Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.

Slides:



Advertisements
Similar presentations
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes on.
Advertisements

CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
AT Equ. Groups / AB-CO Control responsibility Sharing.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Juan Casas1 st June 2007 Instrumentation and controls challenges Juan Casas CERN AT.
130 October 2009 PIC - WIC - LHC_CIRCUIT UNICOS PVSS.
CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA UNICOS: UN IFIED I NDUSTRIAL CO NTROL S YSTEM CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA 1 Marco Boccioli -
Automatic Generation Tools UNICOS Application Builder Overview 11/02/2014 Ivan Prieto Barreiro - EN-ICE1.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
HWCR, AT-ACR-IN, 12 May Cryogenic Instrumentation & Controls Commissioning Hardware Commissioning Review Juan CASAS.
 Mathias Dutour / UAB Dev. team  UNICOS regular meeting  29 January 2009.
AB-CO review Support for Cryogenics. Philippe Gayet AB/CO IS CERN, 20/09/05 Outline Scope Hardware Type, Responsibility sharing, Status Basic software.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
INTERFACE DESCRIPTION PLC objects and HMI 2 CERN, EN/ICE, UNICOS Team.
FAIR Accelerator Controls Strategy
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Overview of the LHC cryogenics control system and available data for RAMS FCC studies Benjamin Bradu, CERN, EN-ICE 1 September 2015.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
FESA FRONT-END SOFTWARE ARCHITECTURE [FESA] Michel Arruat, Leandro Fernandez, Stephen Jackson, Frank Locci, Jean-Luc Nougaret, Maciej Peryt, Anastasiya.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
UNICOS Roadmap 2015 Enrique Blanco On behalf of the UNICOS team EN-ICE 1 March 2015 CERN March 27, 2015 GSI - CERN Collaboration.
60kW Thermosiphon control system
Nikolaos TRIKOUPIS, TE-CRG-CI LS1 projects review: feedback on projects and lessons learnt 01/JUN/2015, Indico
Automating the automation CERN Dr. Enrique Blanco Head of the Process Control section Industrial Controls & Safety Systems Group Beams Department CERN.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
European Organization for Nuclear Research Industrial Controls Group Workshop on QPS Software Layer, 26/08/15
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
UNICOS F RAMEWORK Enrique BLANCO* Industrial Controls & Electronics Group Engineering Department, CERN Geneva, Switzerland * On behalf of the UNICOS team.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
JCOP - 17 October 2001NA60_GAZ - E. Mazel J. Rochez1 A Project for the GAS control System At NA60.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
Industrial Control Engineering ADE Rapid Application Development Environment.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
Vacuum Controls framework for the LHC and its injectors Sebastien Blanchard CERN TE-VSC Integration of controllers in SCADA using OPC Server Goal: Improve.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Alice TOF Production Readiness Review Gas Control Systems.
FESA Overview Leandro Fernandez On behalf of the FESA Team 6/22/2010FESA Overview1.
UNICOS Application Builder Architecture
UAB Extended Configurations
CIET Generation Process in UAB Technical Committee
CV PVSS project architecture
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 0: INTRODUCTION UCPC 6 UNICOS-Continuous Process Control.
ICE Monitoring – status 10 February 2010
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 4: SCADA UCPC 6 UNICOS-Continuous Process Control Check.
CRYOGENICS OPERATIONS 2008 Organized by CERN
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Presentation transcript:

Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS

AB/CO TC 2 Enrique Blanco AB/CO IS CERN, 2/2/05 Outline QRL control system (“Sector 78”, Sector 81) UNICOS architecture Results LHC Tunnel cryogenics control system UNICOS architecture & Cryo Layout Shared responsibilities: AT, AB Current developments Planning CIET CIET: C ryogenics I nstrumentation E xpert T ool Architecture Status and current developments

