PH Theme 3 R&D Meeting with WP leaders 3/7/2008. Overview of WP’s.

Slides:



Advertisements
Similar presentations
Can we boost efficiency through working in consortia ? Getting accountability and partnership issues right.
Advertisements

GridPP News Oversight Committee Project Manager Reporting Mechanism Web pages ATLAS/LHCb workshop.
CMS Upgrade Issues LHCC 1 July July 20081J. Nash - CMS Ugrades.
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
Leadership and Governance. Developing an integrated sustainability strategy.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
HL-LHC Quality management
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Margaret Martin Gardiner Assessment Librarian The University of Western Ontario LibQUAL+2007 Canada 25 October 2007.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Lucie linssen, April 8th 2008, SLHC-PP kick-off meeting 1 The SLHC-PP project Welcome and overview of the project This project.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
LEARNING WITH CERN KICK-OFF MEETING WP2 – first thoughts Peter Watkins University of Birmingham (thanks to Sofoklis for many inputs)
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Summary of Opening Session Emmanuel Tsesmelis / CERN CARE-HHH-APD Workshop Arcidosso 2 September 2005.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
Lucie Linssen, CLICdp, bi-monthly meeting, 3 Aug General news CLICdp monthly meeting August 3 rd 2015.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
HL-LHC Organization: Now and post HiLumi
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
Upgrade Review Meeting Introduction Craig Buttar University of Glasgow RAL 10/5/11.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
PH Theme 3 R&D Introduction Lucie Linssen Meeting with WP leaders 3/11/2008.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
Transport and Handling Manpower Planning S. Prodon – LEAF
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
17 September 2004David Foster CERN IT-CS 1 Network Planning September 2004 David Foster Networks and Communications Systems Group Leader
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
Mandate First draft plan is attached to agenda -- please give feedback
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Annual Report Instructions
Upgrade Strategy for the Experimental Vacuum Systems
Snowmass on the Mississippi
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
Presentation transcript:

PH Theme 3 R&D Meeting with WP leaders 3/7/2008

Overview of WP’s

Fellows/associates/students

In total now 31 FTE engaged on the projects (out of 56 FTE initially foreseen for ) Fellows budget overcommitted in 2008 and 2009 ( kCHF) NO fellows can be taken in Nov ‘08 (May ‘09) committee Doct students, there is room for ~2 DOCT/TECH students to be requested at the next committee (approx. priority WP9, WP7, WP6, WP1, WP10)

Materials budget To be reviewed at the end of August – 2008 provision – 2009 request

2-phase LHC upgrade Phase I: Linac4 + new NbTi triplets 2013, after ~normal shut-down period Towards peak luminosity ~3*10 34 ATLAS upgrade: pixel b-layer CMS upgrades: new pixel detector (+ stages muon end-cap chambers) LHCb: many electronics/trigger upgrades to make better use of available luminosity

2-phase LHC upgrade Phase II: LPSPL + PS2 + LHC interaction region upgrades , after 18-month shut-down period Towards peak luminosity ~10*10 34 Many upgrades, both for ATLAS and CMS Foreseen sequence of technical/approval documents for the experiments: LoI mid 2009 TP mid 2010 TDR mid 2011

WP’s shall stay in line with needs Discussion with the experiments are important to stay in line with the needs and the time-scales of the upgrades ! Be prepared to report on your communication channels Need clear written lists of foreseen annual deliverables (and achievements!) of your WP

Adaptation? A few issues of adaptation, as noticed by me: – WP1: More partners ? – WP4: how to react to shorter SLHC timescale – WP6: organise a broader forum with expt representatives to set up the work plan. What to do with the many 3D integration activities? – WP7: growing need for materials studies (e.g. structural, thermal). Can we fold these into WP7 (by adding resources)?

For discussion Standardised written reporting format? Need for common web pages, EDMS? How to follow up on the faculty meetings, or other form to inform the department in a broad sense.