich40 sec/sandwich

S7 - 28© 2011 Pearson Education, Inc. publishing as Prentice Hall Capacity Analysis Wrap 37.5 sec Order 30 sec BreadFillToast 15 sec 20 sec 40 sec BreadFillToast 15 sec20 sec40 sec  Toast work station has the longest processing time – 40 seconds  The two lines each deliver a sandwich every 40 seconds so the process time of the combined lines is 40/2 = 20 seconds  At 37.5 seconds, wrapping and delivery has the longest processing time and is the bottleneck  Capacity per hour is 3,600 seconds/37.5 seconds/sandwich = 96 sandwiches per hour  Process cycle time is = seconds

S7 - 29© 2011 Pearson Education, Inc. publishing as Prentice Hall Capacity Analysis  Standard process for cleaning teeth  Cleaning and examining X-rays can happen simultaneously Check out 6 min/unit Check in 2 min/unit Develops X-ray 4 min/unit8 min/unit Dentist Takes X-ray 2 min/unit 5 min/unit X-ray exam Cleaning 24 min/unit

S7 - 30© 2011 Pearson Education, Inc. publishing as Prentice Hall Capacity Analysis  All possible paths must be compared  Cleaning path is = 46 minutes  X-ray exam path is = 27 minutes  Longest path involves the hygienist cleaning the teeth  Bottleneck is the hygienist at 24 minutes  Hourly capacity is 60/24 = 2.5 patients  Patient should be complete in 46 minutes Check out 6 min/unit Check in 2 min/unit Develops X-ray 4 min/unit 8 min/unit Dentist Takes X-ray 2 min/unit 5 min/unit X-ray exam Cleaning 24 min/unit

S7 - 31© 2011 Pearson Education, Inc. publishing as Prentice Hall Theory of Constraints  Five-step process for recognizing and managing limitations Step 1: Step 1:Identify the constraint Step 2: Step 2:Develop a plan for overcoming the constraints Step 3: Step 3:Focus resources on accomplishing Step 2 Step 4: Step 4:Reduce the effects of constraints by offloading work or expanding capability Step 5: Step 5:Once overcome, go back to Step 1 and find new constraints

S7 - 32© 2011 Pearson Education, Inc. publishing as Prentice Hall Bottleneck Management 1.Release work orders to the system at the pace of set by the bottleneck 2.Lost time at the bottleneck represents lost time for the whole system 3.Increasing the capacity of a non- bottleneck station is a mirage 4.Increasing the capacity of a bottleneck increases the capacity of the whole system

S7 - 33© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Analysis  Technique for evaluating process and equipment alternatives  Objective is to find the point in dollars and units at which cost equals revenue  Requires estimation of fixed costs, variable costs, and revenue

S7 - 34© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Analysis  Fixed costs are costs that continue even if no units are produced  Depreciation, taxes, debt, mortgage payments  Variable costs are costs that vary with the volume of units produced  Labor, materials, portion of utilities  Contribution is the difference between selling price and variable cost

S7 - 35© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Analysis  Costs and revenue are linear functions  Generally not the case in the real world  We actually know these costs  Very difficult to verify  Time value of money is often ignored Assumptions

S7 - 36© 2011 Pearson Education, Inc. publishing as Prentice Hall Profit corridor Loss corridor Break-Even Analysis Total revenue line Total cost line Variable cost Fixed cost Break-even point Total cost = Total revenue – 900 – 800 – 700 – 600 – 500 – 400 – 300 – 200 – 100 – – |||||||||||| Cost in dollars Volume (units per period) Figure S7.5

S7 - 37© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Analysis BEP x =break-even point in units BEP $ =break-even point in dollars P=price per unit (after all discounts) x=number of units produced TR=total revenue = Px F=fixed costs V=variable cost per unit TC=total costs = F + Vx TR = TC or Px = F + Vx Break-even point occurs when BEP x = F P - V

S7 - 38© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Analysis BEP x =break-even point in units BEP $ =break-even point in dollars P=price per unit (after all discounts) x=number of units produced TR=total revenue = Px F=fixed costs V=variable cost per unit TC=total costs = F + Vx BEP $ = BEP x P = P = F (P - V)/P F P - V F 1 - V/P Profit= TR - TC = Px - (F + Vx) = Px - F - Vx = (P - V)x - F

S7 - 39© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Example Fixed costs = $10,000 Material = $.75/unit Direct labor = $1.50/unit Selling price = $4.00 per unit BEP $ = = F 1 - (V/P) $10, [( )/(4.00)]

S7 - 40© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Example Fixed costs = $10,000 Material = $.75/unit Direct labor = $1.50/unit Selling price = $4.00 per unit BEP $ = = F 1 - (V/P) $10, [( )/(4.00)] = = $22, $10, BEP x = = = 5,714 F P - V $10, ( )