AB/CO TC 3 Enrique Blanco AB/CO IS CERN, 2/2/05 UNICOS QRL cryogenics control architecture QRL full sector Point 8 Cryogenic control room OWS Quantum S PLC Quantum Schneider PLC S7-400 Siemens PROFIBUS DP networks (4) PROFIBUS PA networks PVSS DS OWS Ethernet TT280 CV180 PV/QV80 PT50 LT1 EH10 all600

AB/CO TC 4 Enrique Blanco AB/CO IS CERN, 2/2/05 QRL cryo control Results First sector: “Sector-78” (600m) was made almost 100% by AB/CO Generation, Logic implementation Support Sector 81 Collaboration between AB/CO/IS, AT ACR/IN & its Polish team (PT) AB/CO IS  Formation of the PT  Providing tools, help on generation and general support AT ACR/IN  Generation tools usage  First-line support AT/ACR expressed his happiness about the control system deployed for the QRL test and the high reactive support provided by AB/CO

AB/CO TC 5 Enrique Blanco AB/CO IS CERN, 2/2/05 QRL cryo control SCADA

AB/CO TC 6 Enrique Blanco AB/CO IS CERN, 2/2/05 Outline QRL control system (“Sector 78”, Sector 81) UNICOS architecture Results LHC Tunnel cryogenics control system UNICOS architecture & Cryo Layout Shared responsibilities: AT, AB Current developments Planning CIET CIET: C ryogenics I nstrumentation E xpert T ool Architecture Status and current developments Open issues

AB/CO TC 7 Enrique Blanco AB/CO IS CERN, 2/2/05 UNICOS LHC cryogenics control architecture LHC Full Sector Local Cryogenic control room CCR OWS …. PVSS DS OWS …. Ethernet PLC S7-400 Siemens WFip Gateways (LINUX) PROFIBUS DP networks (4) PROFIBUS PA networks WFIP Networks (8) RadTol electronics

AB/CO TC 8 Enrique Blanco AB/CO IS CERN, 2/2/05 LHC cryogenics control architecture LHC Full Sector Layout WorldFip Copper cable WorldFip Fiber Profibus Fiber Ethernet UTP Profibus DP Copper cable TT1050 CV300 PV/QV85 PT100 LT50 EH300 all1900

AB/CO TC 9 Enrique Blanco AB/CO IS CERN, 2/2/05 LHC cryogenics control architecture Shared responsibilities AB/CO/IS AB/CO/FE AB/CO/DM PLC & PVSS Gateway application SCADA softwareCIET softwarePLC software AT/ACR IN FESA XML config

AB/CO TC 10 Enrique Blanco AB/CO IS CERN, 2/2/05 LHC cryogenics control architecture Current Activities New SIEMENS S7 UNICOS framework PLC resources optimization CFAWG Functional analysis (identify non conformities) Adequate process requirements to UNICOS Optimal design of the HMI (distributed system) Adapting generation tools to create automatically part of the process logic code (Goal: Minimize manual intervention) Non-conformities treatment Take advantage of the repetitiveness in the tunnel arc Unify the configuration data source Create additional features to ease operation (requirements) Recipe framework Parameters persistency

AB/CO TC 11 Enrique Blanco AB/CO IS CERN, 2/2/05 LHC cryogenics control architecture CFAWG Architecture UNICOS architecture First ideas about elementary circuits HMI Electrical & Cryogenics cells Courtesy of the CFAWG

AB/CO TC 12 Enrique Blanco AB/CO IS CERN, 2/2/05 Logic Files Logic templates Logic generation Logic DB Logic Generator devices DB device type templates Instantiation generation Instance Generator PLC device instance Supervision device instance LHC cryogenics control architecture Model based Generation PLC UNICOS FW UNICOS baseline UNICOS comm. interface Supervision Device instantiation Scripts Meta-Model Generator Meta-Model META-MODEL Complete Logic code Replace generic skeleton by Actual logic model

AB/CO TC 13 Enrique Blanco AB/CO IS CERN, 2/2/05 LHC cryogenics control architecture Last planning 20 agents 2 proto 5/8 Electronics ready DFB?? Know delay??

