The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.

Slides:



Advertisements
Similar presentations
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Progress and Plan for Superconducting RF Cavity RF Group.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Meeting summary (so far, Monday morning) and comments Tom Peterson, Camille Ginsburg (FNAL), Alex Ratti (LBNL) Crab Cavity Meeting, CERN, 1-6 Aug 2013.
Ofelia Capatina on behalf of the CERN specification team
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
LIU-SPS RF Power upgrade | 09 December 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The review held at CERN, 10 – 11 Nov. 2015
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Crab Cryostat Integration and Planning Meeting – some outcomes
Crab Cavity Technical Coordination meeting:
CERN – Zanon discussions
MQXC Nb-Ti 120mm 120T/m 2m models
Preparation of functional/engineering specifications for HL-LHC
Plans towards CC in the LHC a US – centric perspective
WP5 Elliptical cavities
at STFC Daresbury laboratory
Crab Cavities Contribution from the U.S.
Status of design and production of LEP connection cryostat
CERN Engineering Specification
SPS cryogenic proximity equipment and SM18 validation
BDS Cryogenic System RDR Status and EDR Plans
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
International Review of the Crab Cavity Performance for HL-LHC Close-out Executive Summary HL-LHC CC Review Panel Mark Champion (ORNL), Mike Kelly (ANL),
Hollow e- lens, Cryogenic aspects
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
SRF Section Cuvée 2014.
HIE-LINAC status report
IHEP Cryomodule Status
SPS-DQW HOM Measurements
Crab – RFD prototype: Fabrication Status Update
Magnetic shielding and thermal shielding
Presentation transcript:

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Crab cavities cryomodule Federico CARRA CERN, EN/MME On behalf of crab cavities collaboration team

General FC, 20/November/2014 4th HiLumi-LHC/LARP annual KEK2 LHC Point 1 (vertical crabbing) 4 cavities / IP side/ beam to be installed during LS3 LHC Point 5 (horizontal crabbing) 4 cavities / IP side/ beam to be installed during LS3 SPS BA4 (vertical or horizontal crabbing) One or two cryomodules with 2 identical cavities to be tested before LS2 SM18 area Cold tests and clean room facilities – cold test of cryomodules prior tunnel installation

LHC General FC, 20/November/2014 4th HiLumi-LHC/LARP annual KEK3 See presentation by Paolo Fessia this morning 4 cavities / IP side / beam between D2 and Q4 => Total 32 cavities in LHC

LHC 4 cryomodules x 2 cavities each / IP side General FC, 20/November/2014 4th HiLumi-LHC/LARP annual KEK4 See presentation by Paolo FESSIA this morning Lateral view Top view

SPS Tests cavities with beam before LS2 – space for one cryomodule General FC, 20/November/2014 4th HiLumi-LHC/LARP annual KEK5 See presentations this morning by Alick MACPHERSON Krzysztof BRODZINSKI 4 cavities / IP side / beam between D2 and Q4 => Total 32 cavities in LHC

SPS 2 (identical) cavities in a cryomodule 2 different cryomodules under design Timeline: General FC, 20/November/2014 4th HiLumi-LHC/LARP annual KEK6 4 cavities / IP side / beam between D2 and Q4 => Total 32 cavities in LHC 2015 Cavities fabrication and testing & Cryomodule fabrication 2016 Cryostating & SM18 Cryomodule tests End 2016 Install Cryomodule 1 in SPS 2017 SPS Run 1 End 2017 Install Cryomodule 2 in SPS 2018 SPS Run 2

Two different cryomodules under development 7 Cryomodule with DQW cavitiesCryomodule with RFD cavities 4th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 Cryomodule

8 Cryomodule with DQW cavities 4th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 Cryomodule Vacuum vessel Warm magnetic shielding Thermal shielding Fundamental Power Coupler High Order Modes Suppressor Tuning system Helium vessel Cavity Alignment monitoring system

9 Cryomodule with RFD cavities 4th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 Cryomodule See presentation by Vincent BAGLIN this morning

DQW 104th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 RFD Bare cavities See presentation by Alessandro RATTI this morning Engineering specification by CERN / checked with LARP & UK EDMS “Engineering Specification for the dressed bulk niobium Crab Cavities” Manufacturing of cavities launched by LARP, close collaboration with CERN for QA follow-up

11 DQW Specification drawing – LHCACFCA0001RFD Specification drawing – LHCACFCA0002 4th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 Bare cavities

DQW 124th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 RFD Dressed cavities Detailed design for manufacturing under finalization including helium vessel, HOM couplers, interface for tuning system and alignment system Manufacturing feasibility tests launched at CERN for different components: cavity, helium vessel, HOM, tuning system

134th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 Cold magnetic shielding Cold magnetic shielding inside helium vessel Developed by colleagues from UK

144th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 Tuning system Tuning system development Main integration constraint: limited space below RF Waveguide DQW RFD Dedicated set- up in SM18 for tuning system validation on PoP cavities Concept approved, fabrication drawings in progress

154th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 Higher Order Modes suppressor couplers HOM couplers: Extensive collaboration between LARP, UK, CERN Complex shapes of bulk niobium with tight tolerances Actively cooled by superfluid helium at 2K Manufacturing specification drawings ongoing DQW RFD

164th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 Vacuum vessel Mechanical optimization of vacuum vessel to limit deformation and guarantee cavity alignment in operation

174th HiLumi-LHC/LARP annual KEK FC, 20/November/2014 Optimisation of thermal performance Cryomodule thermal performance detailed optimization: Example : HOM coaxial line – static and RF losses – geometry and thermalisation optimisation EDMS v.1 Total 2K : ~ 32 W (static + dynamic)

Conclusions Two crab cavities designs considered for tests in SPS Two related cryomodules development ongoing Bares cavities manufacturing launched; Close collaboration for engineering specification and manufacturing among UK, LARP and CERN Dressed cavities manufacturing specification drawings ongoing, will be launched for manufacturing this year Cryomodule parts under detailed design, manufacturing during 2015 First cryomodule planned to be tested in SM18 mid-2016 and installed in SPS end-2016 Cryomodule design for LHC planned to be as close as possible to SPS solutions FC, 20/November/2014 4th HiLumi-LHC/LARP annual KEK18