Test Beams: Availability & Plans  KEK  DESY  CERN  Fermilab  SLAC  Other Gene Fisk – Fermilab LCWS_2002 Jeju Do.

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
Argonne Laser Test Stand and Fermilab Test Beam Facility Karen Byrum 8 March, 2007 Status of Argonne Laser Teststand (Joint ANL – UC program) Some first.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) K.T. McDonald, J.C. Sheppard, Co-Spokespersons SLAC Experimental Program Advisory.
PID, trigger and DAQ for the GLAST beam test (preliminary study) Nicola Mazziotta INFN Bari Dec. 6, 2005.
TEST BEAMS Stanford Linear Accelerator Center Ted Fieguth DoE/SLAC Program Review April & May 1, 1997.
GLAST LAT Project Collaboration Meeting 8/30/ Beam Test Plan - SLAC End Station A Secondary Beams Gary Godfrey August 30, 2005 GLAST Collaboration.
experimental platform
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
HARP for MiniBooNE Linda R. Coney Columbia University DPF 2004.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Graphic from poster by Sarah Lamb, UConn Honors Program event Frontiers in Undergraduate Research, April 2009 Collimator subtends
Stopped Muon/Pion Measurements Jim Miller, BU May 2012 UW Test Beam Meeting.
2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
American Detector Irradiation Facilities Erik Ramberg FNAL 22 March, 2011 ALCPG11.
Fermilab Test Beam Facility Aria Meyhoefer (soon to be Soha) May 10, 2010.
Stopped Muon/Pion Measurements Jim Miller, BU May 2012 UW Test Beam Meeting.
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
Asian Test Beam Facilities Satoru Uozumi Kyungpook National University Mar-29 th 2010 Beijing China IHEP Beijing TBF Russia.
Test-beam facility at IHEP CAS An Guangpeng, Li Jiacai CEPC-SPPC Study Group Meeting IHEP
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Overview of the GlueX Tagger and Photon Beamline..
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Beam test possibilities at JINR and Fermilab V. Pronskikh Fermilab 02/15/2012.
GLAST LAT ProjectGlast Collaboration Meeting 2005 R. Bellazzini1 Glast beam test at CERN Glast Collaboration Meeting 2005.
SLAC, September 25, 2009 Searching for a U -boson with a positron beam Bogdan Wojtsekhowski Thomas Jefferson National Accelerator Facility  The light.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
CERN Test Beam Update and Schedule
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
Test Beam: Calorimetric Wishes… Steve Magill, Jose Repond, Andre Turcot, Jae Yu* Jan. 10, 2003 Goals for calorimeter test beam What’s needed for EFA? Requirements.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
Summary of radiation shielding studies for MTA Muon production at the MiniBooNE target Igor Rakhno August 24, 2006.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
RF separated beam and other beam issues Lau Gatignon, COMPASS workshop, 22 March 2016.
1 RHIC NSRL LINAC Booster AGS Tandems STAR 6:00 o’clock PHENIX 8:00 o’clock 10:00 o’clock Polarized Jet Target 12:00 o’clock RF 4:00 o’clock (AnDY, CeC)
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Outlook by the Physics Coordinator
The Beam Test at Fermilab:
DESY Test Beam Facilities - Status and Plan
Test Beams: Availability & Plans
of secondary light ion beams
Irradiation Facilities Questionnaire
CERN Testbeam facilities
K. Kawagoe (Kobe-U) 30-Mar-2010 LCWS10 in Beijing
A summary of world-wide test beam facilities
End Station Test Beam (ESTB) at SLAC
2003 test beam with 25 ns bunched muons
The Status of Fermilab’s Test Beam Facility
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
IPBI-TN R. Arnold (with help from T. Fieguth)
Presentation transcript:

Test Beams: Availability & Plans  KEK  DESY  CERN  Fermilab  SLAC  Other Gene Fisk – Fermilab LCWS_2002 Jeju Do

KEK Test 12 GeV PS Information from:

KEK East Counter Hall T1 and  2 Test Beams in the East Counter Hall

KEK Test Beams KEK 12GeV-PS has two beamlines for beam tests: #1  2 (up to 4GeV) #2 T1 (up to 2GeV) Unseparated beams:  p/p ~ 1%(FWHM). Cerenkov counters exist for e/  separation.   2 has an additional momentum-analyzing magnet, · while T1 does not. Facilities and support are not excellent for foreigners who cannot speak Japanese. Operation itself is easy. Beams are provided in October, November, and December every year until 2003 or Then they will be shut-off due to JHF construction. JLC-CAL will carry out beam tests in 2002 and 2003.