AB/CO TC 14 Enrique Blanco AB/CO IS CERN, 2/2/05 Outline QRL control system (“Sector 78”, Sector 81) UNICOS architecture Results LHC Tunnel cryogenics control system UNICOS architecture & Cryo Layout Shared responsibilities: AT, AB Current developments Planning CIET CIET: C ryogenics I nstrumentation E xpert T ool Basics & Architecture Status and current developments Open issues

AB/CO TC 15 Enrique Blanco AB/CO IS CERN, 2/2/05 CIET CIET Basics CIET: Cryogenics Instrumentation Expert Tool Diagnostics thru home-made radtol electronics Measurement quality: TT, PT, LT Card reset WFip network TT1050 x 8 CV300 PV/QV85 PT100 LT50 EH300 all1900~ 15200

AB/CO TC 16 Enrique Blanco AB/CO IS CERN, 2/2/05 CIET CIET LHC Full Sector

AB/CO TC 17 Enrique Blanco AB/CO IS CERN, 2/2/05 CIET CIET LHC Full Sector Local Cryogenic control room CCR OWS …. PLC S7-400 Siemens PROFIBUS DP networks (4) PROFIBUS PA networks WFIP Networks (8) WFip Gateways (LINUX) PVSS DS OWS …. Ethernet RadTol electronics PVSS DS CIET UNICOS

AB/CO TC 18 Enrique Blanco AB/CO IS CERN, 2/2/05 AB/COAT/ACR Instrumentation expert tool Cryo control CIET CIET Basic components PLC S7 PVSS DSOWS PVSS DSOWS Thermo DB LHC Controls configuration Cryogenics gateway application (FESA framework) Agent 1Agent 2Agent x IEPlc CMW XML configuration file WFip Generator FESA conf

AB/CO TC 19 Enrique Blanco AB/CO IS CERN, 2/2/05 CIET CIET Components and AB/CO responsabilities Control system specsAdditional specs Specs DB (Access) S7 PLC SCADA PVSS Cryo Gateway CIET PVSS Configuration Code UNICOS Generator Configuration XML config Generator FESA DB IS FE DM AB/CO: Cryo Control System

AB/CO TC 20 Enrique Blanco AB/CO IS CERN, 2/2/05 CIET CIET Status & Current Developments Input from AT ACR/IN Definition of the specs to be filled No electronics prototypes up to now. Supervision First prototype is done Interfaces: CMW properties refinement To do list: [AB/CO IS] ThermBase DB query for updating calibration curves. [AB/CO IS] Automatic generation of the configuration file Gateway First prototype is almost finished [75%] To do list: [AB/CO FE] Synchronization (FESA process must be triggered by the FIP process) [AB/CO FE, IS] Diagnostic data format: Devices, Gateway, Agents, …?? [AB/CO FE] FIP process optimization [AB/CO FE] Startup problem (SHM) [AB/CO FE, DM] Automate FESA XML Instantiation Planning First electronics about 15 Feb (2 agents), 20 agents in the tunnel by end of February

AB/CO TC 21 Enrique Blanco AB/CO IS CERN, 2/2/05 LHC cryogenics control architecture Last planning 20 agents 2 proto 5/8 Electronics ready DFB?? Know delay?? Prototyping DB filled

AB/CO TC 22 Enrique Blanco AB/CO IS CERN, 2/2/05 Conclusions QRL Sector 78 & Sector 81 First integration was really satisfactory LHC Tunnel cryogenics New architecture using UNICOS S7 Tight scheduling involving many iterations Commissioning: Full structure for a sector: 4 gateways, 3 PLCs, ~ 2000 I/O Communications between PLC & Gateway (IEPLC) Under discussion: Return Module, RF CIET Prototyping phase (~ 2 months) Missing tools: Generation of the supervision configuration file DB tool for FESA XML (device instantiation)

AB/CO TC 23 Enrique Blanco AB/CO IS CERN, 2/2/05 And… Questions ?