S7 - 41© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Example 50,000 – 40,000 – 30,000 – 20,000 – 10,000 – – |||||| 02,0004,0006,0008,00010,000 Dollars Units Fixed costs Total costs Revenue Break-even point

S7 - 42© 2011 Pearson Education, Inc. publishing as Prentice Hall Break-Even Example BEP $ = F ∑ 1 - x (W i ) ViPiViPi Multiproduct Case whereV= variable cost per unit P= price per unit F= fixed costs W= percent each product is of total dollar sales i= each product

S7 - 43© 2011 Pearson Education, Inc. publishing as Prentice Hall Multiproduct Example Annual Forecasted ItemPriceCostSales Units Sandwich$5.00$3.009,000 Drink ,000 Baked potato ,000 Fixed costs = $3,000 per month

S7 - 44© 2011 Pearson Education, Inc. publishing as Prentice Hall Multiproduct Example Annual Forecasted ItemPriceCostSales Units Sandwich$5.00$3.009,000 Drink ,000 Baked potato ,000 Fixed costs = $3,000 per month Sandwich$5.00$ $45, Drinks , Baked , potato $72, AnnualWeighted SellingVariableForecasted% ofContribution Item (i)Price (P)Cost (V)(V/P)1 - (V/P)Sales $Sales(col 5 x col 7)

S7 - 45© 2011 Pearson Education, Inc. publishing as Prentice Hall Multiproduct Example Annual Forecasted ItemPriceCostSales Units Sandwich$5.00$3.009,000 Drink ,000 Baked potato ,000 Fixed costs = $3,000 per month Sandwich$5.00$ $45, Drinks , Baked , potato $72, AnnualWeighted SellingVariableForecasted% ofContribution Item (i)Price (P)Cost (V)(V/P)1 - (V/P)Sales $Sales(col 5 x col 7) BEP $ = F ∑ 1 - x (W i ) ViPiViPi = = $76,759 $3,000 x Daily sales = = $ $76, days.621 x $ $5.00 = 30.6  31 sandwiches per day

S7 - 46© 2011 Pearson Education, Inc. publishing as Prentice Hall Reducing Risk with Incremental Changes (a)Leading demand with incremental expansion Demand Expected demand New capacity (c)Attempts to have an average capacity with incremental expansion Demand New capacity Expected demand (b)Capacity lags demand with incremental expansion Demand New capacity Expected demand Figure S7.6

S7 - 47© 2011 Pearson Education, Inc. publishing as Prentice Hall Reducing Risk with Incremental Changes (a)Leading demand with incremental expansion Expected demand Figure S7.6 New capacity Demand Time (years) 123

S7 - 48© 2011 Pearson Education, Inc. publishing as Prentice Hall Reducing Risk with Incremental Changes (b)Capacity lags demand with incremental expansion Expected demand Figure S7.6 Demand Time (years) 123 New capacity

S7 - 49© 2011 Pearson Education, Inc. publishing as Prentice Hall Reducing Risk with Incremental Changes (c)Attempts to have an average capacity with incremental expansion Expected demand Figure S7.6 New capacity Demand Time (years) 123

S7 - 50© 2011 Pearson Education, Inc. publishing as Prentice Hall Expected Monetary Value (EMV) and Capacity Decisions  Determine states of nature  Future demand  Market favorability  Analyzed using decision trees  Hospital supply company  Four alternatives

S7 - 51© 2011 Pearson Education, Inc. publishing as Prentice Hall Expected Monetary Value (EMV) and Capacity Decisions -$90,000 Market unfavorable (.6) Market favorable (.4) $100,000 Large plant Market favorable (.4) Market unfavorable (.6) $60,000 -$10,000 Medium plant Market favorable (.4) Market unfavorable (.6) $40,000 -$5,000 Small plant $0 Do nothing

S7 - 52© 2011 Pearson Education, Inc. publishing as Prentice Hall Expected Monetary Value (EMV) and Capacity Decisions -$90,000 Market unfavorable (.6) Market favorable (.4) $100,000 Large plant Market favorable (.4) Market unfavorable (.6) $60,000 -$10,000 Medium plant Market favorable (.4) Market unfavorable (.6) $40,000 -$5,000 Small plant $0 Do nothing EMV =(.4)($100,000) + (.6)(-$90,000) Large Plant EMV = -$14,000

S7 - 53© 2011 Pearson Education, Inc. publishing as Prentice Hall Expected Monetary Value (EMV) and Capacity Decisions -$90,000 Market unfavorable (.6) Market favorable (.4) $100,000 Large plant Market favorable (.4) Market unfavorable (.6) $60,000 -$10,000 Medium plant Market favorable (.4) Market unfavorable (.6) $40,000 -$5,000 Small plant $0 Do nothing -$14,000 $13,000$18,000