DESY Test Beams* *Information from: N. Meyners Teststrahlung 21,22, 24

DESY Test Beams

DESY Test Beams 21, 22, 24 Bremsstrahlung derived from in a carbon fiber in DESY II is converted to e+e- pairs in Cu, Al of thickness 1 – 10mm. e+, e- momentum selection range: 1 – 6 GeV/c. Intensity: max is ~ 1 kHz/cm 2 (avg)

West Area BeamMax.Momentum (GeV/c) Intensity for incident protons at 450 GeV/c Beam type H3 250~ secondariesParent beam for X5,X7 X tertiaries/10 7 incident particles < 10 6 secondaries Test beam: e, ,  w Gamma Irradiation Facility (GIF) Cs Bq bkgd source X tertiaries/10 7 incident particles < 10 6 secondaries Test beam: e, ,  CERN Beam Lines* * Information supplied by: K. Elsener, L. Gatignon, M. Hauschild

CERN X7 Test Beam

CERN Beam Lines North Area BeamMax.Momentum (GeV/c) Intensity for incident protons at 450 GeV/c Beam type H  + at 200 GeV/c  - at 200 GeV/c e± at 150 GeV/c Pb at 400 GeV/Z 1) High-energy hadron or electron beam (also test beam) 2) Heavy ion beam H4 450 , e fluxes similar to H2 ~ 10 7 protons at 450 GeV/c ~ 10 7 Pb 1) High-energy hadron or electron beam 2) Attenuated primary beam 3) Heavy ion beam H  + at 150 GeV/c  - at 150 GeV/c Medium energy hadron beam, also used to produce tertiary test beams

CERN Beam Lines Beamlines - North Area (cont.) Beam Max.Momentum (GeV/c) Intensity for incident protons at 450 GeV/c Beam type H8 450~ 10 7 protons at 450 GeV/c  + at 200 GeV/c  at 200 GeV/c ~ 10 6 Pb at 400 GeV/Z 1) Attenuated primary or high-energy hadron (e±) beam or electron beam 2) Heavy ion beam M  + at 100 GeV/c  - at 200 GeV/c High-intensity (polarised) muon beam COMPASS P41/ Pb at 400 GeV/Z Primary beam to transport protons or ions from T4 or T6 to ECN3 (NAHIF) K K L > 50 GeV/c K S > 50 GeV/c Simultaneous KS and KL beams to ECN3 North Area (cont.) H2, H4, H6, H8 p e < 250 GeV; high purity electron beams for CAL calib. p h, p  < 350 GeV/c

West Area BeamMax.Momentum (GeV/c) Intensity for incident protons at 450 GeV/c Beam type H3 250~ secondariesParent beam for X5,X7 X tertiaries/10 7 incident particles < 10 6 secondaries Test beam: e, ,  w Gamma Irradiation Facility (GIF) Cs Bq bkgd source X tertiaries/10 7 incident particles < 10 6 secondaries Test beam: e, ,  CERN Beam Lines - Future X5, X7 operational in 2003, 2004; No PS/SPS operation in Under discussion: No West Area operation beyond 2006.

CERN Beam Lines - Future (cont.) North Area BeamMax.Momentum (GeV/c) Intensity for incident protons at 450 GeV/c Beam type H  + at 200 GeV/c  - at 200 GeV/c e± at 150 GeV/c Pb at 400 GeV/Z 1) High-energy hadron or electron beam (also test beam) 2) Heavy ion beam H4 450 , e fluxes similar to H2 ~ 10 7 protons at 450 GeV/c ~ 10 7 Pb 1) High-energy hadron or electron beam 2) Attenuated primary beam 3) Heavy ion beam H  + at 150 GeV/c  - at 150 GeV/c Medium energy hadron beam, also used to produce tertiary test beams Under consideration 2006 and beyond: Keep North Area test beams operational, but limit their use to no more than 2 at any time. Reduce maintenance to regular working hours. Keep COMPASS operational until 2008 at least. Keep NA48 beam line dormant; possibly move GIF to it.

