ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.

Slides:



Advertisements
Similar presentations
MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
Advertisements

Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
UNC Urgent Modification Proposal 0275 Timeline.  Day 1  User raises APP Conquest Query with requested loads (BSSOQ, SOQ, SHQ) and provides warrant from.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
The AQ Operational Review Group ‘Mid-process’ Forum Via teleconference 4 th September 2014 “Whilst every effort is made to ensure the technical accuracy.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
PN UNC Workgroup iGT Services 7 th February 2012.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
IGT and Shipper Workgroup meeting 28 th February 2011.
CONFIDENTIAL - Modification Proposal 0395 © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Consideration of issues raised by UNC Modification Proposal 0244
RBD NOTIFICATION PROCESS
Options for Mod 640 Replacement
MOD570 Obligation on Shippers to provide at least one valid meter reading per meter point into settlement once per annum 25th February 2016 Angela Love.
PN UNC Workgroup Invoicing 4th October 2011.
Project Nexus Workgroup
Project Nexus Workgroup
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Modification 0117 – Additional Considerations
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
Topic raised at July 2009 Distribution Workstream
Project Nexus Workgroup
Mod Proposal 0268 : AQ Backstop Date
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
UK Link Replacement Programme additional supporting UNC modifications
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Project Nexus Workgroup
MOD 640 INVOICING VALIDATION RULES
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Implementation Approach Distribution Workgroup – June 2014
CONFIDENTIAL - Inter Shipper Discussion Process Initial Discussions © 24 November 2009 EDF Energy plc. All rights Reserved.
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Modification Proposal 136
Meter Read Rejections ..
Project Nexus Workgroup
Transmission Workstream 05 November 2009
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights reserved. Meter Reading Replacement Modification Proposal - Update Stefan Leedham 26 August 2009

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 3 OBJECTIVES Action to provide examples Define Replacement Meter Readings Proposed solution User Pays Way forward

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 4 EXAMPLES Cross Meters: requirement to ensure that all meter readings are registered to the correct MPRN and address Duplicate readings: meter reader versus consumer versus xoserve IT issues Incorrect MAM flows EDF Energy requires the ability to correct data for sites were an error has occurred.

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 5 METER READING REPLACEMENT UNC TPD J 3.7.3: “In respect of the most recent Valid Meter Reading provided to the Transporter in accordance with paragraph 3.4 or 3.5 a User may at any time secure and provide to the Transporter a revised value of such Valid Meter Reading ("Revised Meter Reading"). “ UNC TPD J 3.7.4: “The Transporter will only accept such Revised Meter Reading where the Meter Read Date of such Revised Meter Reading is the same as or later than the Meter Read Date of the most recent Valid Meter Reading recorded by the Transporter.”

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 6 REPLACEMENT METER READING Based upon the current UNC a replacement meter reading is: Any meter reading taken on a date the same as or later than the most recent meter reading. Therefore the replacement meter reading does not have to be taken on the same date. EDF Energy is looking to maintain the same principle for meter reading replacement but allow the replacement of a meter reading when a subsequent read has been submitted.

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 7 REPLACEMENT METER READING TIMELINE Meter Reading Submitted to xoserve Replacement meter reading can be submitted for any subsequent day Closed

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 8 PROPOSED SOLUTION Create new meter reading type of Historic Revised Meter Reading An Historic Revised Meter Reading can replace a meter reading were a subsequent meter reading has been submitted provided that the date is later or the same as the meter reading it is replacing but earlier than the subsequent meter reading. The Historic Revised Meter Reading will be available for AQ Amendments and AQ Appeals The original meter reading will be used for any adjustments. This will be a temporary solution until system developments allow full retrospective updates including reconciliation. A User Pays Meter Reading Replacement report will be available to Users on a User Pays basis.

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 9 PROPOSED REPLACEMENT METER READING TIMELINE Meter Reading Submitted to xoserve Replacement meter reading can be submitted for any subsequent day up to D+64 Subsequent Meter Reading Submitted to xoserve D+65

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 10 USER PAYS EDF Energy believes this is a User Pays service: Additional service Shippers can chose to take the service Temporary solution Proposed funding: Development costs: 75% Shippers 25% Transporters Operational costs: 100% Shippers ICAM suggests 50/50 – but majority of benefits to Shippers Proposed Charges: Development costs: p/peakdaykWh/day Operational costs: p/Historic Revised Meter Reading submitted

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 11 WAYS FORWARD Any further development of Modification required? Are the business rules clear enough for a ROM? Options: 1. Mod/business rules require further development 2. A Transporter raises a ROM request with xoserve. The ROM is discussed at distribution workstream – how long will this take? Workstream report completed when ROM received Proposal and report submitted to panel for consideration 3. Mod Panel instructs Gas Transporters to construct a ROM

METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 12 QUESTIONS

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights reserved. THANK YOU