CERN Beam Lines Summary 6 Beam Lines at present West Area: X5(w GIF) & X7 100GeV e, 120 GeV ,h North Area H2, H4, H6, H8 250 GeV e, 350 GeV ,h Future Plans: West Area test beams operate in 2003, No SPS or PS operation in Under consideration 2006 and beyond: Stop West Area test beams; Keep North Area test beams operational, but limit use to no more than 2 at any time. Reduce maintenance to regular working hours. Keep COMPASS operational until 2008 at least. Keep NA48 beam line dormant; possibly move GIF to it.

Fermilab Test Beams Meson Test Beam Facility Meson Lab Experimental Area

Meson Test Beam Facility Mtest – the western-most beamline in the Meson building. User facilities: 6 areas – MT6A1 - 2 & MT6B1 – 4. Two locations are enclosed with A/C, etc. Gases, data and HV cables, trigger and DAQ are supported by the Lab. Type of beam: Secondaries from Main Injector 120 GeV protons on an Al target at 0 o. Modes of operation: “Proton” ~1 MHz of 120 GeV protons. “Pion” ~50 kHz of 5 – 80 GeV secondaries (rate depends on E). e’s ~ 10-20%,  ’s ~ 5%,  ’s ~ 80%; neg. polarity poss. Beam size: 1 cm 2 Instrumentation: 80’ & 50’ Cerenkov counters; 0.5 & 1.0 mm beam PWCs; etc.

= Enclosed climate control areas MT6 Test Beam User Areas = Controlled access gate = Concrete MT6-A1 MT6-A2 MT6-B1 MT6- B4 MT6-B3 MT6-C MT6-B2 ALCOVE CONTROL ROOM COUNTING ROOM MAIN CONTROL ROOM

Booster Radiation Damage Facility Energy = 8 GeV. 3 E E12 protons/1.6  s pulse, monitored with a toroid. Rep rate: 0.2 – 3 s depending on HEP demands. Circular beam size: FWHM = 1.2 cm measured with an MWPC. Temperature controlled box (e.g. 5 o C). Motorized table. In a D0 test of Run 2 Si micro-strips a total dose of 2.1 Mrads (~7 E13 protons/cm2) was delivered to measure: 1. depletion voltage 2. Leakage current # of noisy channels, etc.

Booster Radiation Damage Facility D0 forward disk Si micro-strip wedge detector

Booster Radiation Damage Facility

SLAC

SLAC test beam line -- FFTB There are three possible modes of operation. All provide beam pulses ~ 6ps long at Hz depending on the accelerator program: a) Low intensity electron or positron Typical momentum range GeV. Up to a few x 10^3 particles per pulse, depending on momentum. Space presently available ~1 m to south of beam line, ~2 m to north, ~1 m above and below, ~2m along beam line. SLAC Final Focus Test Beam

b) High intensity electron or positron. Available for very thin materials in vacuum or in some cases in air. Momentum = 28.5 GeV 10 9 to 2x10 10 per pulse (down to 10 7 under development). Various possible experimental stations, all with substantial space constraints. c) Bremsstrahlung beam Peak energy 28.5 GeV Radiator up to 0.02 X o for /pulse electron beam Electron beam pipe passes cm below the gamma ray beam at the experimental station. SLAC FFTB (cont.)

Space on either side or above ~1 m; along beam line ~2 m. In all cases, when the beam is being delivered there is no physical access to the experimental equipment. Tests have also been carried out in recent years in End Station A, where however, the competing experimental program is very full, and it is harder to get time. A tagged Bremsstrahlung beam has been used, as has a very low intensity positive hadron beam. When space and time are available at all, there are usually few space constraints on test apparatus in End Station A. For further information, or possible extensions of the above specifications, contact the Test Beam Coordinator, Ted Fieguth SLAC FFTB (cont.)

More Test Beams around the World Argonne: APS contacted. Brookhaven: No test beams. Cornell: CHESS x-rays useful for some kinds of radiation damage studies. Daresbury: No test beams Frascati: 0.51 GeV e- beam from their 50 Hz linac; 1 – 1 E4 e’s/pulse. IHEP – Beijing: IHEP – Serpukhov: JINR: LAL Orsay: Novosibirsk/BINP: RAL: No test beams. Saclay: TRIUMF: If you have information on test beams that should be included in the LCWS2002 proceedings send it via to:

Summary There are significant test beams at most of our laboratories. Many of you at this meeting include plans to use these test beams in your detector R&D. Most of the facilities require attention by us to make them more user friendly and applicable to our needs. As hardware and software prototypes are developed, and test beam results become available, they will have a significant impact on the research tool we are building. Studies are good; detectors based on tests are better!